AGENDA
SARASOTA MANATEE AIRPORT AUTHORITY
REGULAR MEETING
November 17, 2020 - 1:00 p.m.
Dan P. McClure Auditorium East
Call to order, invocation, and pledge to flag.
Election of Officers:
Chairman (Sarasota County)
Vice Chairman (Manatee County)
Secretary (Manatee County)
Chairman Plaque Presentation to Kristin Incrocci (presented by newly elected Chairman)
Introduction of New Employees (AE)
Re Approval: Minutes of Regular Meeting & Public Hearing of September 28, 2020, and Minutes of Special Meeting of October 19, 2020
Citizen's Comments.
Must be limited to an absolute maximum of 5 minutes per person and concern only business that is on the current agenda. If the item concerns a matter not on the current agenda, comments will be heard under "Public Comments" at the end of the meeting. Please fill out a Citizen's Comments form and present it to the Executive Assistant. Any person failing to complete this form in its entirety and/or who fails to identify the agenda topic will not be heard. No individual may give his/her time to another speaker.
ITEMS NEEDING ACTION
Approval: Changes to The Principal U.S. Property Separate Account Investment Option Included in Authority's Retirement Plans (AE)
Approval: Proposed Schedule of CY 2021 SMAA Board Meeting Dates (FJP)
Approval: Proposed Schedule of Calendar Year 2021 Employee Holidays (FJP)
Approval: Amendment No. 4 to Scheduled Airline Operating Agreement and Terminal Building Lease (FJP)
Approval: SMAA Resolution 2020-08, Ratifying The Appointment of Membership to Fire Prevention Code Board Of Appeals by Manatee County Fire Chiefs' Association (FJP)
DEPARTMENT REPORTS
Financial Statements (AE)
Investment Portfolio (AE)
Finance & Administration Department (AE)
Real Estate Development & Properties Department (FJP)
ARFF, Operations & Police Departments (FJP)
Development/Community Relations, Activity Report (FJP)
Engineering, Planning & Facilities Departments (FJP)
Internal Audit & Investment Compliance (FJP)
Information Technologies (FJP)
Attorney Presentations (D. Bailey)
Page 2
Download HTML
Old/New Business
Public Comments
Comments must be limited to absolute maximum of five (5) minutes per person. Anyone wishing to speak must complete a Citizen's Comment form and present it to the Executive Assistant prior to the beginning of the meeting. No individual may give his/her time to another speaker.
Comments by Commissioners
Adjournment
Page 3
Download HTML
AGENDA ITEM NO. 5
โฆโฆ
SARASOTA MANATEE AIRPORT AUTHORITY
REGULAR MEETING & PUBLIC HEARING
Monday, September 28, 2020 - 1:00 p.m.
Dan P. McClure Auditorium East
THOSE PRESENT:
Kristin Incrocci, Chairman
John Stafford, Vice Chairman
Doug Holder, Secretary
Carlos Beruff, Commissioner
Bob Spencer, Commissioner
Fredrick J. Piccolo, President, Chief Executive Officer
C. Dan Bailey, Jr., Airport Counsel
Mark Stuckey, Exec. VP COS
Anita Eldridge, Sr. VP, Finance & Administration
Kent Bontrager, Sr. VP Engineering & Facilities
Karen Garofalo, Executive Assistant โ SMAA
THOSE ABSENT:
Commissioner Peter A. Wish (via
teleconference)
Item 1. Call to Order, Invocation, and Pledge to Flag
Chairman Incrocci called the meeting to order at 1:00 p.m. and gave the invocation and led the pledge of allegiance to the flag.
Item 2. Re Approval: Participation in Meeting Discussion via Amplified Telephone by Commissioner Wish
Chairman Incrocci stated that Commissioner Wish is unable to be physically present today, but desires to participate and address the assembly by means of amplified telephone. Article II, Section 5. D. of the Authority bylaws permits this if a majority of a quorum of the Board votes to permit it, and if Commissioner Wish does not make, second or vote on any motions. The Board unanimously approved a motion to allow Commissioner Wish to address the Board by amplified telephone without making, seconding or voting on any motions.
MOTION: Commissioner Stafford moved approval for Commissioner Wish to participate and address the assembly by means of amplified telephone, as permitted in Article II, Section 5.D. of the Authority bylaws, if a majority of a quorum of the Board votes to permit it, and if Commissioner Wish does not make, second or vote on any motions. Commissioner Beruff seconded. MOTION PASSED UNANIMOUSLY (5 -0).
Item 3. Presentation of Florida's 16th District Congressional Law Enforcement Dedication and Professionalism Award to Airport Police Sergeant Jeremy Beal.
Chairman Incrocci presented to Sergeant Beal the Congressional Law Enforcement Dedication and Professionalism Award received from the 16th District Office of Congressman Vern Buchanan for his outstanding service to the law enforcement community. Sgt. Beal accepted the award and thanked the Command staff and the Airport Authority Board for their support.
Page 4
Download HTML
SMAA Minutes
September 28, 2020
Page 2 of 6
Item 4. Introduction of New Employees
Ms. Eldridge introduced new employee, Kevin Phillips, Maintenance Technician in the Facilities Department.
Items 5. Public Hearing Regarding Approval of SMAA Resolution 2020-05 Adopting FY2021 Budget Establishing Airline Rentals, Fees and Charges, Designating Employee Promotion Increases, Contributions to Employee Defined Contribution Retirement Plan, Employer Contribution Credit to 457(f) Retirement Plan, and Public Parking Rates
Chairman Incrocci opened the public hearing on SMAA Resolution 2020-05 Adoption of FY2021 Budget Establishing Airline Rentals, Fees and Charges, Designating Employee Promotion Increases, Contributions to Employee Defined Contribution Retirement Plan, Employer Contribution Credit to 457(f) Retirement Plan, and Public Parking Rates. Karen Garofalo, Notary Public, administered the oath to those taking part in today's public hearing. Staff members, Fredrick Piccolo, Anita Eldridge, Mark Stuckey, Kent Bontrager, and C. Dan Bailey, Airport Counsel, were sworn in. No members of the audience came forward to offer testimony.
Chairman Incrocci requested a member of staff summarize the budget proposal. Mr. Piccolo advised that the Board held a Workshop on August 24, 2020, to review the FY2021 Budget in detail. No issues were raised by the Board at that meeting. He stated he is very pleased with this particular budget as it was extremely challenging because of the complications of COVID during the past year. A meeting was held with the airport's signatory airlines to review the budget and stated they are very pleased with its proposal. He read into the record, a letter from Amira Trebincevic, Chairman of the Airport Airline Affairs Committee on behalf of the airport's signatory airlines, recognizing the efforts of the airport's management team and employees (attached to original minutes as Exhibit A).
Chairman Incrocci requested comments from the Board on the budget as presented. There were no questions. No members of the audience came forward to offer evidence or testimony for this public hearing. Chairman Incrocci requested a motion to close the public hearing.
MOTION: Commissioner Stafford moved approval to close the Public Hearing on SMAA Resolution 2020-05 Adoption of FY2021 Budget Establishing Airline Rentals, Fees and Charges, Designating Employee Promotion Increases, Contributions to Employee Defined Contribution Retirement Plan, Employer Contribution Credit to 457(f) Retirement Plan, and Public Parking Rates. Commissioner Beruff seconded. MOTION PASSED UNANIMOUSLY (5-0).
Item 6. Approval of SMAA Resolution 2020-05 Adopting FY2021 Budget Establishing Airline Rentals, Fees and Charges, Designating Employee Promotion Increases, Contributions to Employee Defined Contribution Retirement Plan, Employer Contribution Credit to 457(f) Retirement Plan, and Public Parking Rates
Chairman Incrocci requested a motion to approve the FY 2021 budget.
MOTION: Commissioner Holder moved approval of SMAA Resolution 2020-05 Adoption of FY2021 Budget Establishing Airline Rentals, Fees and Charges, Designating Employee Promotion Increases, Contributions to Employee Defined Contribution Retirement Plan, Employer Contribution Credit to 457(f) Retirement Plan, and Public Parking Rates. Commissioner Beruff seconded. MOTION PASSED UNANIMOUSLY (5-0).
Page 5
Download HTML
SMAA Minutes
September 28, 2020
Page 3 of 6
Item 7. Approval of the Minutes of the Budget Workshop of August 24, 2020, and Regular Meeting of August 24, 2020
The Board approved the minutes of the August 24, 2020 Budget Workshop and the August 24, 2020 Regular Meeting as presented.
MOTION: Commissioner Spencer moved approval of the minutes of the August 24, 2020 Budget Workshop and Regular Meeting of August 24, 2020 as presented. Commissioner Beruff seconded. MOTION PASSED UNANIMOUSLY (5-0)
(Item 10A. brought forward at this time)
Item 10A. Approval: RFQ-06-2019-CONRAC, Professional Services to Design the Consolidated Rent-A-Car Facility
Mr. Piccolo advised staff received Request for Qualifications for a qualified firm capable of providing professional engineering services and architectural design services to develop a new Consolidated Rent-A-Car Facility (CONRAC) off Rental Card Road. The facility will consolidate rental car storage, cleaning, automotive maintenance, and fueling activities for all rental car operators at SRQ. Staff reviewed the submitted responses and selected three proposing firms to make presentations today at which time the Board will rank the firms.
Mr. Bailey explained the general protocol for presenters and the voting process that would take place following the presentations. Under CCNA, no clear law exists, therefore, competing firms have the right to remain in the room while competitors are presenting. He advised that the tradition at the airport is for the firms chosen to present, leave the room during the other presentations, but it is not required.
Each firm made presentations in alphabetical order: Demattei Wong Architecture; Infrastructure Consulting & Engineering PLLC; and PGAL. The Board selected the first, second, and third choice firm, with Mr. Bailey conducting the ballot voting process.
The ballot vote for first choice resulted in three votes for PGAL, one vote for Infrastructure Consulting, and one vote for Demattei Wong. The ballot vote for second choice resulted in four votes for Infrastructure Consulting, and one vote for Demattei Wong. The Board ranked the firms as follows:
PGAL
Infrastructure Consulting & Engineering
Demattei Wong Architecture
Contract negotiations will begin with the first ranked firm of PGAL and a contract will be brought back to the Board if successful.
MOTION: Commissioner Stafford moved approval of the selected firms of PGAL as first ranked firm; Infrastructure Consulting & Engineering as second ranked firm; and Demattei Wong Architecture as third ranked firm; and for staff to negotiate scope and fees with the first ranked firm and if successful to present contract for approval at the next Board meeting and prepare all documents necessary to implement this action. Commissioner Beruff seconded. MOTION PASSED UNANIMOUSLY (5-0)
Page 6
Download HTML
SMAA Minutes
September 28, 2020
Page 4 of 6
Item 8. Presentation of Master Plan Update โ AECOM
Mr. Piccolo advised that the Master Plan presentation is a working draft and not the final master plan with periodic updates given to the Board under the agreement. This is the first update for review. He introduced Mr. Steve Henriquez and Mr. Howard Klein, from AECOM and stated that staff has been meeting on a frequent basis with Mr. Klein and his team to review all issues of the Master Plan. Mr. Klein advised the Board that the plans are nearly seventy percent complete and the recommended projects identified. They are currently refining the cost estimates on the identified projects and phasing will commence to develop the capital improvement plans for the financial consultant to assess the financial feasibility of the projects. The draft plan should be completed by the end of this year and forwarded to the FAA and FDOT for their review.
Mr. Klein presented a PowerPoint forecast working through each project in the Master Plan by area/function of the airport. All forecasts presented were developed and approved by the FAA prior to COVID. Presentation topics included forecasts, airfield projects, terminal projects, North Quadrant projects, roadway and parking projects and support facility projects. He reviewed passenger forecast numbers and scenarios for baseline, high and low growth projections and stated the enplanement projections going forward for SRQ are at 1.5%, which is faster than the FAA national rate at 0.9% for airports. The forecast projection for based aircraft is at 1.5% assuming the airport can accommodate the demand for hangar space by aircraft owners. He identified existing and future design aircraft for the airfield and reviewed aerials of AECOM's recommendations for various projects i.e., proposed runway shift & displacement of landing thresholds, proposed taxiway segment removal and replacement area, and proposed parcel or easement acquisitions areas. He reviewed relocation of the existing ASOS to take advantage of potential development at the north end of the airport.
From the PowerPoint, Mr. Klein reviewed additional terminal projects in the Master Plan including the Concessions/Holdroom Expansions, New Concourse A, the General Aviation Federal Inspection Services facility, Baggage Claim Expansion and Pedestrian bridge and concessions reconfiguration. He identified and discussed the terminal requirements for the projects by using Planning Activity Levels (PAL) for the facility's demand capacity. By this process, Concessions, Holdrooms, and Gates would need improvements earlier than the security checkpoint and baggage claim areas. He discussed expansion of the concourse going east of the current concourse at Gate B1 and configuration of the additional gates for new Concourse A. He discussed a possible general aviation FIS facility gate at lower cost. He reviewed a possible option for redevelopment of concession space near Dewar's to construct a passenger bridge that would improve the flow of passengers not checking baggage and not needing to enter the bag claim area. He reviewed various options for the north airfield including additional aprons, conventional hangars and t-hangars. He reviewed options for a roadway and parking project and discussed the ground transportation center and parking expansions within the Master Plan.
Following the presentation, Mr. Piccolo stated AECOM has done excellent work on the Master Plan and will continue going forward. We are looking at a twenty-year window and we will ensure costs of all improvements are prudent and functional. Chairman Incrocci thanked Mr. Klein and staff for a very well done presentation.
Item 9. Citizens Comments
No Citizen Comments were offered.
Page 7
Download HTML
SMAA Minutes
September 28, 2020
Page 5 of 6
em 10. ITEMS NEEDING ACTION
10A. (See Page 3 of Minutes)
10B. Approval: Construction License Agreement with Ryan Companies US, Inc.
10C. Approval: Extension of COVID-19 Relief Guidelines to Defer/Waive Airport Tenant Rents and Fees
10D. Approval: SMAA Resolution 2020-06, One Time Substitution to Various Employee Incentive Programs (Approved with revision as discussed)
Mr. Piccolo requested a revision to the agreement to eliminate the term "union contract agreements" from the Resolution. Following consultation with Airport legal team, and as this is a voluntary program, we do not want to set a precedent as it is not in the Police Union contract.
10E. Approval: Letter of Agreement for Establishment of Aviation Immersion Program
10E.Approval: Letter of Agreement for Establishment of Aviation Immersion Program
MOTION: Commissioner Stafford moved approval of Agenda Items 10B. Approval of Construction License Agreement with Ryan Companies US, Inc; Item 10C. Approval of Extension of COVID-19 Relief Guidelines to Defer/Waive Airport Tenants Rents and Fees; 10D. Approval of SMAA Resolution 2020-06, One Time Substitution to Various Employee Incentive Programs; Agenda Item 10E. Approval of Letter of Agreement for Establishment of Aviation Immersion Program. Commissioner Beruff seconded.
AMENDED MOTION: Commissioner Stafford moved approval of Agenda Items 10B. Approval of Construction License Agreement with Ryan Companies US, Inc; Item 10C. Approval of Extension of COVID-19 Relief Guidelines to Defer/Waive Airport Tenants Rents and Fees; 10D. Approval of SMAA Resolution 2020-06, One Time Substitution to Various Employee Incentive Programs (with revision to Resolution to eliminate the term "union contract agreements" from Resolution); and Agenda Item 10E. Approval of Letter of Agreement for Establishment of Aviation Immersion Program. Commissioner Beruff seconded. MOTION PASSED UNANIMOUSLY (5-0)
Item 11. Department Reports
The following department reports were accepted:
Financial Statements
Investment Portfolio
Finance & Administration Department Report
Real Estate Development & Properties Department
ARFF, Operations & Police Departments
Development/Community Relations Report, Activity Report
Engineering, Planning & Facilities Departments
Internal Audit & Investment Compliance
Information Technologies
Information Technologies
Item 12. Attorney Presentations
No items offered.
Item 13. Old/New Business
No items offered.
Page 8
Download HTML
Page 9
Download HTML
SARASOTA MANATEE AIRPORT AUTHORITY
MINUTES - SPECIAL MEETING
October 19, 2020 โ 10:00 A.M.
DMA East, 1st floor terminal
Those Present:
Those Absent: Kristin Incrocci, Chairman Doug Holder, Secretary
Those Presents.
John Stafford, Vice Chairman
Commissioner Carlos Beruff
Commissioner Bob Spencer
Commissioner Peter A. Wish
Fredrick J. Piccolo, President, Chief Executive Officer
C. Dan Bailey, Jr., Airport Counsel
Mark Stuckey, Exec. VP, Chief of Staff
Kent Bontrager, Sr. VP, Engineering & Facilities
Anita Eldridge, Sr VP, Finance & Administration
Kimberly Steele, Technical Support Specialist, IT
Karen Garofalo, Executive Assistant โ SMAA
1. Call to Order.
Vice Chairman John Stafford called the Special Meeting to order at 10:00 a.m. Commissioner Beruff led the pledge of allegiance to the flag.
Mr. Bailey reviewed Ch. 2020-167 (HB 915) s. 332.0075 of the Florida Statutes that became effective October 1, 2020 that poses transparency obligations on the governing board of commercial service airports and effects Item No. 3 of today's agenda. Item No. 3, Approval of Construction contract award for the SRQ Hangar Project exceeds $325,000. The new statute requires this type of item appear as a separate line item on the agenda, and additionally, the public must be given an opportunity to address that item as comments from the public. He will follow up with an email to all Commissioners advising of the new statute requirement. (See page 3 of Minutes, Chapter 2020-167 Discussion)
Open to the Public: Time reserved for Comments on Item 3 of today's Agenda (See Item 3)
3. Approval: BID-06-2020-SMH Construction of the SRQ Maintenance Hangars Project (Manatee Technical College Facilities)
Mr. Piccolo requested approval of the construction contract award to Bandes Construction for the SRQ Maintenance Hangar Project. The Airport, Cirrus Aviation and Manatee Technical College (MTC) each secured partial funding through a Development of Economic Opportunity (DEO) grant to design and construct a maintenance hangar and an airframe and powerplant (A&P) School. Due to COVID, Cirrus Aviation and MTC need additional time to secure additional funding. The airport secured a $3 Million grant from the DEO, which must be expended by July 1, 2021. Therefore, we would like to move ahead with the construction to expend the funds and maintain another month of construction time by not waiting until the November meeting for approval. Fourteen bids were received on October 7 for the project, with the low, responsive bid submitted by Bandes Construction for $3,739,750.83 for the base bid and $14,935,275.83 for the base bid plus additive alternate number one. MTC would like to continue to move forward and present before the Manatee School Board to receive full funding approval of $9 Million within the next four months and commence construction under their own project.
Page 10
Download HTML
SMAA Special Meeting
October 19, 2020
The design is completed and fully paid through the DEO grant. The Airport will do sitework for both the SRQ Hangar and MTC hangar with DEO grant funds. Mr. Piccolo noted that if funding is not available for the hangars, we foresee no issues in leasing those hangars. The Airport has received a 50/50 grant from FDOT for the sitework. Mr. Piccolo answered questions on the time frame for MTC to move on with the project and advised we will continue to market the site to move forward if necessary. He stated MTC believes it will take four months to get their full approval and funding and commence construction in eight months. Our goal is to bring a lease already approved by Manatee County to the Board in January. Following questions, the Board reviewed an aerial map of the location of the project on airport property. Mr. Piccolo advised that there would be two hangars at 25,000 sq. ft., plus 20,000 sq. ft. of classroom facilities, with the design already completed.
MOTION: Commissioner Beruff moved to authorize the Chairman to execute a construction contract with Bandes Construction, pending receipt of grant from FDOT, for the project in the amount up to $3,739,750.83 with a 10% contingency for a total budget of $4,113,725.00. Commissioner Wish seconded. MOTION PASSED UNANIMOUSLY (4-0).
OPEN TO PUBLIC: Ms. Wendy Heath, E & L Construction Group, Inc. addressed Item No. 3, Construction of the SRQ Maintenance Hangars Project and stated that E & L Construction Group was the low bidder on the hangar plus alternative bid. She questioned if the discussion now is doing the base bid plus some of the alternate bid as it includes the sitework for the school. Mr. Piccolo stated that the sitework was already included in the base bid. It will be up to MTC to either rebid or do the alternate totally separate. Mr. Piccolo explained that E & L was low bidder for the entire project, with Bandes the low bidder for base bid only. As we decided to move ahead with the base bid only, the bid went to Bandes as low bidder. Mr. Piccolo thanked Ms. Heath for her comments.
4. Miscellaneous Matters
Approval: SMAA Resolution 2020-07 Policy for FY 2021-2022 Air Carrier Incentive Program
Mr. Piccolo requested approval of Resolution 2020-07 Policy for FY 2021-2022 Air Carrier Incentive Program (ACIP) to attract increased commercial flight activity at the airport. He advised that since approval of Resolution 2019-02 in January of 2019, multiple airlines have qualified for fee waivers and marketing funds by adding new nonstop service. Staff would like to extend the ACIP until October 18, 2022 and establish additional appropriation of $750,000 to the $820,150.10 remaining in the ACIP. Mr. Piccolo reviewed the state of SRQ and surrounding airports due to COVID-19 and stated that we are in a much better financial position than other airports, we have tremendous flexibility and far more strategic advantage, and have the ability to attract more service and bring back existing service. The airlines are looking closer at leisure markets because of COVID-19 restrictions and see long term stability, rate reduction and a great leisure market at SRQ. He noted that we budgeted FY21 at 50% revenue but if our numbers continue to increase as they have, we will be far ahead from that standpoint. Mr. Stuckey stated that July and August traffic numbers are up 43%, September 53%, and we expect October to be up 60% to 63%. We have taken advantage of the air carriers wanting to operate into a leisure destination as JetBlue adds Newark service, and United added two times daily to Dulles. Mr. Piccolo noted that last Saturday we had 90% in passengers from last year on the same date, which is phenomenal considering the effects of Covid-19. Mr. Stuckey
2
Page 11
Download HTML
SMAA Special Meeting
October 19, 2020
noted the marketing dollars in the ACIP are matched by both the Bradenton CVB and Visit Sarasota, which doubles the amount we can offer. Last year the airport added $1.3 Million, Visit Sarasota $600,000 and Bradenton CVB $575,000 to market the airlines that qualified for the incentive program.
Mr. Piccolo advised that he is in discussions with the four signatory carriers regarding forgiveness of rents in return for extensions on their agreements and other options and hopes to have new agreements to bring to the Board at the January 2021 meeting. There were questions on contact with other air service carriers. Mr. Piccolo advised that we continue to be in contact with many carriers.
MOTION: Commissioner Beruff moved to approve Resolution 2020-07, Sarasota Manatee Airport Authority Air Carrier incentive Program, funded from unrestricted funds for $750,000 dollars for promotion of additional domestic and international air service at SRQ; it is furthermore recommend that the Public Hearing requirement contained in the Authority by-laws is waived in this instance. Commissioner Spencer seconded. MOTION PASSED UNANIMOUSLY (4-0).
Chapter 2020-167 Discussion
Mr. Bailey advised that Ch. 2020-167 (HB 915) s. 332.0075, of the Florida Statutes, as discussed earlier in the meeting (see page 1 following Call to Order) was in response to the controversial award of a contract to a bridge contractor at Miami International Airport, after that contractor had earlier constructed a bridge that collapsed. The new law seeks greater transparency and accountability by airports in awarding contracts. It requires the posting of certain information on an airport's website and imposes obligations of the governing body to include all published notices of meetings and agendas, official minutes and the budget within seven days of adoption by the Board. Links to Airport Master Plans, financial statistical reports filed with the FAA, and any contract for procurement of services over $65,000, with redaction of any confidential information. Additionally, posting on website all airport positions and salary information (positions only, no names of employees). Historically, as a Special District of the State, we have not been required to comply with Chapter 287 for the purchase of commodities and contractual services, but we have our own Purchasing Policy that basically mirrors Chapter 287. Although going forward we must comply with this particular statute. As we have done today, we must show any contract over $65,000 as a separate item on the agenda and must include Public Comments. We will review our fairly extensive contracts to see how we can comply.
Additionally, beginning January 1, 2021, each member of the government body must complete four hours of ethics training each calendar year, which will include Code of Ethics and Sunshine Public Records requirements. We have one year to accomplish the program and Mr. Bailey will get back to the Board when we have established an adaptable program to ensure the Board's compliance.
3
Page 12
Download HTML
Page 13
Download HTML
AGENDA ITEM NO. 7A
SARASOTA MANATEE AIRPORT AUTHORITY
NOVEMBER 17, 2020 REGULAR MEETING
STAFF NARRATIVE
APPROVAL:
REQUEST FOR APPROVAL: APPROVAL OF CHANGES TO THE PRINCIPAL U.S. PROPERTY SEPARATE ACCOUNT INVESTMENT OPTION INCLUDED IN AUTHORITY'S RETIREMENT PLANS
EXECUTIVE SUMMARY: Staff requests approval to remain invested in the Principal U.S. Property Separate account for the Defined Benefit, Defined Contribution and Deferred Compensation retirement plans, subject to the changes effective January 4, 2021.
NARRATIVE: The Airport Authority provides at no cost to eligible employees a Defined Benefit (DB) Retirement Plan for employees hired before October 1, 2007, and a Defined Contribution (DC) Retirement Plan for employees hired on or after October 1, 2007. The Authority also offers a voluntary Deferred Compensation (457) Plan for eligible employees. All three retirement plans are administered through Principal Financial Group and managed by staff with assistance from Principal Financial Advisors and LPF Financial Advisors.
Each year staff, Principal Financial Advisors, Inc. and LPF Financial Advisors meet to review strategic asset allocation selections, analyze retirement plan assets, and control investment risk by diversifying assets by class, style, and investment manager. Staff with recommendations from Principal Financial Advisors' Inc. and LPF Financial Advisors choose which investments to allocate the DB funds, while participants of the DC and 457 Plans make their individual choices in which investment option(s), they choose to invest their funds.
Changes to the Principal U.S. Property Separate Account ("Separate Account"), effective January 4, 2021 requires the Authority to either approve to remain invested in the Separate Account, subject to the changes, or disapprove the transaction by requesting a redemption of our Plan's units prior to December 15, 2020. As of September 30, 2020, 5.9% of the DB Plan investments were invested in the Separate Account by the Authority, 1.3% of the DC Plan and 3% of the 457 Plan investments were invested in the Separate Account by individual participants.
A brief summary of the changes:
Transfer of nearly all assets and liabilities of the Separate Account to the Principal U.S. Property Portfolio.
Investment in properties is changing from holding all the properties to holding an interest in the Portfolio.
Formation of the Portfolio will allow additional investors not currently eligible.
While evaluating the Separate Account changes, staff worked with Principal Financial Group, the Authority's investment advisors as well as legal counsel specializing in pension benefits to understand the options and make a recommendation to the board.
The benefit in approving the changes and staying invested in the Separate Account is to avoid the possibility of a withdrawal limit, potentially providing greater diversification, higher quality properties, reduction in fixed costs and to allow participants in the DC and 457 plans to make their own decisions if they want to continue to invest in the Separate Account.
We currently have four (4) employees in the DC Plan, and six (6) current and one (1) previous employee in the 457 Plan invested in the Separate Account. To fulfill the Authority's fiduciary duty
1
Page 14
Download HTML
to those participants currently invested in the Separate Account, they will be advised to contact professional advisors familiar with both investments and retirement planning to review their personal investment options to make their own decisions to continue to invest or move their investments out of the Separate Account.
RECOMMENDATION: It is hereby recommended that the Sarasota Manatee Airport Authority approve to continue to invest and offer the Separate Account in the Authority's three retirement plans.
Attachments: Copy of Notice from Principal and Frequently Asked Questions regarding the Principal U.S. Property Separate Account structure changes.
2
Page 15
Download HTML
11/6/2020
Message Center
To: anita.eldridge@srq-airport.com
Received: 10/16/2020, 08:19 PM CT
Product: 708901
Expires: 02/18/2021, 12:00 AM CT
Subject: Principal U.S. Property Separate Account structure changes
โฆโฆ
We're pleased to provide you, as a Plan Fiduciary, some important information about upcoming changes to the Principal U.S. Property Separate Account ("Separate Account"), effective Jan. 4, 2021, or after receipt of all necessary regulatory approvals. It's important that you read this notice and these Frequently Asked Questions to understand the changes and determine whether your plan will remain invested in the Separate Account.
The following is a summary of the changes; more specific information can be found in these Frequently Asked Questions. Later in this notice, you'll be asked to approve or disapprove the proposed changes and, if you disapprove, redeem your Plan's interest in the Separate Account.
What's changing?
The proposed change to the Separate Account structure is the transfer of nearly all of the assets (properties, cash, and other investments) and liabilities of the Separate Account to the Principal U.S. Property Portfolio ("Portfolio"), a newly created real estate operating partnership.
While most assets will be transferred to the Portfolio, the Separate Account will retain some properties (the "Retained Assets"). The investment strategy of the Separate Account is unchanged and the Portfolio will be managed according to that same investment strategy and objective. What will change is how the Separate Account invests in properties. Instead of holding all properties in the Separate Account, the Separate Account will now hold an interest in the Portfolio, which will hold most of the properties, and hold a small number of properties directly as Retained Assets.
On the date of the transfer and for a period of at least six months, only the Separate Account will have an economic interest in the Portfolio. That means that for at least six months following the transfer, unitholders of the Separate Account will have the same ownership interest in the underlying assets of the Portfolio as they did in the Separate Account prior to the transfer. After six months, investors who are not eligible for the Separate Account may be able to invest in the Portfolio through a newly created investment option called the Principal U.S. Property Fund ("Fund").
Why change the structure?
The Separate Account is an Insurance company separate account maintained by Principal Life Insurance Company. Participation in separate accounts is only available to certain types of U.S. based retirement plans, including plans subject to ERISA. The property transfer, creation of the Portfolio and the Fund allow other investors, not currently eligible for the Separate Account, to invest together in the Portfolio and thus create the opportunity for a larger pool of assets held by the Portfolio.
We believe these changes may be favorable to unitholders of the Separate Account by potentially providing greater diversification, higher quality properties, and reduction in fixed cost - among others. Review these Frequently Asked Questions for additional potential benefits.
What do I need to do?
Please provide your affirmative approval or disapproval of the transaction by contacting your Principalยฎ representative, no later than Dec. 15, 2020.
If you provide affirmative approval, your organization's plan will remain Invested in the Separate Account, subject to the changes described in this notice.
If you disapprove of the transaction, you must request a redemption of your Plan's units as described in your Plan's group annultv contract with Principal Life prior to Dec. 15, 2020.
Your redemption request may be subject to a withdrawal limitation until such time as the withdrawal limitation is lifted.
The Fund will not invest in the Portfolio until such time that any plans that do not approve the transaction have redeemed their units.
If you do not provide affirmative approval or disapproval prior to Dec. 15, 2020, you will remain invested in the Separate Account and will be deemed to have approved the Separate Account structure changes described in this notice.
1/2
Page 16
Download HTML
11/6/2020
Message Center
Questions?
Review these Frequently Asked Questions for additional details regarding the Separate Account structure changes. If you still have questions, feel free to contact your Principalยฎ representative.
Please note that Principal Life or its affiliates will not provide you advice regarding whether to approve or disapprove the changes, or whether to remain invested in the Separate Account. Any information that we provide you about the changes to the Separate Account is not intended to be investment advice for purposes of ERISA or any other applicable law. You should consult your Plan's financial professional to aid you in making these determinations.
Before directing retirement funds to a separate account, investors should carefully consider the investment objectives, risks, charges and expenses of the separate account as well as their individual risk tolerance, time horizon and goals. For additional information contact us at 800-547-7754 or by visiting principal.com.
Investing involves risk, including possible loss of principal. Real Estate investment options are subject to investment and liquidity risk and other risks inherent in real estate such as those associated with general and local economic conditions. Property values can decline due to environmental and other reasons. In addition, fluctuation in interest rates can negatively impact the performance of real estate investment options.
Separate Accounts are available through a group annuity contract with Principal Life Insurance Co. Insurance products and plan administrative services provided through Principal Life Insurance Company, a member of the Principal Financial Group, Des Molnes, Iowa 50392. See the group annuity contract for the full name of the Separate Account. Certain investment options and contract riders may not be available in all states or U.S. commonwealths. Principal Life Insurance Company reserves the right to defer payments or transfers from Principal Life Separate Accounts as permitted by the group annuity contracts providing access to the Separate Accounts or as required by applicable law. Such deferment will be based on factors that may include situations such as: unstable or disorderly financial markets; investment conditions which do not allow for orderly investment transactions; or investment, liquidity, and other risks inherent in real estate (such as those associated with general and local economic conditions). If you elect to allocate funds to a Separate Account, you may not be able to immediately withdraw them.
HZ3662A | 1348461-092020 | 10/2020
ยฉ2020, Principal Financial Services, Inc.
Securities offered through Principal Securities, Inc., member SIPC
2/2
Page 17
Download HTML
What are the specifics of the new structure?
Three new entities will be created:
A new operating partnershipโThe Principal U.S. Property Portfolio ("Portfolio")
The Portfolio will own a one-hundred percent economic interest in multiple limited liability companies ("REIT LLCs") that intend to elect REIT status at a later date. In some cases, the REIT LLCs will create subsidiaries ("REIT Subs") in which the REIT LLCs will have a one-hundred percent economic interest.
Most Principal U.S. Property Separate Account ("Separate Account") properties will be transferred to the REIT LLCs or REIT Subs held by the Portfolio. Cash and other non-real estate assets and liabilities also will be transferred to the Portfolio.
In exchange, the Separate Account will receive a limited partnership interest in the Portfolio, initially valued at an amount equal to the value of all assets and liabilities transferred by the Separate Account to the Portfolio and REIT subsidiaries. Subsequent valuations will be made in accordance with the Portfolio valuation policy, which mirrors that of the Separate Account.
A new commingled fundโThe Principal U.S. Property Fund ("Fund")
In conjunction with the creation of the Portfolio, REIT LLCs and REIT Subs, the GP will also create the Fund.
The Fund will be structured as an open-end, commingled privately placed investment option offered to investors who are otherwise not qualified to invest in the Separate Account. The Fund will invest in the Portfolio and together with the Separate Account, will be a limited partner in the Portfolio.
The Fund and the Separate Account will hold interests in the Portfolio. The Fund's and Separate Account's ownership interests in the Portfolio will be proportionate to the value of the contributions by the Separate Account and the Fund to the Portfolio.
A new single member limited liability company, or LLC, that will act as the general partner, called the Principal U.S. Property GP, LLC ("GP")
Principal Real Estate Investors LLC ("PrinREI") will form the GP. The GP will not have an economic interest in the Fund or the Portfolio. The GP will be the General Partner of the Portfolio and the Fund.
๏ฝ
Page 18
Download HTML
1
As the general partner of the Portfolio and the Fund, the GP oversees the investment activity of the Portfolio and the Fund. The GP manages the Portfolio and the Fund for the benefit of investors.
Does the structure change impact the withdrawal limitation? No, there is no impact to the status of the withdrawal limitation.
How will these changes benefit unitholders of the Separate Account?
How will these changes benefit unitholders of the Separate Account by Principal Life believes the changes may be favorable to unitholders of the Separate Account by potentially providing the following benefits:
Greater diversification: A common investment principle is a group of assets has collectively lower risk than any individual asset. A larger investment portfolio can invest in more and different properties, which can lead to greater diversification, by property sector and geography.
Higher quality properties: A larger pool of assets could invest in higher quality properties without compromising diversification by property sector and geography.
Expanded transaction opportunity set: A larger pool of assets could participate in large portfolio transactions or large single asset transactions without compromising diversification.
Cycle opportunity: At different times in economic and real estate cycles, better relative value can exist in the purchase of large assets versus small assets.
Potential investment performance improvement: Over long time periods, larger properties have historically outperformed smaller properties and larger core real estate funds have historically outperformed smaller core real estate funds.ยน
Reduction in fixed costs: By creating a larger pool of assets, fixed costs paid to third parties, such as those for an audit or valuation services, will be spread over a larger number of investors.
Investor diversification: Plan sponsors currently eligible to invest in the Separate Account are tax-favored retirement plans. Different investor types may exhibit different characteristics, including liquidity timing and frequency.
1Property performance: based on data from the NCREIF Property Index through June 30, 2020. Large and small fund performance: based on June 30, 2020 data from NFI-ODCE data contributing funds.
What are the Retained Assets? How were they selected and how will they be monitored?
Initially, the Separate Account will transfer assets and liabilities, valued at no more than 95% of the Separate Account's holdings, to the Portfolio. Such assets will include most of the properties, cash and liabilities of the Separate Account. However, the Retained Assets in the Separate Account will consist of some of the properties it holds that have a value equaling approximately 7% of Separate Account holdings.
Principal Life retained an independent fiduciary that is a registered investment adviser with substantial expertise in real estate consulting and valuations to analyze the proposed Retained Assets portfolio. The independent fiduciary provided an opinion, a condensed version is available to you upon request on a non-reliance basis. To obtain a copy of the condensed opinion, please contact your Principal\circledR representative. The independent fiduciary concluded in their opinion that:
2
Page 19
Download HTML
The proposed creation of the Portfolio, transfer of approximately 95% of the assets currently held by the Separate Account to the Portfolio, and maintenance of the Retained Asset portfolio are consistent with the investment objectives of the Separate Account.
The properties selected by Principal Life Insurance Company for the Retained Assets portfolio and held directly by the Separate Account are of the same high quality as the assets that will be transferred to the Portfolio and can be reasonably expected to produce returns similar to that of the Portfolio.
The existing Separate Account investors will benefit by the enhanced structure, which will allow for broader investor participation, contributing to the potential for increased property diversification, increased scale, greater liquidity, and investor capital diversification.
On an ongoing basis, the Separate Account will generally maintain at least 5% of assets directly and outside of its interests in the Portfolio. Such assets will include the Retained Assets and, possibly, other assets the Separate Account purchases. Principal Life will test annually whether the Separate Account meets the 5% requirement based on the five-year rolling average value of the Retained Assets and any other assets directly held by the Separate Account for the prior five calendar years.
Will this structure impact unit value or the valuation of Separate Account properties?
No. The value of your Plan's units of the Separate Account will not change as a result of the transfer. On the date of the transfer, unitholders of the Separate Account will have the same economic ownership of assets as they did prior to the transfer as the Separate Account will continue to own all of the economic interest in the Portfolio and the Retained Assets. In addition, the Portfolio will follow the same valuation policy currently in place for the Separate Account.
When will this change occur?
The Separate Account changes will be effective Jan. 4, 2021 or upon receipt of all necessary regulatory approvals.
Is there a fee impact?
The amount of fees paid by unitholders of the Separate Account will not change. Further, unitholders of the Separate Account will not bear any initial or ongoing expenses or costs related to this structure change. Principal Life, its affiliates and Fund investors will be responsible for such expenses and costs.
What is the relationship between Principal Life, PrinREI, the Fund, and GP?
PrinREI is a sub-advisor of the Principal Life and a direct subsidiary of Principal Global Investors Holding Company (US), LLC. Principal Global Investors Holding Company (US), LLC and Principal Life are brother-sister subsidiaries of Principal Financial Services, Inc.
PrinREI is the sole member of the Principal U.S. Property GP, LLC. The GP will be the general partner of both the Fund and the Portfolio.
How will oversight of the new structure be managed?
The Separate Account will continue as an insurance company separate account maintained by Principal Life and managed by PrinREI. As it does today, Principal Life will continue to act as
.
3
Page 20
Download HTML
the Investment Manager, as defined in ERISA, for the purpose of managing funds in the Separate Account.
PrinREI will act as investment manager of the Fund and the Portfolio. Through its ownership of the GP, PrinREI will have indirect general partner fiduciary responsibility under state law to the Fund and the Portfolio. Because of PrinREI's ownership of the general partner of the Portfolio, and its role as the Portfolio's investment manager, it will be involved in the management of the REIT LLC's and REIT Subs.
If I want to invest more money, where will my new contributions be invested?
Additional contributions will be invested in the Separate Account. The Separate Account in turn will invest in the Portfolio or use the contributions to invest in properties.
Plan sponsors with the Separate Account active in their investment option lineup need to provide their affirmative approval or disapproval of the transaction. How do I approve or disapprove of the changes to the Separate Account?
Please call your Principalยฎ representative indicating your approval or disapproval no later than Dec. 15, 2020.
If you provide affirmative approval, your organization's plan will remain invested in the Separate Account, subject to the changes described in this notice.
If you disapprove of the transaction, you must request a redemption of your Plan's units as described in your Plan's group annuity contract with Principal Life prior to Dec. 15, 2020.
Your redemption request may be subject to a withdrawal limitation until such time as the withdrawal limitation is lifted.
o The Fund will not invest in the Portfolio until such time that any plans that do not approve the transaction have redeemed their units.
If you do not provide affirmative approval or disapproval prior to Dec. 15, 2020, you will remain invested in the Separate Account and will be deemed to have approved the Separate Account structure changes described in this notice.
Questions?
If you have any questions about the changes to the Separate Account, you should contact your Principalยฎ representative.
If you're a plan sponsor with the Separate Account active in your investment option lineup, your Principal representative, Principal Life, or its affiliates will not provide you advice regarding whether to approve or disapprove the changes, or whether to remain invested in the Separate Account. Any information that we provide you about the changes to the Separate Account is not intended to be investment advice for purposes of ERISA or any other applicable law. You should consult your Plan's advisers to aid you in making these determinations.
Before directing retirement funds to a separate account, investors should carefully consider the investment objectives, risks, charges and expenses of the separate account as well as their individual risk tolerance, time horizon and goals. For additional information contact us at 800-547-7754 or by visiting principal.com.
4
Page 21
Download HTML
๋ต
Investing involves risk, including possible loss of principal. Asset allocation and diversification do not ensure a profit or protect against a loss.
Real Estate investment options are subject to investment and liquidity risk and other risks inherent in real estate such as those associated with general and local economic conditions. Property values can decline due to environmental and other reasons. In addition, fluctuation in interest rates can negatively impact the performance of real estate investment options.
Principal Real Estate Investors, LLC is an external investment management group under Principal Global Investors Holding Company." Principal Global Investors leads global asset management and is a member of the Principal Financial Groupยฎ.
Separate Accounts are available through a group annuity contract with Principal Life Insurance Co. Insurance products and plan administrative services provided through Principal Life Insurance Company, a member of the Principal Financial Group, Des Moines, Iowa 50392. See the group annuity contract for the full name of the Separate Account. Certain investment options and contract riders may not be available in all states or U.S. commonwealths. Principal Life Insurance Company reserves the right to defer payments or transfers from Principal Life Separate Accounts as permitted by the group annuity contracts providing access to the Separate Accounts or as required by applicable law. Such deferment will be based on factors that may include situations such as: unstable or disorderly financial markets; investment conditions which do not allow for orderly investment transactions; or investment, liquidity, and other risks inherent in real estate (such as those associated with general and local economic conditions). If you elect to allocate funds to a Separate Account, you may not be able to immediately withdraw them.
PQ12903 | ยฉ 2020 Principal Financial Services, Inc. | 1348461-092020 | 10/2020
ใผใผใ
<div style="text-align: center;"><img src="imgs/img_in_chart_box_4_1_1523_79.jpg" alt="Image" width="99%" /></div>
5
Page 22
Download HTML
AGENDA ITEM NO. 7B
SARASOTA MANATEE AIRPORT AUTHORITY
NOVEMBER 17, 2020
STAFF NARRATIVE
APPROVAL: SCHEDULE OF CALENDAR YEAR 2021 SARASOTA MANATEE AIRPORT AUTHORITY BOARD MEETING DATES
EXECUTIVE SUMMARY: Staff is requesting approval of the meeting dates of the Authority for the calendar year 2021.
NARRATIVE: In accordance with SMAA By-Laws, the Board conducts regular meetings a minimum of six times per year. The six meetings include:
The month of January to approve the Audited Financials before January 31 of each year;
The month of May to conduct the evaluation workshop for the President, CEO;
The months of August and September to review and approve the airport's fiscal year budget; and
The month of November to conduct the annual organizational meeting and elect officers of the Board.
Additionally, the November meeting in each even-numbered year shall be held on the third Tuesday following the first Monday. The Board holds the President, CEO evaluation workshop on the morning of the May meeting and the Budget Workshop on the morning of the August meeting date.
Except for appointments by the Governor for seat vacancies, all members assume office on the third Tuesday of November in the year of appointment. Commissioners in seats up for reappointment or term limited, remain in their respective seats until the Governor makes the Appointments.
Staff has reviewed holidays and Airport related conference dates to identify any conflicts. The CY 2021 dates for review and approval by the Board are:
CY 2020 Regular Meetings Commence at 1:00 p.m.:
Monday, JANUARY 25
Monday, MARCH 22
Monday, MAY 24 w/Workshop meeting to evaluate the Pres. CEO at 11:00 am same day) Monday, AUGUST 23 (w/Budget Workshop starting at 11:00 am, or as determined by the Chair) Monday, SEPTEMBER 27
Monday, NOVEMBER 15
According to the by-laws, if necessary, the Board would schedule a second Budget Workshop for the first Wednesday after Labor Day: Wednesday, September 8.
Upon approval of the Calendar Year 2021 dates by the Board, the Executive Assistant shall notify the Clerks of the Board of Commissioners in both Sarasota and Manatee Counties of the meeting
1
Page 23
Download HTML
dates and shall publish a legal advertisement in the newspapers advising the public of all regularly scheduled meeting dates of the Authority for CY 2021. Additionally, we post the meeting dates in the terminal display and on the airport's website in accordance with Florida Statutes.
Article II, Section 1.H of the Authority By-laws states, "Nothing herein shall preclude the Board from holding a regular Board or committee meeting on dates or at times or places other than those specified herein...
Staff requests that the Board review and approve the list of meeting dates to set the Airport Authority's regular meetings calendar for the year 2021 and to publish proper notice in the newspapers and forward calendar to the county clerks.
RECOMMENDED MOTION: The Authority approves the schedule of Authority meeting dates for Regular Meetings and scheduled Workshops for the year 2021 as presented and authorizes staff to prepare all documents to implement this action.
2
Page 24
Download HTML
AGENDA ITEM NO. 7C
SARASOTA MANATEE AIRPORT AUTHORITY
NOVEMBER 17, 2020 REGULAR MEETING
STAFF NARRATIVE
REQUEST FOR APPROVAL:
PROPOSED SCHEDULE OF CALENDAR YEAR 2021 EMPLOYEE HOLIDAYS
EXECUTIVE SUMMARY: The proposed CY 2021 holiday schedule is consistent with the schedule of paid holidays approved by the Airport Authority for CY 2020. For your reference, attached are the results of a recent survey completed by Human Resources staff, which provides a comparison of the SMAA holiday schedule with that of the public sector and airports.
NARRATIVE: The proposed holiday schedule for the Calendar Year (CY) 2021 is as follows:
| HOLIDAY | DAY OBSERVED | |
|---|---|---|
| New Year's Day 2021 | January 1 | (F) |
| Martin Luther King, Jr. Day | January 18 | (M) |
| Memorial Day | May 31 | (M) |
| Independence Day | July 5 | (M) |
| Labor Day | September 6 | (M) |
| Veteran's Day | November 11 | (TH) |
| Thanksgiving Day | November 25 | (TH) |
| Day after Thanksgiving | November 26 | (F) |
| Christmas Eve* | December 24 | (F) |
| Christmas Day* | December 27 | (M) |
| Two Floating Holidays | Not Designated | |
*In accordance with the SMAA Employee Handbook, Approved Holidays, "Any scheduled holiday that falls on a Saturday will be observed on the previous Friday. Any holiday that falls on a Sunday will be observed on the following Monday." However, since Christmas Eve is already being celebrated on Friday, Christmas Day will be observed on Monday.
Note: For scheduled shift workers, the paid scheduled holiday time shall be defined as the day nationally observed as the actual holiday.
The President, Chief Executive Officer requests approval of the CY 2021 employee holiday schedule as proposed.
RECOMMENDED MOTION: It is hereby recommended that the Airport Authority approves the proposed CY 2021 holiday schedule as presented.
ATTACHMENTS: Holiday Surveys.
1
Page 25
Download HTML
*Note: For shift workers, the paid holiday time shall be defined as the day nationally observed.
| Holidays | Observed | City of Sarasota | City of Bradenton | City Of Tampa | Sarasota County | Manatee County | SMAA |
|---|---|---|---|---|---|---|---|
| New Year's Day | (F) 01-01-21 | X | X | X | X | X | X |
| Martin Luther King Day | (M) 01-18-21 | X | X | X | X | X | X |
| Presidents Day | (M) 02-15-21 | X | X | X | X | ||
| Good Friday | (F) 04-02-21 | X | |||||
| Memorial Day | (M) 05-31-21 | X | X | X | X | X | X |
| Independence Day* | (M) 07-05-21 | X | X | X | X | X | X |
| Labor Day | (M) 09-06-21 | X | X | X | X | X | X |
| Columbus Day | (M) 10-11-21 | ||||||
| Veterans Day | (TH)11-11-21 | X | X | X | X | X | X |
| Thanksgiving Day | (TH)11-25-21 | X | X | X | X | X | X |
| Thanksgiving Friday | (F) 11-26-21 | X | X | X | X | X | X |
| Christmas Eve | (F) 12-24-21 | X | X | X | X | X | X |
| Christmas Day* | (M) 12-27-21 | X | X | X | X | X | X |
| Floating or Personal Days | 0 | 1 | 1 | 3 | 3 | 2 | |
| Total Days Per Year | 11 | 12 | 12 | 14 | 14 | 12 | |
HOLIDAY SCHEDULE SURVEY FOR CY 2021
PUBLIC SECTOR
Page 26
Download HTML
*Note: Christmas Eve and Christmas Day observed on December 23-24, 2021
| Holidays | Observed | Tampa | Ft. Myers | West Palm Beach | St. Petersburg | SRQ |
|---|---|---|---|---|---|---|
| New Year's Eve Day | (TH) 12-31-20 | X | ||||
| New Year's Day | (F) 01-01-21 | X | X | X | X | X |
| Martin Luther King Day | (M) 01-18-21 | X | X | X | X | X |
| Presidents Day | (M) 02-15-21 | X | ||||
| Good Friday | (F) 04-02-21 | |||||
| Memorial Day | (M) 05-31-21 | X | X | X | X | X |
| Independence Day | (M) 07-05-21 | X | X | X | X | X |
| Labor Day | (M) 09-06-21 | X | X | X | X | X |
| Columbus Day | (M) 10-11-21 | X | ||||
| Veterans Day | (TH)11-11-21 | X | X | X | X | X |
| Thanksgiving Day | (TH)11-25-21 | X | X | X | X | X |
| Thanksgiving Friday | (F) 11-26-21 | X | X | X | X | X |
| Christmas Eve | (F) 12-24-21 | X* | X | X | ||
| Christmas Day | (M) 12-27-21 | X | X* | X | X | X |
| Floating or Personal Days | 0 | 0 | 0 | 2 | 2 | |
| Total Days Per Year | 9 | 11 | 12 | 11 | 12 | |
HOLIDAY SCHEDULE SURVEY FOR CY 2021 AIRPORTS
Page 27
Download HTML
AGENDA ITEM NO. 7D
SARASOTA MANATEE AIRPORT AUTHORITY
NOVEMBER 17, 2020 MEETING
STAFF NARRATIVE
REQUEST FOR APPROVAL:
AMENDMENT NO. 4 TO THE SCHEDULED AIRLINE OPERATING AGREEMENT
AND TERMINAL BUILDING LEASE
EXECUTIVE SUMMARY: Airport management has met and discussed an amendment to the signatory airline agreement, which will provide the two positive provisions for the Airport Authority. The amendment will extend the agreement with the four existing signatory carriers an additional year to September 30, 2024 and exclude all CARES Act funds or any subsequent, federal, state, or local funds from the year-end reconciliation. In return the Airport Authority will waive the previously deferred six-month fixed rents, waive an additional 12 months of fixed rents, and waive any shortfalls in year-end reconciliation calculations until September 30, 2023. The normal reconciliation process returns in the final year of the agreement.
NARRATIVE: Management briefly discussed a possible amendment to the present Signatory Airline Agreement when the FY 2021 budget with the airlines in August given the tremendous impacts Covid-19 has had on airline business. Subsequently, the President, CEO began more intense discussions with the signatory airlines to see if a mutually beneficial amendment to the existing agreement could be worked out to assist both parties during this crisis.
All airlines agreed that the present Agreement was working well and were generally pleased with the performance of the Agreement. The negotiation continued over the last sixty days and the following provisions were agreed to subject to Airline Executive Management and SMAA Board approval.
The provision helpful to the Airport Authority is an additional year extension of the present agreement that will take the agreement out to September 30, 2024, affording ample time for the full impacts of the Covid-19 pandemic to hopefully dissipate. In addition, all CARES Act funds, or any subsequent federal, state, or local relief funds are exempted from the year-end reconciliation process. This allows the Airport Authority to utilize the entire $23.3 million of CARES Act funds or any additional relief funds strictly for airport operating or capital purposes without having to add those funds into the revenue totals for reconciliation. If that provision were not included, that could result in airlines receiving airport CARES Act funds, which is not its purpose.
The Board previously approved the waiver of signatory airlines fixed rents only (Exclusive Use and Preferential Use Space) for a period of six months covering April 2020 through September 2020, which would become due in April 2021. The signatory airlines still paid and continue to pay all variable rentals and fees (Joint Use and Common Use Space). The amendment waives the deferred fixed rents and provides for an additional 12 months waiver for fixed rents. The amendment also waives the collection of any shortfall because of the year-end reconciliation process. Given the CARES Act funds are not included in the calculation under this amendment it would be unfair to send the airlines additional invoices when the airport is exempting any relief funds from the calculation. Should the airport generate an operating surplus without the benefit of using relief funds, the signatory airlines would receive the appropriate refund of excess fees paid as normally occurs pre-pandemic.
The President, Chief Executive Officer recommends approval.
RECOMMENDATION: Staff recommends approval of Amendment No. 4 to the Scheduled Airline Operating Agreement and Terminal Building Lease and that Staff be authorized to prepare any documents to implement this action.
ATTACHMENTS: Amendment No. 4
Page 28
Download HTML
SARASOTA MANATEE AIRPORT AUTHORITY
AMENDMENT NO. 4 TO SCHEDULED AIRLINE
OPERATING AGREEMENT AND TERMINAL BUILDING LEASE
THIS Fourth AMENDMENT is entered into as of the ___ day of ___, 2020, by and between the
Sarasota Manatee Airport Authority, a public and governmental body, existing under and by virtue of
the laws of the State of Florida (hereinafter referred to as the "Authority"), and JetBlue Airways,
Corporation, a corporation organized and existing under the laws of the State of Delaware, and
authorized to do business in the State of Florida (hereinafter referred to as "Airline").
WITNESSETH
WHEREAS, Authority and Airline entered into the SARASOTA MANATEE AIRPORT AUTHORITY SCHEDULED AIRLINE OPERATING AGREEMENT AND TERMINAL BUILDING LEASE, (the "Agreement"), the term of which commenced October 1, 2014; and
WHEREAS, Authority and Airline entered into Amendment Number 1 and extended the Agreement to September 30, 2023; and
WHEREAS, Authority and Airline entered into Amendment Number 2 and deferred rents for April, May and June 2020, and Amendment Number 3 which further deferred fixed rents for July, August and September 2020; and
WHEREAS, Authority and Airline desire to further amend said Agreement as set forth herein.
NOW, THEREFORE, for and in consideration of the agreements set forth herein, and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, Authority and Airline, intending to be legally bound, agree as follows:
1. Article 4 TERM
Section 4.01 of the Agreement is deleted in its entirety and replaced with the following:
Section 4.01 Term
The term of this Agreement shall commence October 1, 2014 and terminate September 30, 2024, subject to the termination provisions of Article 13.
II. Article 5. RENTALS AND FEES
The following is added to Article 5 Rentals and Fees:
Section 5.12 Waiver of Certain Rentals and Fees
The Authority hereby waives and shall not require payment from Airline of Rentals and Fees (as described in Section 5.01 of the Agreement) that pertain to Exclusive Use Space, Preferential Use Space, and Preferential Apron Area (as each is described in Section 3.01 of the Agreement) for (1) the twelve months ending September 30, 2021 and (2) those previously deferred rents for April 2020 through September 2020. However, Airline shall continue to pay Rentals and Fees (as described in Section 5.01 of the Agreement) pertaining to Joint Use Space
-1
Page 29
Download HTML
and Common Use Space (as each is described in Section 3.01 of the Agreement) as well as any Non-Preferential Gate Use Fees and Landing Fees as described in Sections 5.04 and 5.05 of the Agreement, respectively, including any taxes in accordance with Section 9.04 of the Agreement.
III. Article 6 RECALCULATION OF RENTALS AND FEES
Section 6.09 is deleted in its entirety and replaced with the following:
Section 6.09. Year-End Adjustment to Actual and Settlement
On or about April 1 of each Fiscal year, Authority shall furnish Airline with an accounting of the costs and expenses actually incurred, revenues and other credits actually realized, (reconciled to the audited financial statements of the Airport System) and actual enplaned passengers and landed weights during the preceding Fiscal Year with respect to each of the components of the calculation of the average Terminal Building Rental Rate, the Preferential Apron Area Fee Rate, and the Landing Fee Rate in this Article 6 and shall recalculate the rates, fees, and charges required for the Fiscal Year based on those actual costs and revenues, including the proration of rentals for Common Use and Joint Use Space in accordance with the defined formulas. For the purposes of this Section, any revenues received by the Sarasota Manatee Airport Authority through the Coronavirus Aid, Relief, and Economic Security Act" or the "CARES Act" or any additional relief funds provided by Federal, State or Local Government bodies shall not be utilized in this recalculation.
If requested by any Signatory Airline, Authority shall convene a meeting of the Signatory Airlines to discuss the calculation of the year-end settlement.
In the event that Airline's rentals, fees, and charges billed during the Fiscal Year were more than the amount of Airline's rentals, fees, and charges required (as recalculated based on actual costs and revenues), such excess amount shall be paid to Airline in lump sum within sixty (60) days of the calculation of such final settlement.
In the event that Airline's rentals, fees, and charges billed during the Fiscal Year were less than the amount of Airline's rentals, fees, and charges required (as recalculated based on actual costs and revenues), such deficiency shall be not be billed to or collected from Airline for the period October 1, 2019 through September 30, 2023. For the period beyond September 30, 2023, such deficiency shall be billed to Airline and payable by Airline within 60 days of the date of invoice.
Binding Nature. This Fourth Amendment shall be deemed a part of the Agreement. The provisions of this Fourth Amendment shall be binding upon, and inure to the benefit of, the respective successors and assigns (including without limitation, any receiver, debtor in possession or trustee in bankruptcy) of Airline and Authority.
Conflict or Inconsistency. In the event of any conflict or inconsistency between the terms and provisions contained in the Agreement (as previously amended) and the terms and provisions contained in this Amendment, the terms and provisions of this Fourth Amendment shall govern
2
Page 30
Download HTML
and prevail to the extent necessary to resolve such conflict or inconsistency. All other terms and provisions as set forth in the Agreement shall remain in full force and effect.
Counterparts. This Fourth Amendment may be executed simultaneously in two or more counterparts, each of which shall be deemed an original and all of which together shall constitute but one and the same instrument.
Miscellaneous. This Fourth Amendment shall be deemed to have been negotiated and made in and shall be governed and interpreted under the laws of the State of Florida. This Fourth Amendment shall be subject to the dispute resolution, remedies and jurisdictional provisions of the Agreement.
IN WITNESS WHEREOF, the parties have executed this Third Amendment as of the day and year first above written.
Witness
Erick Capps
Erick Capps (Nov 3, 2020 15:48 EST)
Witness
Erick Capps
Manager, Properties
JETBLUE AIRWAYS CORPORATION
JETBLUE AIRWAYS CORPORATION
-3
Page 31
Download HTML
SRQ 4th Amendment
Final Audit Report
2020-11-03
| Created: | 2020-11-03 |
|---|---|
| By: | Robert Kriedberg (Robert.Kriedberg@jetblue.com) |
| Status: | Signed |
| Transaction ID: | CBJCHBCAABAAqxTXstvl3WGDlIm3aliqceYu_oM4aKXA |
"SRQ 4th Amendment" History
Document created by Robert Kriedberg (Robert.Kriedberg@jetblue.com)
2020-11-03 - 8:00:19 PM GMT- IP address: 163.116.138.120
Document emailed to Lisa Reifer (Lisa.Reifer@jetblue.com) for signature 2020-11-03 - 8:06:11 PM GMT
Email viewed by Lisa Reifer (Lisa.Reifer@jetblue.com)
2020-11-03 - 8:32:40 PM GMT- IP address: 163.116.135.117
Document e-signed by Lisa Reifer (Lisa.Reifer@jetblue.com)
Signature Date: 2020-11-03 - 8:32:57 PM GMT - Time Source: server- IP address: 163.116.135.117
Document emailed to Erick Capps (Erick.Capps@jetblue.com) for signature
2020-11-03 - 8:32:59 PM GMT
Document e-signed by Erick Capps (Erick.Capps@jetblue.com)
Signature Date: 2020-11-03 - 8:48:11 PM GMT - Time Source: server- IP address: 163.116.135.119
Agreement completed.
2020-11-03 - 8:48:11 PM GMT
jetBlue
Page 32
Download HTML
AGENDA ITEM NO. 7E
SARASOTA MANATEE AIRPORT AUTHORITY
NOVEMBER 17 2020 REGULAR MEETING
STAFF NARRATIVE
APPROVAL: SMAA RESOLUTION 2020-08, RATIFYING THE APPOINTMENT OF MEMBERSHIP TO FIRE PREVENTION CODE BOARD OF APPEALS BY MANATEE COUNTY FIRE CHIEFS' ASSOCIATION;
PROVIDING FOR AN EFFECTIVE DATE
EXECUTIVE SUMMARY: In the 2015 legislative session (Chapter 2015-185), the Sarasota Manatee Airport Authority (SMAA) acquired Fire Marshal Powers in the Manatee portion of the air operations area (AOA). In August 2016, the SMAA Board adopted Resolution 2016-01, providing for the implementation and enforcement of Florida Fire Prevention Code within the Airport Enclave in Manatee County. The Manatee County Fire Chiefs' Association is now requesting the Airport, as a participating district, to ratify the appointment of seven members to the Fire Prevention Code of Appeals.
NARRATIVE: The SMAA's Airport Rescue and Fire Fighting (ARFF) department employs Florida State Certified Firefighters/Emergency Medical Technicians (EMTs) to provide aircraft fire protection, and airport medical services 24 hours per day within the Air Operations Area ("AOA") to meet its obligations as a "Class 1, Index C, certificate holder" under Federal Aviation Regulation (FAR) Part 139. Jurisdictional boundaries of neighboring Manatee fire districts did not embrace the AOA for traditional fire marshal powers, therefore, Chapter 2015-185, Laws of Florida, granted the Airport the fire marshal powers within the AOA "enclave area" in Manatee County, providing for the performance of the necessary function.
In January 2016, the Manatee County Fire Chiefs' Association established Rules of the Fire Prevention Code Board of Appeals (attached), setting forth specific duties and responsibilities for the Fire District. In August 2016, the SMAA adopted Resolution 2016-01, providing for the implementation and enforcement of Florida Fire Prevention Code within the Airport Enclave in Manatee County.
On October 29, 2020, the Manatee County Fire Chiefs' Association re-appointed seven members to the Fire Prevention Code of Appeals. As a participating district, the Association is requesting ratification by the SMAA of the re-appointment of seven members to the Fire Prevention Code of Appeals as listed in Resolution 2020-08 (attached).
RECOMMENDATION: It is hereby recommended that the Sarasota Manatee Airport Authority adopt Resolution 2020-08, Ratifying the Re-Appointment of Membership of Fire Prevention Code Board of Appeals by Manatee County Fire Chiefs' Association, providing for an effective date.
Attachments: SMAA Resolution 2020-08, Appeals Board Rules Rules of the Fire Prevention Code Board of Appeals
1
Page 33
Download HTML
RESOLUTION 2020-08 SARASOTA MANATEE AIRPORT AUTHORITY
SARASOTA BRADENTON INTERNATIONAL AIRPORT
A RESOLUTION OF THE SARASOTA MANATEE AIRPORT AUTHORITY; RATIFYING THE APPOINTMENT OF MEMBERSHIP OF THE FIRE PREVENTION CODE BOARD OF APPEALS BY THE MANATEE COUNTY FIRE CHIEFS' ASSOCIATION; PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Sarasota Manatee Airport Authority is a body politic and corporate that is empowered pursuant to Ch. 2003-309, Laws of Florida, as amended, to acquire and operate any airport facilities within either or both of the Counties of Sarasota and Manatee, and, as such is the owner and operator of the Sarasota Bradenton International Airport (the "Airport"); and
WHEREAS, Sec. 5.(22) of Ch. 2003-309, as amended by Ch. 2015-185, Laws of Florida, authorizes and empowers the Authority to enforce the Florida Fire Prevention Code within the Enclave of the Airport; and
WHEREAS, on August 22, 2016, the Sarasota Manatee Airport Authority adopted Resolution 2016-01, providing for the Implementation and enforcement of Florida Fire Prevention Code within Airport Enclave in Manatee County; and
WHEREAS, on January 28, 2016, at a meeting of the Manatee County Fire Chiefs' Association a Fire Prevention Code Board of Appeals was established for the purpose of resolving matters, which are unable to be resolved at the Fire District-level, related to that particular Fire District's Fire Code; and
WHEREAS, at the January 28, 2016 meeting, the Manatee County Fire Chiefs' Association also approved Rules of the Fire Prevention Code Board of Appeals, a copy of which is attached hereto as Exhibit 1; and
WHEREAS, the Rules of the Fire Prevention Code Board of Appeals set forth specific duties and responsibilities for the Fire District which include the ratification of the appointment of the members for the Fire Prevention Code Board of Appeals by the Manatee County Fire Chiefs' Association; and
WHEREAS, the Manatee County Fire Chiefs' Association appointed seven members of the Fire Prevention Code of Appeals at a publicly advertised meeting on March 30, 2017; and
NOW, THEREFORE, BE IT RESOLVED by the Sarasota Manatee Airport Authority that:
The above stated recitals are true and correct and are hereby fully incorporated herein.
The appointment of the following members of the Fire Prevention Code Board of Appeals by the Manatee County Fire Chiefs' Association is hereby ratified by the Sarasota Manatee Airport Authority:
Raj Mathur, Certified General Contractor
Alan Breitwieser, Certified Fire Protection Contractor
Garry Roberts, Professional Architect
Page 34
Download HTML
Philip Feikema, Fire Department Operations or Fire Code Enforcement
Chester Scott, Building Code Enforcement
Laland Taylor, Attorney
Norm Luppino, Member of the General Public
3. This Resolution shall take effect immediately upon its adoption.
DULY ADOPTED at a public meeting this the 17th day of November 2020.
SARASOTA MANATEE AIRPORT AUTHORITY
<div style="text-align: center;"><img src="imgs/img_in_image_box_47_1_61_288.jpg" alt="Image" width="22%" /></div>
BY:
Chairman
ATTEST:
___
u sim t sim x sim 3
Secretary
Page 35
Download HTML
RULES OF THE FIRE PREVENTION CODE BOARD OF APPEALS
1.1 Definitions.
โAssociationโ shall mean the Manatee County Fire Chief's Association.
โBoard of Appealsโ shall mean the Fire Prevention Code Board of Appeals.
โCodeโ shall mean the โFire Prevention Codeโ adopted by a particular District in accordance with Sections 633.202 and 633.208, Florida Statutes, as may be amended, the โFlorida Fire Prevention Codeโ adopted by the State Fire Marshal pursuant to Chapter 69A-60, Florida Administrative Code, as may be amended, including the Florida editions of NFPA 1 Fire Code and NFPA 101 Life Safety Code.
โDistrictโ shall mean the Sarasota Manatee Airport Authority or any one of the dependent or independent special fire districts located in Manatee County, Florida, who has adopted these Rules of the Fire Prevention Code Board of Appeals.
โRulesโ shall mean these Rules of the Fire Prevention Code Board of Appeals.
1.2 Applicability.
The provisions of these Rules shall be in full force and effect in Manatee County within the jurisdiction of any District who has formally adopted these Rules by resolution of that District's Board of Commissioners.
1.3 Establishment of Fire Prevention Code Board of Appeals. A Fire Prevention Code Board of Appeals, hereinafter referred to as the "Board of Appeals," shall be established to rule on matters relating to the Code.
1.3.1 General. Whenever it is claimed that the provisions of the Code do not apply or have been misapplied by the District, or when it is claimed that the true intent and meaning of the Code or any of the regulations thereunder
1
Page 36
Download HTML
RULES OF THE FIRE PREVENTION CODE BOARD OF APPEALS
have been misconstrued or misapplied by the District, or when it is claimed that a decision of the District is unreasonable or arbitrary, the affected owner or owner's duly authorized agent may appeal the decision of the District to the Board of Appeals.
1.3.2 Membership.
1.3.2.1 Subject to the Association receiving appropriate authorization from each District, the Association shall appoint the members of the Board of Appeals. Final appointment of the members of the Board of Appeals is subject to ratification by each District.
1.3.2.2 The Board of Appeals shall consist of seven (7) principal members who are qualified by their training, education, knowledge, and experience to vary the application of the provisions of the Code and act on related matters, and to perform such other duties as established herein.
1.3.2.3 Each principal member shall be permitted to have an alternate with similar experience to serve in his or her stead when necessary. Alternate members shall also be appointed by the Association and are subject to the ratification by each District.
1.3.2.4 All principal and alternate members of the Board of Appeals must reside within Manatee County at the time of appointment and while serving on the Board of Appeals and shall be qualified electors of Manatee County. Principal and alternate members of the Board of Appeals shall not be employees, agents, or officers of any District.
1.3.2.5 Members of the Board of Appeals shall be governed by the applicable provisions of the State of Florida's Ethics Code and the Manatee County Code of Ethics.
1.3.2.6 Composition of Board. The composition of the Board of Appeals shall be as follows:
One (1) certified general contractor.
One (1) certified fire protection contractor.
One (1) registered professional engineer or architect.
2
Page 37
Download HTML
RULES OF THE FIRE PREVENTION CODE BOARD OF APPEALS
One (1) individual experienced in the field of fire department operations or fire code enforcement.
One (1) individual experienced in the field of building code enforcement.
One (1) licensed attorney.
One (1) member of the general public.
Where a member is required to be โregistered,โ โlicensed,โ or โcertified,โ said registration, license, or certification shall be issued by the State of Florida unless otherwise specified.
1.3.2.7 Term. Principal and alternate members of the Board of Appeals shall be appointed to an initial three (3)-year term. Successive terms for members of the Board of Appeals will be at the discretion of the Association. The members of the Board of Appeals shall serve no more than three (3) consecutive three (3)-year terms. Any vacancy occurring during a term shall be filled for the unexpired portion of the term and shall not count towards the member's term limits. The member's terms shall begin on October 1 and end on September 30.
1.3.2.8 Removal/Absences. Members of the Board of Appeals shall be removed from office by the Association for failure to attend three (3) successive meetings or when a member's absences exceed twenty-five (25) percent of all scheduled meetings in a calendar year if the absence is not approved by the Board of Appeals for cause. Any member who fails to attend a meeting during at least seventy-five (75) percent of the time the meeting is in session shall be considered not to have attended the meeting.
1.3.3 Administrative Duties. The Association shall be responsible for overseeing the general administrative duties and responsibilities pertaining to the Board of Appeals and all related costs. Any appeal fee received by the Association, as provided for under Section 1.4.7, shall be used to offset costs associated with the administrative duties and responsibilities of the Board of Appeals. Administrative duties and responsibilities pertaining to a particular case shall be the responsibility of the District involved. In addition, administrative costs associated with individual cases shall be borne by the District involved in the subject case.
3
Page 38
Download HTML
RULES OF THE FIRE PREVENTION CODE BOARD OF APPEALS
1.3.4 Rules and Procedures of the Board of Appeals. The Board of Appeals shall have the authority to establish rules and regulations for conducting its business.
1.3.4.1 Vote. Each member of the Board of Appeals shall have one (1) full vote.
1.3.4.2 Quorum. A quorum for the Board of Appeals shall be not less than five (5) members of the Board of Appeals.
1.3.4.3 Officers. The Board of Appeals shall select one of its members to serve as Chair and one member to serve as Vice-Chair.
1.3.4.4 Meetings. The Board of Appeals shall meet at least once on an annual basis to conduct its Annual Meeting. Additional meetings of the Board of Appeals shall be scheduled, at the Annual Meeting, to be held quarterly, or may otherwise be held at the call of the Chair, at such other times as the Board of Appeals determines, or when otherwise necessitated due to the filing of an appeal where a special meeting has been requested by one of the parties. Other than the Annual Meeting, any meeting of the Board of Appeals may be cancelled by the Chair when there are no pending appeals to be heard by the Board of Appeals.
1.3.4.4.1 Public Notice of all Board of Appeals meetings shall be reasonably provided. All Board of Appeals meetings shall be open to the public and shall comply with the applicable requirements of the Florida โGovernment in the Sunshineโ and โPublic Recordsโ laws. Minutes shall be taken at each meeting of the Board of Appeals. The Board of Appeals shall keep records of its examinations and other official actions. Minutes and records of the Board of Appeals shall be public records. Records associated with individual cases shall be maintained by the District involved with the subject case.
1.3.4.4.2 All Board of Appeals meetings shall be governed by Robert's Rules of Order.
1.4 Appellate Authority of the Fire Prevention Code Board of Appeals.
4
Page 39
Download HTML
RULES OF THE FIRE PREVENTION CODE BOARD OF APPEALS
1.4.1 The Board of Appeals shall provide for the reasonable interpretation of the provisions of the Code and issue rulings on appeals of the decisions of the District.
1.4.2 The rulings of the Board of Appeals shall be consistent with the letter of the Code or, when involving issues of clarity, ensuring that the intent of the Code is met with due consideration for public safety and fire fighter safety.
1.4.3 The Board of Appeals shall have the authority to grant alternatives or modifications through procedures outlined in Section 1.4.12.
1.4.4 The Board of Appeals shall not have the authority to waive the requirements of the Code.
1.4.5 The Board of Appeals decisions shall not be precedent setting.
1.4.6 Procedures on Appeal.
1.4.6.1 Any person or entity with standing shall be permitted to appeal a decision of the District when it is claimed that any one or more of the following conditions exist:
The true intent of the Code has been incorrectly interpreted.
The provisions of the Code do not fully apply.
A decision of the District is unreasonable or arbitrary as it applies to alternatives or new materials.
1.4.6.2 An appeal shall be submitted to the District having jurisdiction in writing within thirty (30) calendar days of notification of a decision by the District. The appeal shall outline all of the following:
The Code provisions from which relief is sought.
A statement indicating which provisions of Section 1.4.6.1 apply.
Justification as to the applicability of the provisions cited in Section 1.4.6.1.
A requested remedy.
5
Page 40
Download HTML
RULES OF THE FIRE PREVENTION CODE BOARD OF APPEALS
(5) Justification for the requested remedy stating specifically how the Code is complied with, public safety is secured, and fire fighter safety is secured.
1.4.6.3 Documentation supporting an appeal shall be submitted by the appellant to the District at least ten (10) calendar days prior to the Board of Appeals hearing.
1.4.7 Hearing. Upon receipt of the appeal and supporting documentation by the District, a hearing shall be held at the next regularly scheduled meeting of the Board of Appeals, with notice to the appellant, the District, and the members of the Board of Appeals, allowing for at least five (5) working days prior to said hearing. The Board of Appeals may also call special meetings provided that five (5) working days notice is given to both parties. If the applicant requires a special meeting to be called, the appeal fee shall be two thousand five hundred dollars ($2,500.00). Both the appellant and the District, and/or their representatives, shall attend the hearing and may present evidence at the hearing. The Board of Appeals shall consider each appeal on its own merits and shall base its decision only on the evidence presented at said hearing.
1.4.7.1 Conflict. No member of the Board of Appeals shall sit in judgment on any case in which the member holds a direct or indirect property or financial interest in the case.
1.4.7.2 Board Decisions. The Board of Appeals, upon an affirmative vote of a majority of the votes present, shall (1) affirm the decision of the District; (2) modify the decision of the District; or (3) reverse the decision of the District and affirm the appellant's position. The Board of Appeals' decision, with the reasons therefore and justification linked to specific sections of the Code, shall be transcribed in writing and a copy shall be mailed, by certified mail, to the appellant and the District, within fourteen (14) days after the hearing.
1.4.7.2.1 The Board of Appeals shall provide for reasonable interpretation of the provisions of the Code and rule on appeals from decisions of the District.
1.4.7.2.2 The Board of Appeals shall, in every case, reach a decision without unreasonable or unnecessary delay. If a decision of the Board of Appeals
6
Page 41
Download HTML
RULES OF THE FIRE PREVENTION CODE BOARD OF APPEALS
reverses or modifies a refusal, order, or disallowance of the District, the District shall immediately take action in accordance with such decision.
1.4.7.2.3 Every decision of the Board of Appeals shall be entered in the minutes of the Board of Appeals meeting.
1.4.7.2.4 Every decision of the Board of Appeals shall be promptly filed with the District and shall be open for public inspection.
1.4.7.2.5 All decisions of the Board of Appeals shall be final, subject to judicial review as provided by law.
1.4.7.2.6 Fire Marshal Order Stayed, Exception. Pending the disposition of an appeal scheduled for hearing, the order or decision of the District sought to be appealed shall be stayed unless the District certifies under oath, based upon available data and information, that an extreme danger to life or property exists, warranting immediate compliance under the Code. Said certification must be included in the order and be filed with the Board of Appeals within ten (10) days after the notice of appeal is filed.
1.4.8 Conflict Resolution.
1.4.8.1 Any conflict between the Florida Building Code and the Florida Fire Prevention Code and Life Safety Code as applied to a specific project shall be resolved in accordance with Section 553.73(11), Florida Statutes.
1.4.8.2 The Board of Appeals is hereby designated and authorized to perform the local administrative board functions set forth in Section 553.73(11), Florida Statutes. In accordance with Section 553.73(11), Florida Statutes, the duties and functions of the Board of Appeals shall include the following:
To hear and render decisions in appeals of conflict decisions made jointly by the District and the local building official, in accordance with Section 553.73(11), Florida Statutes.
To resolve conflicts between the building code and the Code, in accordance with Section 553.73(11), Florida Statutes, in those instances where the District having jurisdiction and the local building official are unable to agree on a resolution of said conflict.
7
Page 42
Download HTML
RULES OF THE FIRE PREVENTION CODE BOARD OF APPEALS
1.4.9 Additional Powers and Functions. The Board of Appeals is hereby authorized and empowered to hear and rule upon appeals from orders of the District in challenges brought pursuant to Section 633.208(3)(d), Florida Statutes, to amendments to the District's Code, and appeals from decisions of the District relating to false alarms.
1.4.10 Any decision of the Board shall be final and reviewable in the manner and within the time provided by the Florida Rules of Appellate Procedure only by a petition for writ of certiorari filed with the Circuit Court in Manatee County.
1.4.11 Permits and Approvals.
1.4.11.1 Any permit or approval authorized to be issued by the District pursuant to the Code shall be subject to immediate suspension, revocation, or denial by the District upon the District's determination that conditions exist which make the permitted activity imminently dangerous to life or property. The District's order immediately suspending or revoking a permit shall cite with particularity the facts supporting the suspension or revocation. The suspension or revocation shall be effective immediately upon notice to the permittee at the location indicated on the permittee's application. Upon such immediate suspension or revocation of a permit, the permittee shall be entitled to appeal the decision of the District at a subsequent hearing of the Board of Appeals. Upon the Board of Appeal's receipt of a written notice requesting a special meeting for a hearing with respect to an immediate permit suspension or revocation, the Board of Appeals shall set such a hearing for a date no later than five (5) working days from the Board of Appeal's receipt of the written notice unless the parties stipulate to a later date. The Board of Appeal's written decision shall be mailed by certified mail to the permittee within two (2) working days after the hearing. In all other respects, the procedures of Section 1.4.6 and 1.4.7 shall apply.
1.4.12 Equivalencies, Alternatives, and Modifications.
1.4.12.1 Equivalencies. In recognition that it is not the intent of the Code to prevent the use of systems, methods, or devices of equivalent or superior quality, strength, fire resistance, effectiveness, durability, and safety to those
8
Page 43
Download HTML
RULES OF THE FIRE PREVENTION CODE BOARD OF APPEALS
prescribed by the Code, provided technical documentation is submitted to the District to demonstrate equivalency and the system, method, or device is approved for the intended purpose.
1.4.12.2 Alternatives. The specific requirements of the Code shall be permitted to be altered by the District to allow alternative methods that will secure equivalent fire safety, but in no case shall the alternative afford less fire safety than, in the judgment of the District, that which would be provided by compliance with the provisions contained in the Code.
1.4.12.3 Modifications. The District is authorized to modify any of the provisions of the Code upon application in writing by the owner, a lessee, or a duly authorized representative where there are practical difficulties in the way of carrying out the provisions of the Code, provided that the intent of the Code shall be complied with, public safety secured, and substantial justice done.
1.4.12.4 Buildings with equivalency, alternatives, or modifications approved by the District shall be considered as conforming with the Code.
1.4.12.5 Each application for an alternative fire protection feature shall be filed with the District and shall be accompanied by such evidence, letters, statements, results of tests, or other supporting information as required to justify the request. The District shall keep a record of actions on such applications, and a signed copy of the District's decision shall be provided for the applicant.
1.4.12.6 Approval. The District shall approve such alternative construction systems, materials, or methods of design when it is substantiated that the standards of the Code are at least equaled. If, in the opinion of the District, the standards of the Code shall not be equaled by the alternative requested, approval for permanent work shall be refused. Consideration shall be given to test or prototype installations.
1.4.13 Tests.
1.4.13.1 Whenever evidence of compliance with the requirements of the Code is insufficient or evidence that any material or method of construction
9
Page 44
Download HTML
RULES OF THE FIRE PREVENTION CODE BOARD OF APPEALS
does not conform to the requirements of the Code, or to substantiate claims for alternative construction systems, materials, or methods of construction, the District shall be permitted to require tests for proof of compliance to be made by an approved agency at the expense of the owner.
1.4.13.2 Test methods shall be as specified by the Code for the material in question. If appropriate test methods are not specified in the Code, the District is authorized to accept an applicable test procedure from another recognized source.
1.4.13.3 The District shall retain copies of the results of all such tests.
10
Page 45
Download HTML
AGENDA ITEM NO.
Sarasota Manatee Airport Authority
Budget/Year to Date Actual
For the Period Ending October 31, 2020
| For the Period Ending October 31, 2020 | |||||
| This Month This Year | Total Budget | Year to Date This Year | Budget Less Actual YTD | Actual YTD % | |
|---|---|---|---|---|---|
| Airline Rentals, Fees and Charges | |||||
| Landing Fees - Signatory | $12,799 | $442,280 | $12,799 | $429,481 | 2.9% |
| Landing Fees - Nonsignatory | 5,429 | 132,125 | 5,429 | 126,696 | 4.1% |
| Landing Fees - Nonscheduled | 176 | 0 | 176 | (176) | 0.0% |
| Preferential Apron Fees | 13,849 | 165,911 | 13,849 | 152,062 | 8.3% |
| Concourse Circulation | 272,411 | 3,163,179 | 272,411 | 2,890,768 | 8.6% |
| Baggage Claim Area | 94,775 | 1,071,841 | 94,775 | 977,066 | 8.8% |
| Gate Use Fees - Signatory | 0 | 197,400 | 0 | 197,400 | 0.0% |
| Terminal and Gate Fees - Nonsignatory | 56,870 | 1,593,700 | 56,870 | 1,536,830 | 3.6% |
| Airline Terminal Rent - Signatory | 115,010 | 1,349,744 | 115,010 | 1,234,734 | 8.5% |
| Airline Terminal Rent - Nonsignatory | 12,383 | 156,009 | 12,383 | 143,626 | 7.9% |
| Total Airline Revenues | 583,700 | 8,272,189 | 583,700 | 7,688,489 | 7.1% |
| Non-Airline Revenue | |||||
| Air Cargo Facility | 6,113 | 76,638 | 6,113 | 70,525 | 8.0% |
| Subtotal | 6,113 | 76,638 | 6,113 | 70,525 | 8.0% |
| Airfield | |||||
| Fuel Flowage Fees | 19,000 | 178,800 | 19,000 | 159,800 | 10.6% |
| Ground Lease Airfield | 14,511 | 174,129 | 14,511 | 159,618 | 8.3% |
| T-Hangar Facilities | 77,068 | 750,000 | 77,068 | 672,932 | 10.3% |
| Fixed Base Operators - Rent | 59,222 | 710,563 | 59,222 | 651,341 | 8.3% |
| Fuel Service - ASIG | 3,035 | 25,490 | 3,035 | 22,455 | 11.9% |
| Subtotal | 172,835 | 1,838,982 | 172,835 | 1,666,147 | 9.4% |
| Terminal Building | |||||
| RAC Counter Space | 14,500 | 174,000 | 14,500 | 159,500 | 8.3% |
| Other Terminal Rents | 18,730 | 244,439 | 18,730 | 225,709 | 7.7% |
| Advertising | 11,864 | 120,000 | 11,864 | 108,136 | 9.9% |
| Restaurant Services | 17,894 | 122,500 | 17,894 | 104,606 | 14.6% |
| Gift Shop | 16,229 | 115,800 | 16,229 | 99,571 | 14.0% |
| Miscellaneous | 0 | 300 | 0 | 300 | 0.0% |
| Vending | 0 | 6,500 | 0 | 6,500 | 0.0% |
| Subtotal | 79,216 | 783,539 | 79,216 | 704,323 | 10.1% |
| Terminal Area | |||||
| Car Rental % | 176,701 | 1,253,926 | 176,701 | 1,077,225 | 14.1% |
| Audit Settlement | 0 | 0 | 0 | 0 | 0.0% |
| Auto Parking | 224,899 | 738,100 | 224,899 | 513,201 | 30.5% |
| Ground Transportation | 313 | 68,878 | 313 | 68,566 | 0.5% |
| Fuel Flowage Fees - Menzies | 7,942 | 90,000 | 7,942 | 82,058 | 8.8% |
| RAC Ready Car Spaces | 4,620 | 55,440 | 4,620 | 50,820 | 8.3% |
| Parking Stickers/Hang Tags | 9,646 | 23,765 | 9,646 | 14,119 | 40.6% |
| Taxi Cab Service | 0 | 0 | 0 | 0 | 0.0% |
| RAC Buildings Land Rent | 42,220 | 506,633 | 42,220 | 464,414 | 8.3% |
| Subtotal | 466,340 | 2,736,742 | 466,340 | 2,270,402 | 17.0% |
| Non-Aviation Area | |||||
| University Self Storage Income | 53,424 | 500,000 | 53,424 | 446,576 | 10.7% |
| Buildings - Non-Aviation | 11,177 | 134,088 | 11,177 | 122,911 | 8.3% |
| Common Area Maint - Comm Parke | 0 | 0 | 0 | 0 | 0.0% |
| Land - Non-Aviation | 41,971 | 502,918 | 41,971 | 460,947 | 8.3% |
| Subtotal | 106,572 | 1,137,006 | 106,572 | 1,030,434 | 9.4% |
| Total Operating Revenue | 1,414,777 | 14,845,096 | 1,414,777 | 13,430,319 | 9.5% |
| Investment Income + Other Income | |||||
| Investment Income | |||||
| Interest Earned - Operating | 6,767 | 350,000 | 6,767 | 343,233 | 1.9% |
| Interest Earned - Other | 0 | 0 | 0 | 0 | 0.0% |
| Subtotal | 6,767 | 350,000 | 6,767 | 343,233 | 1.9% |
| Other Income | |||||
| Passenger Facility Charges | 123 | 3,483,810 | 123 | 3,483,687 | 0.0% |
| Customer Facility Charges | 80,222 | 1,893,666 | 80,222 | 1,813,444 | 4.2% |
| Grant Revenue - Other | 0 | 0 | 0 | 0 | 0.0% |
| Grant Revenue - FAA | 0 | 0 | 0 | 0 | 0.0% |
| Grant Revenue - FDOT | 0 | 0 | 0 | 0 | 0.0% |
| Miscellaneous Income | 260 | 10,000 | 260 | 9,740 | 2.6% |
| Miscellaneous Income - LEO | 0 | 0 | 0 | 0 | 0.0% |
| I.D. Badges | 2,457 | 12,000 | 2,457 | 9,543 | 20.5% |
| Profit/Loss on Disposal | 184 | 15,000 | 184 | 14,816 | 1.2% |
| Gain or Loss on Sale of Investments | 0 | 0 | 0 | 0 | 0.0% |
| Extraordinary Items | 0 | 0 | 0 | 0 | 0.0% |
| Asset Writedown/Up on Investments | (3,650) | 0 | (3,650) | 3,650 | 0.0% |
| Subtotal | 79,596 | 5,414,476 | 79,596 | 5,334,880 | 1.5% |
| Subtotal Investment Income & Other | 86,363 | 5,764,476 | 86,363 | 5,678,113 | 1.5% |
| Total Revenues | 1,501,140 | 20,609,572 | 1,501,140 | 19,108,432 | 7.3% |
8A
Page 46
Download HTML
Sarasota Manatee Airport Authority
Budget/Year to Date Actual
For the Period Ending October 31, 2020
| This Month This Year | Total Budget | Year to Date This Year | Budget Less Actual YTD | Actual YTD % | |
|---|---|---|---|---|---|
| Utilities | (5,561) | 583,000 | (5,561) | 588,561 | -1.0% |
| Electric-Utility | (1,580) | 73,500 | (1,580) | 75,080 | -2.1% |
| Refuse Collection | 236 | 92,100 | 236 | 91,864 | 0.3% |
| Water and Sewer | (6,905) | 748,600 | (6,905) | 755,505 | -0.9% |
| Subtotal | |||||
| Personnel | |||||
| Salary/Wages | 485,466 | 8,095,383 | 485,466 | 7,609,917 | 6.0% |
| Health Insurance | 169,635 | 1,981,175 | 169,635 | 1,811,540 | 8.6% |
| Retirement | 133,753 | 1,670,000 | 133,753 | 1,536,247 | 8.0% |
| Social Security | 28,031 | 488,022 | 28,031 | 459,991 | 5.7% |
| Medicare | 7,192 | 117,383 | 7,192 | 110,191 | 6.1% |
| Disability | 448 | 5,938 | 448 | 5,490 | 7.5% |
| Unemployment | 0 | 24,286 | 0 | 24,286 | 0.0% |
| Worker's Compensation | 22,091 | 278,863 | 22,091 | 256,772 | 7.9% |
| Employment Expenses | 0 | 5,000 | 0 | 5,000 | 0.0% |
| Subtotal | 846,615 | 12,666,050 | 846,615 | 11,819,435 | 6.7% |
| Administration | |||||
| Advertising | 3,500 | 157,550 | 3,500 | 154,050 | 2.2% |
| Air Carrier Incentive | 0 | 0 | 0 | 0 | 0.0% |
| Bad Debts Expense | 0 | 5,000 | 0 | 5,000 | 0.0% |
| CEO Auto Expenses | 1,174 | 17,100 | 1,174 | 15,926 | 6.9% |
| Public Relations | 0 | 33,000 | 0 | 33,000 | 0.0% |
| Customs | (2,050) | 180,000 | (2,050) | 182,050 | -1.1% |
| Data Processing | 5,325 | 95,000 | 5,325 | 89,675 | 5.6% |
| Dues and Subscriptions | 67,082 | 108,675 | 67,082 | 41,593 | 61.7% |
| Employee Service Awards | 612 | 5,525 | 612 | 4,913 | 11.1% |
| Entertainment | 0 | 7,900 | 0 | 7,900 | 0.0% |
| Insurance - Property | 47,349 | 596,415 | 47,349 | 549,066 | 7.9% |
| Insurance - General Liability | 5,659 | 73,886 | 5,659 | 68,227 | 7.7% |
| Insurance - Surety Bonds | 3,689 | 43,638 | 3,689 | 39,949 | 8.5% |
| Insurance - Vehicles | 5,407 | 72,239 | 5,407 | 66,832 | 7.5% |
| Legal Expense | 8,500 | 350,000 | 8,500 | 341,500 | 2.4% |
| Loss & Safety Program | 0 | 200 | 0 | 200 | 0.0% |
| Marketing Trade Show Registration | 0 | 18,100 | 0 | 18,100 | 0.0% |
| Miscellaneous | (291) | 30,500 | (291) | 30,791 | -1.0% |
| Office Supplies and Equipment | 2,349 | 43,125 | 2,349 | 40,776 | 5.4% |
| Postage | 0 | 6,200 | 0 | 6,200 | 0.0% |
| Professional Services | 21,679 | 424,825 | 21,679 | 403,146 | 5.1% |
| Records Retention | 0 | 1,000 | 0 | 1,000 | 0.0% |
| Sponsored Events | 400 | 4,900 | 400 | 4,500 | 8.2% |
| Staffing - Contracted | 0 | 0 | 0 | 0 | 0.0% |
| Taxes | 0 | 35,000 | 0 | 35,000 | 0.0% |
| Telephone Service | 9,895 | 248,860 | 9,895 | 238,965 | 4.0% |
| Training | 2,762 | 109,740 | 2,762 | 106,978 | 2.5% |
| Travel | 1,265 | 189,150 | 1,265 | 187,885 | 0.7% |
| Uniforms | 1,297 | 50,500 | 1,297 | 49,203 | 2.6% |
| Subtotal | 185,604 | 2,908,028 | 185,604 | 2,722,424 | 6.4% |
| Operations | |||||
| Air Conditioning | 932 | 27,500 | 932 | 26,568 | 3.4% |
| Carpentry | 1,139 | 14,500 | 1,139 | 13,361 | 7.9% |
| Common Area Maint - Comm Parke | 11 | 10,000 | 11 | 9,989 | 0.1% |
| Electrical | 1,585 | 41,700 | 1,585 | 40,115 | 3.8% |
| Equipment Rental | 0 | 11,500 | 0 | 11,500 | 0.0% |
| Equipment Repair | 5,715 | 115,650 | 5,715 | 109,935 | 4.9% |
| Loading Bridge Repair | 2,123 | 45,000 | 2,123 | 42,877 | 4.7% |
| Conveyor & Belts | 22 | 16,000 | 22 | 15,978 | 0.1% |
| Terminal Audio & Paging Repairs | 0 | 15,000 | 0 | 15,000 | 0.0% |
| Repairs Generator | 0 | 8,000 | 0 | 8,000 | 0.0% |
| FAA Mandated Security Measures | 0 | 500 | 0 | 500 | 0.0% |
| Fence and Gate Repair | 224 | 17,000 | 224 | 16,776 | 1.3% |
| Interior Planting | 0 | 300 | 0 | 300 | 0.0% |
| Irrigation System | 1,599 | 5,800 | 1,599 | 4,201 | 27.6% |
| Janitorial Service | 30,357 | 1,278,677 | 30,357 | 1,248,320 | 2.4% |
| Landscape Maintenance | 3,489 | 35,100 | 3,489 | 31,611 | 9.9% |
| Miscellaneous Construction | 9,944 | 62,650 | 9,944 | 52,706 | 15.9% |
| Paint and Markings | 21,476 | 64,000 | 21,476 | 42,524 | 33.6% |
| Permits & Licenses | 113 | 3,800 | 113 | 3,687 | 3.0% |
| Paving and Pavement Repairs | 0 | 58,500 | 0 | 58,500 | 0.0% |
| Plumbing | 2,648 | 24,400 | 2,648 | 21,752 | 10.9% |
| Radio Equipment Repairs | 0 | 3,300 | 0 | 3,300 | 0.0% |
| Service Contracts | 159,150 | 817,163 | 159,150 | 658,013 | 19.5% |
| Shipping & Freight | 0 | 0 | 0 | 0 | 0.0% |
| Shuttle Service | 440 | 8,000 | 440 | 7,560 | 5.5% |
| Vehicle Repairs | 2,741 | 59,000 | 2,741 | 56,259 | 4.6% |
| Subtotal | 243,708 | 2,743,040 | 243,708 | 2,499,332 | 8.9% |
Page 47
Download HTML
Sarasota Manatee Airport Authority
Budget/Year to Date Actual
For the Period Ending October 31, 2020
| This Month This Year | Total Budget | Year to Date This Year | Budget Less Actual YTD | Actual YTD % | |
|---|---|---|---|---|---|
| Supplies | |||||
| Fabrication Supplies | 0 | 14,500 | 0 | 14,500 | 0.0% |
| Extinguishing Agent | 0 | 15,000 | 0 | 15,000 | 0.0% |
| First Aid Supplies | 96 | 3,500 | 96 | 3,404 | 2.8% |
| Gas & Fuel | 5,001 | 89,000 | 5,001 | 83,999 | 5.6% |
| Identification | 0 | 11,000 | 0 | 11,000 | 0.0% |
| Janitorial Supplies | 9,119 | 161,850 | 9,119 | 152,731 | 5.6% |
| Lighting | 904 | 21,300 | 904 | 20,396 | 4.2% |
| Lighting - Airfield | 4,950 | 45,000 | 4,950 | 40,050 | 11.0% |
| Miscellaneous Supplies | 336 | 7,500 | 336 | 7,164 | 4.5% |
| Miscellaneous Terminal Furnishings | 0 | 2,000 | 0 | 2,000 | 0.0% |
| Non-Capital Equipment | 139 | 22,050 | 139 | 21,911 | 0.6% |
| Safety Supplies | 141 | 3,000 | 141 | 2,859 | 4.7% |
| Shop Supplies | 1,208 | 11,000 | 1,208 | 9,792 | 11.0% |
| Signage | 4,296 | 40,500 | 4,296 | 36,204 | 10.6% |
| Small Tools and Equipment | 2,880 | 24,300 | 2,880 | 21,420 | 11.9% |
| Vegetation Control | 0 | 15,000 | 0 | 15,000 | 0.0% |
| Ammunition/Wildlife Disbursement | 396 | 8,000 | 396 | 7,604 | 5.0% |
| Subtotal | 29,465 | 494,500 | 29,465 | 465,035 | 6.0% |
| Total Operating Expenses | 1,298,487 | 19,560,218 | 1,298,487 | 18,261,731 | 6.6% |
| Profit (Loss) from Operations | 202,653 | 1,049,354 | 202,653 | 846,701 | 19.3% |
| Depreciation and Amortization | |||||
| Amortization | 7,625 | 91,501 | 7,625 | 83,876 | 8.3% |
| Depreciation | 855,639 | 10,151,817 | 855,639 | 9,296,179 | 8.4% |
| Total Depreciation and Amortization | 863,264 | 10,243,318 | 863,264 | 9,380,055 | 8.4% |
| Other Expenses | |||||
| Marketing | 11,402 | 1,150,000 | 11,402 | 1,138,598 | 1.0% |
| Total Other Expenses | 11,402 | 1,150,000 | 11,402 | 1,138,598 | 1.0% |
| Net Profit (Loss) | ($672,013) | ($10,343,964) | ($672,013) | ($9,671,951) | 6.5% |
Page 48
Download HTML
Sarasota Manatee Airport Authority
Budget/Year to Date Actual
For the Period Ending October 31, 2020
| This Month This Year | Total Budget | Year to Date This Year | Budget Less Actual YTD | Actual YTD % | |
|---|---|---|---|---|---|
| Travel - CEO | $0 | $20,000 | $0 | $20,000 | 0.0% |
| Travel - Administration | 0 | 11,100 | 0 | 11,100 | 0.0% |
| Travel - Internal Audit & Records | 0 | 6,000 | 0 | 6,000 | 0.0% |
| Travel - ITS | 0 | 4,500 | 0 | 4,500 | 0.0% |
| Travel - Finance & Human Resources | 0 | 6,600 | 0 | 6,600 | 0.0% |
| Travel - Operations | 0 | 4,000 | 0 | 4,000 | 0.0% |
| Travel - Police | 0 | 3,000 | 0 | 3,000 | 0.0% |
| Travel - Facilities | 0 | 3,000 | 0 | 3,000 | 0.0% |
| Travel - ARFF | 0 | 15,650 | 0 | 15,650 | 0.0% |
| Travel - USS | 0 | 1,100 | 0 | 1,100 | 0.0% |
| Travel - Properties | 0 | 20,000 | 0 | 20,000 | 0.0% |
| Travel - Engineering & EA | 1,265 | 5,700 | 1,265 | 4,435 | 22.2% |
| Travel - Purchasing | 0 | 4,500 | 0 | 4,500 | 0.0% |
| Travel - Marketing & Public Relations | 0 | 34,000 | 0 | 34,000 | 0.0% |
| Travel - Commissioners | 0 | 10,000 | 0 | 10,000 | 0.0% |
| Travel - Professional Associations | 0 | 40,000 | 0 | 40,000 | 0.0% |
| Total Travel | 1,265 | 189,150 | 1,265 | 187,885 | 0.7% |
Page 49
Download HTML
AGENDA ITEM NO.
8
(4) Total yield is the weighted average yield.
(3) Market value on non-restricted funds are provided by the Custodian, US Bank.
(2) Interest on Notes is paid semi-annually, accrued monthly. Interest on CD's are paid monthly.
(1) US Government Bond Equivalent Yield.
| Description | Cusip/Invest | Coupon | Par Value | Acquisition Cost | Purchase Date | Maturity | Int. Rec'd | Market Value | Yield | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Orig Face | Yield | Date | (2) | (3) | @ Market | ||||||
| 1 | CenterState CD | 5532 | 1.900 | 2,000,000 | 1.910 | 2,000,000 | 12/3/2015 | 12/3/2020 | 3,501.50 | 2,000,000 | 1.91 |
| 2 | FNMA Note | 3136G3Y33 | 1.400 | 2,000,000 | 1.400 | 2,000,000 | 8/25/2016 | 8/25/2021 | 2,333.33 | 2,020,440 | 1.39 |
| Total Investments (4) | 4,000,000 | 1.655 | 4,000,000 | 5,834.83 | 4,020,440 | ||||||
Sarasota Manatee Airport Authority
Investment Portfolio
For the Month of October 2020
Page 50
Download HTML
| Transaction Date | Maturity Date | Description | Cusip/Invest | Coupon Yield | Original Face Purchase price | Sales Price Market Price | Gain or (Loss) on Sale |
|---|---|---|---|---|---|---|---|
| Securities Purchased: | |||||||
| NONE | |||||||
| Securities Closed: | |||||||
| 10/27/2020 | 10/27/2021 FNMA Note | 3136G4FS7 | 1.500 | 2,000,000 | 2,000,000 | 0 | |
| 1.500 | 1,999,000 | Called |
Sarasota Manatee Airport Authority
Investment Analysis - Portfolio Activity Report
For the Month of October 2020
Page 51
Download HTML
AGENDA ITEM NO. 8C
SARASOTA MANATEE AIRPORT AUTHORITY
FINANCE & ADMINISTRATION STAFF REPORT
NOVEMBER 17, 2020 REGULAR MEETING
FINANCE OCTOBER 2020
Budget/Financial Information:
Included in the Board packet is the unaudited Income Statement for October. Summary information contained therein for October is as follows: Operating revenues were approximately 14.3% higher than anticipated in the FY 2021 budget. Operating expenses were approximately 20.3% lower. Due to technical difficulties, we were unable to provide a Balance Sheet for October at this time. A Balance Sheet will be provided at the November 17 meeting.
COVID-19 waivers for October are $424,401.99 and deferrals are $176,530.89 for a total of $600,932.88. Revenue figures are net of waivers.
As part of the ongoing development of investment policies and procedures, reports have been developed based on information provided by Sarasota County Clerk of the Court. The current disclosure reflects an Investment Portfolio Analysis, along with a Portfolio Activity Report. Staff continues to work closely with the Clerk's office.
Passenger Facility Charge (PFC): A separate detail which reflects PFC collections for the month of October and cumulative to date.
Monthly Investment Report: September 2020 attached.
Page 52
Download HTML
Sarasota Manatee Airport Authority
Sarasota Bradenton International Airport (SRQ)
PFC Collections by Carrier
| Carrier | Oct-20 | Collected since Inception |
|---|---|---|
| Aces Airlines | 24.86 | |
| Aer Lingus | 1,324.00 | |
| Aero California | 8.64 | |
| Aero Costa Rico | 2.92 | |
| Aeroflot - Russian Airlines | 882.28 | |
| Aeromexico | 13.06 | 3,664.31 |
| AeroPeru | 19.02 | |
| Aeropostal Venezuela | 17.52 | |
| Air Aruba | 11.68 | |
| Air Canada | (25.01) | 1,020,619.12 |
| Air France | 30,872.02 | |
| Air India | 2.88 | |
| Air New Zealand | 1,973.36 | |
| Air Pacific Ltd. | 135.81 | |
| Air Portugal | 308.10 | |
| Air Serbia | 171.21 | |
| Air Sunshine | 109,075.76 | |
| Air Trans At | 144,133.51 | |
| AirTran Airways | 5,850,221.51 | |
| Alaska Airlines | 6,075.51 | |
| Alitalia | 3,969.83 | |
| All Nippon Airways (ANA) | 8.67 | 501.01 |
| Allegiant Air | 45,884.78 | 1,574,349.01 |
| Aloha | 46.64 | |
| America West | 116,500.91 | |
| American (AMR) | 42,996.59 | 3,730,784.31 |
| ATA Airlines, Inc. | 2,527,486.80 | |
| Asiana Airlines | 668.85 | |
| ATA Leisure Corp. | 90,614.78 | |
| Austrian Airlines | 636.04 | |
| AV Atlantic | 1,027.84 | |
| Avensa | 43.20 | |
| Avianca | 118.00 | |
| Aviateca, S.A. | 5.84 | |
| Big Sky | 2.92 | |
| British Airways | 10,729.55 | |
| Brussels Airlines | 87.69 | |
| BWIA | 78.84 | |
| Canada 3000 | 100,572.36 | |
| Canadian Airlines | 64,977.45 | |
| Canair | 20,334.88 | |
| CanJet | 120,295.00 | |
| Cape Air / Hyannis Air Service | 242.90 | |
| Carnival Air Lines | 1,883.40 | |
| Casino Air Link | 887.68 | |
| Casino Express | 8,389.66 | |
| Cathay Pacific | 3,145.87 | |
| Cayman Airways | 101.96 | |
| Champion Air (MLT, Inc.) | 9,343.96 | |
| China Airlines | 2,336.20 | |
| Colgan Air, Inc. | 151.86 | |
| ComAir | 21,805.38 | |
| Compania | 33.75 | |
| Conquest | 5.76 | |
| Continental Airlines | 3,580,174.07 | |
| Continental Micronesia | 44.05 | |
| Copa | 11.56 | |
| Croatia Airlines | 8.78 | |
| Czech Airlines (Aviation Industry Consultants) | 2,516.42 | |
| Delta Air Lines | 34,280.55 | 28,972,460.16 |
| El Al Israel Airlines | 1,267.91 | |
| Elite | 58,861.12 | |
| Emirates | 3,704.91 | |
| Empire | 757.44 | |
| Eva Airways | 735.34 | |
| ERA Aviation | 84.84 | |
| Etihad Airways | 316.08 | |
| Express One | 8,387.70 | |
| Falcon Express | 1,454.16 | |
| Faucett | 8.76 | |
| Finnair | 356.78 | |
| Florida Coastal Airlines | 8,516.60 | |
| Front Page Tours | 245.28 | |
| Frontier Airlines | 3,085.58 | 326,194.92 |
| G-P Express | 89.28 | |
| Gold Transportation Services | 26,702.01 | |
| Great Lakes Aviation | 44.06 | |
| Hahn Air | 2,956.82 | |
| Hawaiian Airlines | 969.86 | |
| Iberia | 1,145.75 | |
| Island Air | 30.73 | |
| Insel Air | 4.39 | |
| JAL (Japan Airlines) | 874.91 | |
| Jet Airways | 114.14 | |
| Jet Blue | 4,863,984.55 | |
| JetsGo | 6,418.18 | |
| Kenya | 21.95 | |
| KLM | 16.24 | 6,024.89 |
| Carrier | Oct-20 | Collected since inception |
|---|---|---|
| Korean Air | 16,775.23 | |
| Kuwait Airways | 2.92 | |
| Lacsa | 36.54 | |
| Laker Airways | 803.00 | |
| Lan Airlines | 21.95 | |
| Lan Argentina | 4.39 | |
| Lan Chile | 157.61 | |
| Lan Peru | 21.95 | |
| LATAM Airlines Group | 26.34 | |
| Leisure Air | 33,007.40 | |
| Lineas Aereas Privadas Argentinas | 11.68 | |
| Lone Star | 69.52 | |
| Lot Polish Airlines | 1,415.09 | |
| LTU | 74.88 | |
| Lufthansa | 6,713.34 | |
| Malaysia | 406.88 | |
| Malev Hungarian | 241.88 | |
| Mark Travel Corp. | 10,856.56 | |
| Mesa Airlines | 132.20 | |
| Compania Mexicana | 438.74 | |
| MGM Grand Air | 302.40 | |
| Miami Air Int'l | 5,515.47 | |
| Midway Airlines | 601.52 | |
| Midwest | 1,922.08 | |
| Mountain West | 11.68 | |
| National Airlines | 5.84 | |
| Nicaraguense de Aviacion | 5.84 | |
| North American Airlines | 443.39 | |
| Northwest | 1,996,108.91 | |
| Olympic Airways | 165.43 | |
| Pan American | 5.84 | |
| Panamena De Aviacion | 4.39 | |
| Paradise Island | 28.80 | |
| PenAir (Penninsula Airways) | 13.17 | |
| Private Jet | 3,715.56 | |
| Qantas | 3,780.53 | |
| Qatar | 1,567.45 | |
| Reno Air | 35,332.00 | |
| Republic Airlines | 3,612.86 | |
| Royal Air Maroc | 69.66 | |
| Royal Aviation | 10,170.36 | |
| Royal Jordanian | 29.20 | |
| Sabena | 393.92 | |
| SAHSA | 5.28 | |
| SAS (Scandivarian) | 3,878.96 | |
| Saudi Arabian Airlines | 7.31 | |
| Sevicios Avensa | 280.28 | |
| Silver Airways Corp | 114.14 | |
| Singapore | 2,926.69 | |
| Skyservice | 9,903.84 | |
| South African Airways | 4,309.11 | |
| Southeast Airlines | 6,234.20 | |
| Southwest | 567,157.23 | |
| Sun Country | 184,183.00 | |
| Sun Pacific Int'l (HMHF) | 3,612.04 | |
| Sunworld Int'l Airlines | 224.84 | |
| SwissAir | 5,266.55 | |
| Taca Int'l Air | 348.76 | |
| TAM Airlines (Aviation Industry Consultants) | 1,017.05 | |
| TAP Air Portugal | 220.87 | |
| Tower Air | 17.52 | |
| Trans Brasil Airlines | 20.44 | |
| Trans World Airways | 781,609.36 | |
| Turk Hava (Turkish) | 1,272.59 | |
| Ultrair | 2.88 | |
| United | 15,377.45 | 2,423,889.05 |
| US Air Shuttle | 2.92 | |
| US Airways | 8,883,648.83 | |
| USA 3000 | 79,178.04 | |
| V Australia (Virgin Blue) | 386.32 | |
| Varig | 668.53 | |
| Vietnam Airlines | 83.41 | |
| Virgin Atlantic | 4,698.70 | |
| Viscount Air Service | 2,006.04 | |
| Viscount Air Tours | 353.32 | |
| Vision | 2,809.60 | |
| WestJet | 59,525.15 | |
| World Airways | 35.04 | |
| Total | 141,637.91 | 68,622,114.84 |
| PFC checking Interest | 107.04 | 1,725,793.65 |
| PFC investment Interest | 1,526,893.55 | |
| Securities-bought | 32,071,184.66 | |
| Securities-sold | 32,058,520.85 | |
| Securities interest | 224,518.18 | |
| Service charges | 6,970.26 | |
| Expenditures | 71,861,939.82 | |
| Balance | 217,746.33 |
Page 53
Download HTML
Sarasota Manatee Airport Authority
PFC Monthly Status Report - Revenue and Expenditures
Month ended October 31, 2020
Total Collection Authority: $ 83,313,937
Approved applications
Appl. 1 June 29, 1992 92-01-I-00-SRQ Charge Expiration Date Approved Impose Approved Use Current Revenue Sep-20 Current Interest Sep-20 Total Collections Total Interest Total Revenue
June 27, 1995 92-01-I-01-SRQ Oct 1, 2001 38,715,000 0
Sept. 8, 1995 92-01-I-02-SRQ 0 0
Dec. 15, 1995 92-01-I-03-SRQ 2,642,400 0
July 27, 1998 92-01-I-04-SRQ (19,369,507) 0
Dec. 1, 1999 92-01-I-05-SRQ (250,000) 0
Dec. 28, 2000 92-01-I-06-SRQ (450,000) 0
June 17, 2009 92-01-I-07-SRQ 0 0
October 8, 2009 92-01-I-08-SRQ (7,342,881) 0
13,944,391 0 12,126,777 1,817,614 13,944,391
Appl. 2 Jan. 31, 1995 95-02-U-00-SRQ 0 5,395,493
Sept. 8, 1995 95-02-U-01-SRQ 0 2,642,400
July 27, 1998 95-02-U-02-SRQ 0 (86,868)
June 17, 2009 95-02-U-04-SRQ 0 (2,002,722)
October 8, 2009 95-02-U-05-SRQ 0 (621)
0 5,947,682
Appl. 3 Dec. 15, 1995 95-03-C-00-SRQ Apr 1, 2002 400,000 14,350,000
July 27, 1998 95-03-C-01-SRQ 250,000 86,868
Dec. 1, 1999 95-03-C-02-SRQ 450,000 0
Dec. 28, 2000 95-03-C-03-SRQ 0 0
June 17, 2009 95-03-C-05-SRQ 0 (5,690,098)
October 8, 2009 95-03-C-05-SRQ (349,939)
750,061 8,746,770 675,673 74,388 750,061
Appl. 4 Oct. 3, 2000 00-04-C-00-SRQ Feb 1, 2014 36,126,915 36,126,915
Feb. 22, 2002 00-04-C-01-SRQ 2,368,148 2,368,148
July 23, 2009 00-04-C-02-SRQ 22,194,884 22,194,884
Dec. 7, 2017 00-04-C-02-SRQ (887,886) (887,886)
59,802,061 59,802,061 141,637.91 107.04 55,819,664 $1,565,570 57,385,234
Appl. 5 May 7, 2019 19-05-C-00-SRQ 8,817,424 8,817,424
$83,313,937 $83,313,937 $141,638 $107 $68,622,115 $3,457,571 $72,079,666
Project number Description Use Appl. # Estimated Implementation Date Total Approved to Use Expenditures Month end Sep-20 Total Expended to Date Balance to Use Status
101A FAR Part 150 program 2 Oct 1, 1991 1,474,904 1,474,904 0 Project complete
105 Environmental assessment 2 Mar 28, 1994 63,132 63,132 0 Project complete
106 RPZ land acquisition 2 Sep 28, 1994 3,562,521 3,562,521 0 Project complete
108 Rehabilitate Taxiway A 2 Jan 1, 1993 819,836 819,836 0 Project complete
113 Rehabilitate Taxiway I now F Total 2 Jul 1, 1992 27,289 27,289 0 Project complete
5,947,682 0 5,947,682 0
101B FAR Part 150 program 3 Oct 1, 1991 3,063,506 3,063,506 0 Project complete
102 Airfield drainage 3 Oct 1, 1996 148,676 148,676 0 Project complete
107 Lengthen runway 14/32/barriers 3 Dec 1, 1997 4,784,527 4,784,527 0 Project complete
117 Develop, of Regional Impact Total 3 Sep 18, 1995 750,061 750,061 0 Project complete
8,746,770 0 8,746,769 0
118 Terminal development debt service Amendment 4 Oct 1, 2000 60,689,947 137,000 57,167,488 2,634,573 Collection and use approved for terminal related debt service Amount budgeted for FY 2021 is $3,483,810
(887,885)
59,802,061 137,000 57,167,488 2,634,573
5.01 Passenger Loading Bridge 5 Dec 1, 2021 2,579,924
5.02 Air Traffic Control Tower 5 Dec 1, 2022 6,192,800
5.03 Administration Cost Reim Total 5 Dec 1, 2021 44,700
8,817,424 0 0 8,817,424
$83,313,937 $137,000 $71,861,940 $11,451,997
Page 54
Download HTML
SARASOTA BRADENTON INTERNATIONAL
SARASOTA MANATEE AIRPORT AUTHORITY
MONTHLY INVESTMENT REPORT
September 2020
Prepared by Karen E. Rushing, Clerk of the Circuit Court and County Comptroller
Summary of Investment Strategy: At its September meeting, the Federal Reserve reiterated its plea for another round of stimulus spending from the Federal Government to stave off a drop in economic momentum. Democrats and Republicans have yet to find the common ground necessary to agree to any additional spending. Despite the fact that employment levels have improved, the recovery appears to have already lost some upward momentum in recent weeks as the first stimulus package runs out. Growth in retail spending has declined recently and consumer confidence has weakened. Federal Reserve officials hope that their new stance on inflation combined with more aggressive action on the fiscal side will deliver faster inflation gains. Something the Fed has struggled to achieve in the past.
KEY ECONOMIC INDICATORS
โฆโฆ
ISM Manufacturing came in at 56.0 in August, above expectations of 54.8.
Non-Farm Payrolls rose by 1.37 million in August which was slightly better than expectations of a 1.35 million increase.
Average hourly earnings were up 4.7% in August. This was better than expectations of a 4.5% increase.
Producer prices ex-food and energy, year over year rose 0.6% in August which was better than expectations of a 0.3% increase.
โข Retail sales ex auto and gas rose 0.7% in August which was below expectations of a 0.9% increase.
Existing home sales rose by 2.4% in August. This was in line with expectations.
ISM Services Index was slightly below expectations in August, coming in at 56.9 versus expectations of 57.
The Federal Reserve pledged to support the economic recovery by setting a higher bar to raise interest rates and signaling the economy wouldn't likely to unend its projections for at least three more years.
Deaths in the U.S. attributed to the Coronavirus neared 200,000 amid worries that the country was heading for another wave of infections.
U.S. consumers increased retail spending in August for the fourth straight month but at a slower pace than earlier in the summer.
The mortgage market recorded its best quarter in years this spring, reflecting how the housing market is booming even as much of the economy stumbles.
Fed Chairman Powell said the economic response to the pandemic alleviated the fallout but suggested Congress would likely need to spend more.
PORTFOLIO COMPOSIIO
YIELD COMPARISON
1.90
1.84
0.49
0.28
0.19
0.13
0.09
Page 55
Download HTML
โฆโฆ
SARASOTA
BRADENTON
INTERNATIONAL
September 2020
PORTFOLIO STATISTICS
*Includes Cash
| April | May | June | July | August | September | |
|---|---|---|---|---|---|---|
| Portfolio at Cost | $ 24,395,901 | 23,263,874 | 21,797,896 | 20,381,769 | 22,653,080 | 23,387,239 |
| Market Value Portfolio | $ 24,435,001 | 23,297,484 | 21,828,956 | 20,412,399 | 22,680,410 | 23,411,329 |
| Yield Based Upon Cost | 1.77% | 1.84% | 1.84% | 1.83% | 1.84% | 1.84% |
| Interest Received (Cash Basis) | $ 36,338 | 36,004 | 33,683 | 31,441 | 35,037 | 36,199 |
| Interest Received Fiscal Year to Date | $ 406,108 |
SHOCK ANALYSIS
The portfolio shock analysis is a proactive risk management tool, utilized to evaluate how the Airport Authority's current portfolio would react to certain defined interest rate scenarios. This tool enables us to monitor the county's interest rate risk exposure to ensure it is aligned with the requirements of the investment policy. The table below presents the base scenario on how the portfolio is performing in the current interest rate environment, accompanied by scenarios of interest rate increases, and decreases. Cash is included in this analysis using Bloomberg analytics.
| Down 50 Basis Points | Down 25 Basis Points | Base | Up 25 Basis Points | Up 50 Basis Points | |
|---|---|---|---|---|---|
| Book Value | $ 23,387,239 | $ 23,387,239 | $ 23,387,239 | $ 23,387,239 | $ 23,387,239 |
| Market Value | 23,421,541 | 23,415,676 | 23,411,329 | 23,406,982 | 23,402,735 |
| Gain/(loss) unrealized | 10,212 | 4,347 | 0 | (4,347) | (8,594) |
| Market price | 100.142 | 100.117 | 100.099 | 100.080 | 100.062 |
| Book Yield | 1.84 | 1.84 | 1.84 | 1.84 | 1.84 |
| WAL | 0.14 | 0.14 | 0.14 | 0.14 | 0.14 |
| Effective Duration | 0.09 | 0.09 | 0.09 | 0.09 | 0.09 |
| Effective Convexity | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
CASH FLOW FORECAST
The cash flow forecast chart is a graphical representation of the annual projected cash flows of the Airport Authority's investment portfolio resulting from expected investment maturities and calls. This management tool is utilized to evaluate portfolio liquidity, to make sure there is sufficient cash on hand to meet day-to-day expenses, and optimize reinvestment of excess funds.
Sarasota Manatee Airport Authority
6000 Airport Circle, Sarasota, FL 34243 + www.srq-airport.com
Page 56
Download HTML
HUMAN RESOURCES
OCTOBER 2020
โฆโฆ
HUMAN RESOURCES DEPARTMENT
ACTIVITY FOR THE MONTH OF OCTOBER 2020
OPEN POSITIONS
| POSITION | NUMBER OF POSITIONS | OF APPLICANT | S FILLED | APPLICANTS HIRED | STARTING DATE |
|---|---|---|---|---|---|
| Maintenance Technician* | 2 | 23 | 1 | Julio Monroy | 10/5/2020 |
| Police Officer PT | 1 | 6 | |||
| TOTALS | 3 | 29 | 1 |
TERMINATED/RESIGNATION/RETIREMENT
| NAME | HIRE DATE | EFFECTIVE DATE | POSITION |
|---|---|---|---|
| Jeffrey Karr | 3/13/2017 | 10/1/2020 | Traffic Control Specialist |
| Don Albright | 5/17/2010 | 10/16/2020 | Electronic Systems Specialist |
The following positions(s) are funded in the FY 21 Budget, but have not been authorized to fill at this time.
| POSITION | NUMBER OF POSITIONS | DEPARTMENT |
|---|---|---|
| Equipment Operator | 1 | Facilities |
*Electronic Systems Specialist is being replaced with a Maintenance Technician
Page 57
Download HTML
PURCHASING
OCTOBER 2020
BIDS/QUOTES: Customs Kiosk has had some printer issues and incorrectly selecting the size of the aircraft which we are addressing. We have requested a few corrections on the screens which Livewire is working on for us.
The Authority Board approved the Terminal Bathroom Remodel. Construction should begin in late October. The project will be done in three phases and all phases should be complete by late November. Bathroom fixtures will all be touchless. New design will also feature the towel dispensers to be over the sinks and the garbage cans will be placed under the counters making it easier for our passengers which should help keep the bathroom floors drier and less paper on them. Contractor is having issues with the getting the custom counters and mill work and project has been delayed by about three weeks. Work on the project has started the first week of November.
Working on installing sneeze guards and hand sanitizer station throughout the Terminal as we start Phase 1 restrictions in Florida. All the sneeze guards and hand sanitizer stations are installed. Trying to procure Touchless Dispensers for these stations. FAA will be shipping 73,000 paper masks for use by our passengers. They will also be giving the Authority 1300 cloth masks for our employees to use. We have purchased Touchless Hand sanitizer Dispensers for our stands to help our passengers remain safe and comfortable in our terminal. The new Temperature Monitors have been working well. We have been working with our cleaning company to improve staffing levels and detail to maintain the Terminal at needed levels. We have seen some positive results the past few weeks with the addition of trained floor techs and a continued emphasis on upgrading the cleaning staff.
Informal written quotes requested from prospective suppliers to provide airport lighting/lamps, artificial plants, batteries, computer hardware, technical support and software related items, electrical fixtures, extinguishing agents, firefighting gear, landscaping supplies, loading bridge repairs and supplies, industrial supplies, MRO items, office chairs, paint and paint supplies, promotional and advertising novelties, rental equipment, tires, tractor, uniforms, etc. and other misc. repairs and services.
WAREHOUSE: The Warehouse continues to add and delete items stocked in inventory and to generate purchase orders to replenish stock based on monitoring of inventory levels: 0 new items added, and we have reduced the number of items in the warehouse by 0. Purchasing is reviewing all stock items to further reduce non-Purchasing is reviewing all stock items to further reduce non-usage/slow moving items as needed. Year-end inventory count went well with no major issues. This year we reduced the ending inventory value to $133,431 down from $137,874 last year. Number of stocking units was 860.
On-line auction activity through GovDeals for surplus/obsolete items: There were $4,285.00 of sales in the month of October 2020.
DEPARTMENT PROJECTS:
We have increased our PPE Supplies to levels to needed levels to be able to supply the Authority if needed. We received our supply of 1,300 masks from the FAA to be used by Airport employees. We have received 73,000 more masks from the FAA to be used by airlines for our passengers. We still have a majority of the Masks that are for the Airlines use. Our supplies of PPE items are at good levels just in case Florida and our area has a second wave which is predicted nationally.
We have been updating our inventory levels to make sure we have needed supplies in the event that Corona Virus effects our staff. We have held meetings with our Janitorial Company to increase levels of wiping down and sanitizing our guest areas, especially where our guests touch surfaces throughout the terminal. So far, we have been able to get needed supplies and the Janitorial Company has done an outstanding job on keeping all the Authorities buildings clean and sanitized.
Will be looking at inventory levels and developing a list of items that need to be removed from inventory throughout the year. We see a lot of change in lighting from traditional fluorescent lights to our conversion to LED's. We have also seen the increase in different mower brands which has added new stocking items to our inventory.
Page 58
Download HTML
Other Activities and Meetings: Purchasing has completed testing an Airport Authority Training Manual for the Great Plains Purchasing/Inventory Module specific to Airport procedures and Policies. Training Manuals have been distributed to all users. Purchasing has started to review all Bid Documents used by the Authority to make sure they are current and meet all government statutes. Internal meetings with general staff, finance, administrative staff and employees, insurance notices, notices of insurance renewals and compliance, research products, services and sources for department needs, supplier visits, pre-construction meetings, sales calls, training sessions for employees on procurement software, and vendor debriefings.
CONTRACTS ISSUED: EPC Group (Microsoft Licensing).
SUMMARY OF DEPARTMENT ACTIVITY FOR THE MONTH:
PURCHASING:
Purchase Orders Issued: 181
Blanket Purchase Orders Issued: 65
Emergency Purchase Orders Issued: 0
Change Orders Issued: 0
Contracts Issued: 1
WAREHOUSE/RECEIVING:
โ Inventory Stock Transaction Issued: 709 units
Courier Activity: 103 runs totaling 536 miles
NOTICE TO THE BOARD: Per the Purchasing Policy, all purchases $35,000.01 - $150,000.00 require at least three written quotes. All exceptions shall be noted to the Authority at its next regular meeting. The following are exceptions to this policy for October 2020: NONE.
Page 59
Download HTML
AGENDA ITEM NO. 8D
SARASOTA MANATEE AIRPORT AUTHORITY
REAL ESTATE DEVELOPMENT & PROPERTIES STAFF REPORT
NOVEMBER 17, 2020 REGULAR MEETING
Airlines: The Board unanimously approved the extension of COVID 19 Relief Guidelines to Defer/Waive Airport Tenant Rents and Fees through December 31, 2020 at the September 28 regular meeting.
Property 7: SMAA is preparing DRI zoning submittals for this property and a formal pre-application will be scheduled. Leasing/listing agreement discussion to recommence with CBRE for the outparcels.
Property 12: The wetlands and drainage easements are under investigation as to remove/modify for development. This property will be mixed use and include such uses as restaurants, office and hotels along with airport facilities. Properties has included this property in the DRI zoning application underway with Property 7.
University Self-Storage: The former Honeywell building is under consideration to redevelop as an alternate for self-storage facility, selection of a consultant is underway.
Rental Car Consolidation/Status: Planning and design for Phase I for the remodel of ticketing, offices and a covered walkway is underway. Selection of a consultant for Phase II is in process. MAG and land rent have been suspended through December 31, 2020; percentage of monthly gross revenues due.
Fuel Farm: Fuel Farm expansion project continues to proceed with modified tank specifications.
Airport Hotel #2: SRQ2, LLC, construction continues at the workspace hotel at 975 University Parkway.
North Quad: Marketing concept plan under consideration within the Master Plan. Next step is to analyze and determine the most suitable aviation uses for the park to pursue. Discussions with aviation brokers and developers continue.
Team Success: General Ground Lease approved by both the SMAA and FAA. A Letter of Agreement for Establishment of Aviation Immersion Program was approved at the September 28 regular meeting. A task force has been formed between SMAA staff and Team Success to develop the immersion program between the airport, airport tenants, youth aviation programs (EAA & CAP) and the students. A modification of the DRI is underway to allow the school use at this property. The Tenant has submitted for its GDP at Manatee county as well.
Concessions: The concessions MAG continues to be suspended thru December 31 with actual percentage rent only.
Property #10/M-lot: Plans for this project are out to bid for both MTC and the 3^{rd} hangar to accommodate general uses. The Ground Lease with Improvements is in review by the tenant. SMAA is contemplating proceeding with the 3^{rd} hangar which will require a bid modification.
Property 2: Properties is marketing this property to industrial tenants. Properties is exploring/discussing potential leasing/listing with brokers, as well as JV opportunities. Properties submitted a construction license (and easement) for a traffic light to be installed by others at the entrance of the airport's future development, which was approved at the September 28 meeting.
1
Page 60
Download HTML
Parking: The reduction of Reef Parking management fees has been extended thru the end of the calendar year. The Parking operations will continue to be monitored and adjustment to operation/labor will be made as traffic recovers.
Honeywell Building: A retrofit to self-storage is under consideration and analysis will be completed to determine the feasibility of this repurpose. Met with a potential consultant for the redevelopment project.
Expansion of FBO: Additional hangars are contemplated at Dolphin. Dolphin has submitted to SMAA/county for additional hangars. Review of zoning/plans underway. In addition, Ross Aviation indicates interest in expansion of hangars as well, however, no plans forth coming as of this time.
On-Demand Taxi: On-Demand car service provider, ALD Limo Corporation, began operations on August 1 and Properties is monitoring their monthly reports which indicate how many trips were taken the previous month. For the month of October, they reported more trips as compared to last year at this time.
Site Selection Intelligence Report: Working with Marketing to develop a SRQ properties advertisement to be published in November.
General: Insurance notices, tenant inquiries, showing of properties, construction permits, meetings with surveyors, appraisers, contractors and engineering consultants, collections and past due notices, notices of insurance renewals and compliance, loss prevention committee, meetings with insurance claimants, planning and staff meetings.
General Aviation:
โค Compliments: 0
โค Complaints: 0
Maintenance Requests: 3
โข Total number of tenants: 162
โค Total rentable spaces: 167
โข 101 tenants utilizing auto credit card method of payment.
D3-106 leased September 27.
J8-113 vacated end of October. D3-106 transferred to J8-113.
D2-107 transferring to D3-106 (48'W).
D1-116, J1-113 vacated end of October. To be leased in November.
T-HANGAR MONTHLY STATUS REPORT
FOR THE MONTH OF OCTOBER 2020
| Item | Qty. | No. Leased | Wait List | Leased % | Monthly Rate | Monthly Rent | Annual Rent |
|---|---|---|---|---|---|---|---|
| T-Hangars | |||||||
| 51'5 W Oversize | 4 | 4 | 17 | 100% | $1,700.00 | $6,800.00 | $81,600.00 |
| 48' W Large | 27 | 27 | 17 | 100% | $574.00 | $15,498.00 | $185,976.00 |
| 42' W Standard + (PLUS) w/additional 176 sq. ft. storage | 4 | 4 | 0 | 100% | $519.00 | $2,076.00 | $24,912.00 |
| 42' W Standard | 121 | 121 | 23 | 100% | $419.00 | $50,699.00 | $608,388.00 |
| 42' W Standard Discounted rate for CAP & EAA | 2 | 2 | 100% | $250.00 | $500.00 | $6,000.00 | |
| Storage Rooms | 7 | 3 | 43% | $100.00 | $300.00 | $3,600.00 | |
| Storage Rooms Discounted rate for CAP & EAA | 2 | 2 | 100% | $10.00 | $20.00 | $240.00 | |
| TOTALS | 167 | 163 | 57 | $75,893.00 | $910,716.00 | ||
2
Page 61
Download HTML
AGENDA ITEM NO. 8E
SARASOTA MANATEE AIRPORT AUTHORITY
ARFF, OPERATIONS & POLICE DEPARTMENTS
NOVEMBER 17, 2020
OPERATIONS DEPARTMENT - PROJECT/ACTIVITY/INCIDENT REPORT FOR THE MONTH OF OCTOBER
Projects and Activities
Working with Integrated Fire & Security Solutions to oversee the access control system replacement project. Coordination with tenants to minimize disruptions in their areas when card readers are replaced.
Working with the master drainage contractor for daily escorts of the watering truck on TWY A and 1 runway closure for grooving.
Operations conducted multiple vehicle and aircraft escorts throughout the month.
Operations responded to multiple vehicle gate issues due to sensor issues.
Operations conducted multiple โdrivers trainingโ sessions on the airfield
Operations responded to multiple jet bridge problems. Most were able to be resolved within a few minutes.
Operations responded to multiple wildlife calls throughout the month.
Oct 3: Ops responded to assist jetBlue with a Common Use problem.
Oct 4: Ops responded to an HMS Host employee who was stuck in the freight elevator.
Oct 7: Ops assisted with resolving a PA issue with the Sirius radio subscription.
Oct 17: Ops assisted United with a common use issue.
Oct. 19: Ops responded to USS vehicle storage for a gate malfunction.
Oct. 21: Ops closed RWY 14/32 for overnight maintenance work for the FAA.
Oct 25: Ops escorted a USAF C-17 to parking on the east ramp.
Alerts and Incidents
Operations responded to and completed FAA paperwork on 2 bird strikes. In one case the bird was not able to be identified and was sent to the lab for proper identification.
Oct 8: Ops responded to Dolphin aviation for a vehicle vs. aircraft collision.
Oct 12: Ops responded to a fuel spill at Rectrix South.
Oct 16: Ops responded to an aircraft accident on RWY 14. A Beech Bonanza gear collapsed upon landing. ARFF, Ops and Facilities worked together to remove the aircraft from the RWY.
Oct 20: Ops responded to an Alert II, where a Piper Cherokee reported an alternator failure. Aircraft landed safely and taxied to Dolphin.
Miscellaneous Activities
98 NOTAMs were issued during the month of August.
AIRCOM dispatched & Ops responded to 12 Medical Runs, 4 requiring SCFD response.
49 CHRC (fingerprint checks) were conducted.
69 new I.D. badges were issued and 57 were renewed.
191 Security Threat Assessments were completed.
345 Computer Based Training Classes were conducted during the month.
Page 62
Download HTML
FIRE DEPARTMENT
NOVEMBER 2020
| SAFETY INCIDENT/RESPONSES FOR THE MONTH OF OCTOBER 2020 | |||
| TYPE OF RESPONSE | AREA OF RESPONSE | NUMBER OF RESPONSES | TOTAL YEAR TO DATE |
|---|---|---|---|
| EMT FIRST AID RESPONSES: | Aboard Aircraft | 1 | 13 |
| Parking lot | 0 | 4 | |
| ARFF walk-in | 0 | 0 | |
| "B" Concourse | 4 | 42 | |
| Baggage Wing | 1 | 10 | |
| TSA Checkpoint | 0 | 9 | |
| 2nd floor lobby | 0 | 3 | |
| EMT room | 0 | 0 | |
| Restaurant | 0 | 3 | |
| Curbside | 1 | 9 | |
| Escalator | 0 | 3 | |
| Ticket wing | 2 | 11 | |
| Other | 3 | 31 | |
| 12 | 138 | ||
| FIRE RESPONSES: | Terminal | 0 | 0 |
| Aircraft | 0 | 0 | |
| Vehicle | 0 | 2 | |
| Bushes | 0 | 2 | |
| Other | 0 | 0 | |
| Fire Alarms | 0 | 1 | |
| Smoke Detector / Smell of Smoke | 0 | 8 | |
| TOTAL FIRE / ALARM: | 0 | 13 | |
| HAZARDOUS MATERIALS RESPONSES: | Oil | 0 | 0 |
| Fuel Spill | 1 | 6 | |
| Other | 0 | 0 | |
| TOTAL HAZARDOUS MATERIAL: | 1 | 6 | |
| AIRCRAFT EMERGENCY RESPONSES: | Alert I | 0 | 0 |
| Alert II | 1 | 8 | |
| Alert III | 1 | 1 | |
| TOTAL AIRCRAFT EMERGENCY: | 2 | 9 | |
| SUPPLEMENT REPORT | 0 | 0 | |
| TOTAL RESPONSES | 15 | 166 | |
2
Page 63
Download HTML
POLICE DEPARTMENT
NOVEMBER 2020
POLICE ACTIVITIES OCTOBER 2020
| CRIMES | |
| ASSAULT/BATTERY | 0 |
|---|---|
| BOMB THREATS | 0 |
| CAR THEFTS | 3 |
| DAMAGE TO PROPERTY | 0 |
| DISORDERLY CONDUCT | 1 |
| FIELDS INTERVIEWS | 4 |
| DOMESTIC VIOLENCE | 0 |
| NARCOTICS | 0 |
| PERSONAL PROPERTY THEFT | 0 |
| RETAIL THEFT | 0 |
| SUSPICIOUS PERSON | 7 |
| SUSPICIOUS VEHICLE | 3 |
| TRESPASS | 0 |
| WEAPONS | 0 |
| OTHER CRIMES | 1 |
| TOTAL: | 19 |
| PATROLS | |
| AOA | 120 |
| CONCOURSE PATROL | 213 |
| SECURITY CHECKPOINT | 172 |
| GROUND TRANS | 50 |
| PARKING LOTS | 172 |
| PERIMETER (INSIDE) | 72 |
| ROADWAY | 176 |
| BAGGAGE AREA PATROL | 164 |
| TACTICAL PATROLS | 28 |
| SECURITY PATROLS | 343 |
| TOTAL: | 1510 |
| CHECKPOINTS | |
| AOA BREACH | 0 |
| ASSIST TRINITY MISC. | 0 |
| CHECKPOINT BREACH | 0 |
| DOOR ALARMS | 15 |
| DRUGS | 0 |
| EXIT LANE ALARM | 11 |
| EXIT LANE BREACH | 0 |
| HOLD BAGGAGE CALLS | 0 |
| NO FLY LIST | 0 |
| OTHER PROHIBITED ITEMS | 0 |
| SUSPICIOUS ITEMS | 0 |
| OTHER | 0 |
| TOTAL | 26 |
| INSPECTIONS | |
| COMMERCIAL INSPECTION | 123 |
|---|---|
| GATE INSPECTION | 54 |
| GT INSPECTION | 168 |
| SIDA CHECK | 110 |
| OTHER INSPECTIONS | 0 |
| TOTAL: | 455 |
| TRAFFIC | |
| DISABLED VEHICLE/TOWING | 0 |
| PARKING TICKETS | 0 |
| TRAFFIC CRASHES | 1 |
| TRAFFIC CITATIONS | 0 |
| WARNINGS | 0 |
| OTHER TRAFFIC | 2 |
| TOTAL: | 3 |
| ASSISTANCE | |
| BAKER/MARCHMAN ACT | 0 |
| CUSTOMERS | 20 |
| MOTORISTS | 3 |
| OUTSIDE AGENCIES | 11 |
| SMAA EMPLOYEE/DEPT | 0 |
| TENANTS | 13 |
| MEDICAL CALLS | 11 |
| LOST & FOUND LOGGED | 17 |
| LOST & FOUND RETURNED | 4 |
| LOST & FOUND INQUIRIES | 80 |
| TOTAL: | 159 |
| WEAPONS | |
| EXPLOSIVES | 0 |
|---|---|
| FIREARM PARTS/AMMO | 0 |
| FIREARMS AT CHECKPOINT | 2 |
| UNDECLARED WEAPONS | 0 |
| OTHER WEAPONS | 2 |
| TOTAL: | 4 |
| ARRESTS | 0 |
| ARRESTS FELONY | 1 |
| ARRESTS JUVENILE | 0 |
| ARRESTS MISD | 0 |
| E-WARRANTS | 0 |
| SAO REFERAL | 0 |
| NOTICE TO APPEAR | 1 |
| OTHER ARRESTS | 0 |
| TOTAL: | 2 |
3
Page 64
Download HTML
โฆโฆ
OPERATIONS
NOVEMBER 2020
NOISE MONITORING AND FLIGHT TRACKING FOR THE MONTH OF OCTOBER
The chart to the right displays the distributions of noise complaints for the month of October 2020. There were 5 calls which generated 5 complaints by the Noise Abatement Hotline or by the Operations Department.
Of the total complaints, 60% from Manatee County and 40% from Sarasota County. The average number of calls received for the month were 0.16 calls per day.
Flight Tracking & Runway 32 Deviation data is for October 2020. There were 2 air carrier and 32 private jet deviations observed during this period.
In October 2020, American (AAL) had 2 deviations Select operators not complying with Standard Instrument Departure (SID) are sent a notification informing them of the SID, and requesting information on the deviation (Development Order 99-50 N8). This office continues to work with representatives from the airlines, private jets and the SRQ ATCT to ensure compliance with SRQ5 & SKRUS Four Departure Procedures (NADP for Runway 32).
RUNWAY UTILIZATION
The overall runway utilization for the month of OCTOBER 2020 is distributed as follows:
| Operations | Runway 04 | Runway 22 | Runway 14 | Runway 32 |
|---|---|---|---|---|
| Arrivals | 6% | 3% | 64% | 27% |
| Departures | 16% | 5% | 59% | 21% |
4
Page 65
Download HTML
AGENDA ITEM NO. 8F
SARASOTA MANATEE AIRPORT AUTHORITY
DEVELOPMENT/COMMUNITY RELATIONS & ACTIVITY REPORT
NOVEMBER 17, 2020
SRQ AMBASSADORS
In October, volunteer services were suspended due to COVID-19. In addition, no tours were offered.
MEDIA RELATIONS
Met with or contacted this month by reporters from the Sarasota Herald-Tribune, the Bradenton Herald, ABC7, SNN TV, Bay News 9 and News Channel 8.
Mark Stuckey, Executive Vice President, Chief of Staff: October 21 โ November 13, 2020
10/22 Provided site visit to potential new airline
10/25-28 Attended TakeOff Conference in Denver, CO. Meetings with 8 airlines
10/29 Teleconference: Bradenton Area CVB and Aqua Marketing
11/4 Teleconference: BACVB
11/5 Provided site visit to potential new airline
11/6 Held projects meeting with General Staff
Fredrick Piccolo, President, CEO: October 29 โ November 13, 2020
11/3 Teleconference: ACI World Executive Committee
ACI Fund Council virtual meeting
11/4 Teleconference: ACI-NA COVID 19- Small Hub Committee
Tourism Brainstorming meeting w/BACV/SRQ
11/5 Teleconference: ACI World Governing Board
11/9 Teleconference: ACI-NA Political Affairs Subcommittee meeting
11/11 SANCA (Suncoast Aquatic Nature Center) BOD meeting at NBP
11/12 ACI World Annual General Assembly - Virtual meeting
Mr. Piccolo participates in various impromptu media interviews throughout the month
Page 66
Download HTML
Page 67
Download HTML
2020 2019 % CHANGE 2020 YEAR TO DATE 2019 YEAR TO DATE % CHANGE 12 MONTHS ACTIVITY
THRU OCTOBER % CHANGE
2020 2019
AIRCRAFT OPERATIONS
ITINERANT
AIRLINES 1,291 1,359 -5.00% 12,197 13,693 -10.93% 15,927 16,133 -1.28%
AIR TAXI 930 893 4.14% 7,866 8,579 -8.31% 9,905 10,294 -3.78%
GENERAL AVIATION 5,171 4,920 5.10% 47,907 53,638 -10.68% 58,177 63,386 -8.22%
MILITARY 171 191 -10.47% 2,314 1,734 33.45% 2,678 2,230 20.09%
TOTAL ITINERANT 7,563 7,363 2.72% 70,284 77,644 -9.48% 86,687 92,043 -5.82%
GENERAL AVIATION (Local) 2,519 3,185 -20.91% 30,492 31,136 -2.07% 37,176 37,541 -0.97%
TOTAL OPERATIONS 10,082 10,548 -4.42% 100,776 108,780 -7.36% 123,863 129,584 -4.41%
TOTAL PASSENGERS:
ON 52,618 76,818 -31.50% 510,519 779,272 -34.49% 711,057 908,889 -21.77%
OFF 58,265 83,509 -30.23% 501,158 777,056 -35.51% 711,242 912,556 -22.06%
TOTAL 110,883 160,327 -30.84% 1,011,677 1,556,328 -35.00% 1,422,299 1,821,445 -21.91%
ACTIVITY MONTH: OCTOBER
ACTIVITY REPORT
SARASOTA-MANATEE AIRPORT AUTHORITY
SARASOTA BRADENTON INTERNATIONAL AIRPORT
Page 68
Download HTML
SARASOTA BRADENTON INTERNATIONAL AIRPORT
TOTAL PASSENGERS - OCTOBER 2020
MONTH / YEAR-TO-DATE COMPARISON
| MONTH | YEAR-TO-DATE | YTD MKT SHARE | |||||||
| AIRLINES | 2020 | 2019 | % CHG | 2020 | 2019 | % CHG | 2020 | 2019 | 2019 |
| [MAJOR CARRIERS] | |||||||||
| AIR CANADA | 0 | 594 | -100.0% | 24,989 | 34,909 | -28.4% | 3.1% | 2.7% | |
| ALLEGIANT | 39,027 | 33,360 | 17.0% | 299,840 | 250,755 | 19.6% | 37.6% | 19.3% | |
| DELTA | 22,274 | 56,036 | -60.3% | 244,313 | 605,964 | -59.7% | 30.7% | 46.6% | |
| ELITE AIRWAYS | 0 | 395 | -100.0% | 839 | 6,903 | -87.8% | 0.1% | 0.5% | |
| FRONTIER | 3,002 | 5,906 | -49.2% | 53,287 | 57,330 | -7.1% | 6.7% | 4.4% | |
| JETBLUE | 4,548 | 15,894 | -71.4% | 61,707 | 129,947 | -52.5% | 7.7% | 10.0% | |
| UNITED | 1,707 | 7,667 | -77.7% | 55,326 | 95,804 | -42.3% | 6.9% | 7.4% | |
| AMERICAN | 16,010 | 14,147 | 13.2% | 48,797 | 120,237 | -59.4% | 6.1% | 9.2% | |
| SUN COUNTRY | 0 | 0 | 0.0% | 8,076 | 0 | 100.0% | 1.0% | 0.0% | |
| MAJOR TOTAL: | 86,568 | 133,999 | -35.4% | 797,174 | 1,301,849 | -38.8% | 100.0% | 100.0% | |
| (AFFILIATE AIRLINES) | |||||||||
| GOJET - United | 0 | 0 | 0.0% | 1,057 | 8,074 | -86.9% | 0.5% | 3.2% | |
| MESA AIRLINES-United Express | 4,966 | 370 | 1242.2% | 19,094 | 370 | 5060.5% | 9.0% | 0.2% | |
| PSA AIRLINES - American | 8,589 | 8,890 | -3.4% | 90,073 | 76,702 | 17.4% | 42.3% | 30.5% | |
| REPUBLIC-American | 594 | 4,034 | -85.3% | 19,647 | 52,121 | -62.3% | 9.2% | 20.7% | |
| Republic - United | 6,791 | 4,988 | 36.1% | 33,120 | 57,076 | -42.0% | 15.6% | 22.7% | |
| SHUTTLE AMERICA-Delta | 0 | 3,262 | -100.0% | 2,906 | 3,262 | -10.9% | 1.4% | 1.3% | |
| SKY WEST - United | 2,384 | 725 | 228.8% | 13,227 | 4,409 | 200.0% | 6.2% | 1.8% | |
| SKY WEST - American | 0 | 0 | 0.0% | 0 | 11,025 | -100.0% | 0.0% | 4.4% | |
| SKY WEST - Delta | 0 | 0 | 0.0% | 0 | 16,050 | -100.0% | 0.0% | 6.4% | |
| ENDEAVOR-Delta | 0 | 76 | -100.0% | 602 | 7,994 | -92.5% | 0.3% | 3.2% | |
| ENVOY-American | 705 | 3,743 | -81.2% | 33,145 | 14,368 | 130.7% | 15.6% | 5.7% | |
| REGIONAL TOTAL: | 24,029 | 26,088 | -7.9% | 212,871 | 251,451 | -15.3% | 100.0% | 100.0% | |
| [DOMESTIC-CHTR] | |||||||||
| SUN COUNTRY | 286 | 240 | 19.2% | 1,632 | 3,028 | -46.1% | 0.8% | 100.0% | |
| SUBTOTAL: | 286 | 240 | 19.2% | 1,632 | 3,028 | -46.1% | 0.8% | 100.0% | |
| CHARTER TOTAL: | 286 | 240 | 19.2% | 1,632 | 3,028 | -46.1% | 0.2% | 0.2% | |
| GRAND TOTAL: | 110,883 | 160,327 | -30.8% | 1,011,677 | 1,556,328 | -35.0% | 100.0% | 100.0% | |
Page 69
Download HTML
2020 2019 YOY
JAN 154,675 70,390 590 225,655 JAN 100,301 46,580 559 147,440 53.0%
FEB 160,150 71,664 735 232,549 FEB 98,601 51,108 898 150,607 54.4% -22.6%
MAR 107,145 45,899 202 153,246 MAR 129,200 67,714 975 197,889 -94.7% -75.2%
APR 6,729 3,013 0 9,742 APR 138,810 42,956 1,353 183,119 -75.2% -64.2%
MAY 27,643 12,187 158 39,988 MAY 123,117 37,277 1,041 161,435 -57.6% -57.1%
JUNE 41,663 11,182 0 52,845 JUNE 118,458 28,060 1,097 147,615 -64.2% -47.2%
JULY 46,292 15,990 123 62,405 JULY 118,925 26,718 1,425 147,068 -57.6% -30.8%
AUG 41,160 16,832 123 58,115 AUG 107,588 26,704 1,175 135,467 -57.1% -100.0%
SEPT 45,702 20,293 254 66,249 SEPT 103,890 20,698 773 125,361 -47.2% -100.0%
OCT 84,861 25,736 286 110,883 OCT 125,343 34,349 635 160,327 -30.8% -48.6%
NOV 0 0 0 0 NOV 135,641 46,148 818 182,607 -100.0% -100.0%
DEC 0 0 0 0 DEC 163,222 63,921 872 228,015 -100.0% -48.6%
TOTAL: 716,020 293,186 2,471 1,011,677 TOTAL: 1,463,096 492,233 11,621 1,966,950 -48.6% -48.6%
SARASOTA BRADENTON INTERNATIONAL AIRPORT
TOTAL YOY PASSENGER COMPARISON - BY MONTH
Page 70
Download HTML
AGENDA ITEM NO. 8G
SARASOTA MANATEE AIRPORT AUTHORITY
ENGINEERING, PLANNING & FACILITIES ACTIVITY REPORT
November 17, 2020
ENGINEERING
Master Drainage Plan (MDP)/Stormwater System Improvements
The MDP evaluated the Airport's drainage system and determined a master system that would allow for 90+ acres of development, while reducing ponds and other wildlife hazards. The Stormwater System Improvements project was bid in April 2019 and a low responsive bidder was approved by the Authority. A preconstruction meeting was conducted on October 23rd and the contractor mobilized to the site in February to begin. Contractor is actively working on Phase 4 (near the Shade Lot) and is nearing completion of all phases of the project. Project is ahead of schedule, and contractor anticipates substantial completion at the end of November.
Terminal Renovation & Upgrades (Phase 7.2)
An RFQ was advertised to select an architectural and engineering firm to develop plans and specifications for upgrades and renovations to the Terminal. The upgrades and renovations will include the police department, the new Board room, 3rd floor administration offices, observation deck, and the badging offices. The Board selected Sweet Sparkman Architects. Phase 7.1 construction is nearing completion, and the scope for the second phase (includes renovation of the third floor, observation deck, glass block replacement, and other terminal upgrades) has begun. Sweet Sparkman has completed preliminary design, finishes have been selected, and 60-percent architectural drawings have been submitted. The project was suspended and is now being restarted. Final design should be completed in early CY 2021.
ARFF Station Renovations
A November 18, 2019 Notice-to-Proceed was given to the Contractor. The project is "substantial complete" and is being closed out. Contractor is working on warranty items including doors and ring down line.
SRQ Parking Lot Modifications
This project was designed to expand the Long-term Parking Lot, Shade Lot, Facilities Lot, and make modifications at the curbside for valet dropoff. Design drawings were completed and the project was bid. Bids were opened on March 6th, 2020 and Staff brought the low responsive bid to the March, 23rd Board meeting for Authority approval. A supplemental agreement was prepared to reduce the scope of work to milling and overlaying the existing parking facility, modifying the curbside for the valet dropoff, and expanding the Facilities Parking Lot. The contractor is complete with the mill and overlay of the existing parking facility, and is substantially complete with the valet and the expansion of the Facilities Parking Lot. Staff has re-advertised the expansion portion to the long-term and overflow lot due to recent increase in airline traffic. Staff anticipates bringing low-responsive bidder to the January Board meeting.
โ Fuel Farm Expansion
This project was designed to expand the existing fuel farm up to an additional 306,000 GAL. The design was completed and permit applications were submitted. The project was advertised for bidding and bids were opened on March 11, 2020. Staff brought the low responsive bidder to the March 2020 Board meeting for Authority approval. The Board has executed a contract to construct two of three storage tanks, for additional 204,000 GAL's of storage. The contractor has received County Land Development permit and the Building permit and has begun construction.
Page 71
Download HTML
โ North Quad Development Project
The North Quad Development Project will construct roadway, utilities, and earthwork for future development within the 92-acres in the north portion of the airside land. Wright Construction was the low responsive bidder for the project, and their bid was approved by the Authority Board at the November 2018 meeting. Contracts have been executed, a pre-construction meeting was conducted on March 4, and an NTP was issued for April 1, 2019. Contractor has completed site clearing, rough grading, water and sewer lines are installed, and roadway work. FPL has relocated primary power and has installed the overhead power work. Contractor has remobilized to complete the remaining power hook-ups, and is waiting for FPL to install the power meter. Staff anticipates completion in December.
โ Taxiway Bravo North Rehabilitation
The Taxiway Bravo Project will rehabilitate Taxiway Bravo north of Runway 14-32 to Runway 22. Kimley-Horn and Associates (KHA) was ranked first at the March Board meeting. KHA has completed the final design plans and the project was bid. The Board approved AJAX Paving as the low responsive bidder at the May, 2020 Board meeting. Staff has issued an NTP of September 17th for this project, and the contractor submitted their material submittals for review. Contractor has been unable to secure electrical items from their suppliers due to impacts from COVID. Project has been suspended until January 4th, 2021.
Access Control Project
The Access Control Project will replace the current access control resulting in a unified security system with fully integrated video surveillance, physical access control, and access credential media issuance capabilities. AVCON has completed design, project was advertised for construction bids, and approval of the low responsive bidder was approved at the November Board meeting. A preconstruction meeting was conducted on January 23rd and an NTP was issued February 3rd. Contractor has installed new gate controllers, installed fiber backbone, and has prepared the servers. The contractor is replacing door controllers and switching over to new system.
โข Wayfinding Sign Project
The Wayfinding Sign project will replace and upgrade the signage around Airport Circle, along with the Bradenton Connector, General Spaatz Boulevard, Rental Car Road, Air Cargo Avenue, Air Cargo Road, and Old Bradenton Road. Signs will be upgraded to include latest international symbols, and their format will be similar to the new signage recently installed in the Gateway Entrance Project. Final design drawings have been received. Project has been advertised and staff anticipates bringing the low responsible bidder to the January Board meeting.
Blast Fence Deflector Project
The Blast Deflector project will design and permit a blast fence near the ground transportation area. Michael Baker International was ranked first at the August 2019 Board meeting. Staff negotiated scope and fee and brought a contract for approval to the September 2019 board meeting. Michael Baker has completed final design plans; and the project has been advertised. Bids were opened on July 1, 2020 and eight bids were received. Project is temporarily on hold due to COVID-19.
โ Rental Car Office Renovations
An RFQ was advertised to solicit design professionals to renovate the rental car offices in the baggage wing of the Terminal. Key elements will include modifying counter to meet ADA requirements, refinishing walls, ceilings, and flooring, replacing HVAC system, signing, and installing kiosks terminals. Staff selected Sweet Sparkman at the January Board meeting, and staff negotiated a scope and fee, and brought their contract to the March Board meeting for approval. Staff conducted a design kick-off meeting with stakeholders. SSA has prepared two concepts for office layout, the Rental Car companies have selected their preference. SSA is preparing 60-percent drawings.
Page 72
Download HTML
Baggage Handling System Project
The Baggage Handling System Project will consolidate the three-existing mini-inline systems into one fully inline system. This project will allow all bag belts in ticketing to feed to one checked baggage inspection room, and will allow for redundant screening machines. VTC was ranked first at the August Board meeting and a contract has been executed for the initial phase of work. VTC has prepared and submitted an application package to seek funding from TSA.
Security Checkpoint Modifications Project
The Security Checkpoint Modifications Project will modify the layout of the existing four lanes to improve the efficiency, prepare for an additional lane, and expand space between lanes to accommodate future CT Machines. This project has been designed and construction contract has been executed. Contractor is substantially complete; and staff is working to close project out.
SRQ Restroom Renovation Project
The SRQ Restroom Renovation Project will modify the existing restrooms making each public restroom within the terminal touchless. It will also relocate the trash receptacles under the sink to eliminate water from the floors and make cleaning quicker and easier for janitorial staff. This project has been designed and advertised for informal bids. The bid opening for this project is July 1, 2020. Stellar Development was the low bid, and was approved by Board at the Special Board Meeting in July. Contractor has received permits and is waiting delivery of material. Contractor has begun on the initial phase of the work.
Whitfield Driveway Removal Project
The Whitfield Driveway Removal project removes concrete driveways remaining on SRQ property that were acquired during the Noise Abatement Project. The driveways are mainly located within the Whitfield Ballentine Neighborhood. The project has been awarded to Landmark Construction, and contractor is substantially complete.
PLANNING
Master Plan Update
The Board selected AECOM at the September Board meeting to update the Airport's Master Plan. The Consultant provided their scope for review in early December, and staff has received an Independent Fee Estimate (IFE). Staff has conducted a negotiation meeting and finalized scope/fees, and Board approved at the May Board meeting. AECOM has gathered Airport statistics and other required information, and has submitted their first of six working papers. The forecast and Airport inventory has been submitted to FAA for their approval, and AECOM has completed the Facility Requirements. AECOM is evaluated Alternatives and preparing cost estimates for various alternates. AECOM and staff have prepared initial timeline for improvements, and the financial feasibility study is underway.
โข Boundary Survey
The Board selected AID at the November Board meeting to conduct a boundary survey and update the Exhibit A for the Airport Layout Plan (ALP). Staff has conducted a negotiation meeting and finalized scope/fees, and Board approved at the May Board meeting. The contract has been executed and AID is completing title work, and has completed 95% of the field survey, and has submitted a preliminary map.
2021 FAA Pre-Application for AIP Funding
Statt has submitted a pre-application for 2021 FAA AIP funding. Staff is requesting funding for two taxiway rehabilitation projects, Taxiway Charlie and Foxtrot.
2021 FDOT JACIP
Staff will be updating the FDOT JACIP for FY 2021-2025, based upon results from the MPU.
Page 73
Download HTML
FACILITIES
PROJECTS: The Facilities Department is currently working on multiple projects and scheduled maintenance items.
o ATCT: ATCT personnel are not on-site except for controllers (usually 2). Monitoring facility for issues. The Chiller is operating. Parts on order.
o Graphics: Continuing to assist all departments and tenants with various signage projects and CAD requests. Procuring sign for rotating beacon. Create SRQ 99's banner.
o Loading Bridge: Monitoring for issues.
o Public Works: Mowing entire property. Various landscape maintenance and improvement projects in and around terminal. Maintaining Whitfield/Uplands twice a month. Honeywell trimming and mowing.
Airfield: Mowing continuing. Lighting inspections continuing. Ramp marking painting. Side lines on Alpha painting/cleaning. Installing new side panels. Install new water line across from the overflow lot, this line feeds the blue water dump site.
o Conveyor Coverage varies with flight schedule and involves minimal overtime.
o Industrial Trades: Airside NOC-Smart Row: Ordering materials so walls and doors can begin. Honeywell: Replacing fire panel is complete. Operations/Aircom: Installation of new floor is complete. T-Hangars: Performing PM's on Dolphin Hangars. Sanitary Line: Replace the sanitary lines under B-2 restrooms. Performing PM's on all AOA gates. Main Terminal Generator: Exhaust was repaired and a heat cover was installed. Replacing roof drains curb side.
Vehicle Fleet: New Facilities Sweeper Truck having issues. Wide area mower is back at Everglades. Various mower repairs. Several Fire Truck repairs.
o Parking: Replacing all Analog cameras with new cameras.
o Janitorial: Monitoring progress. Continue to meet with management to discuss checkpoint cleaning. Worked with Owens to incorporate TSA checkpoint cleaning.
TOTAL WORK ORDERS: 459
VEHICLE MAINTENANCE/EQUIPMENT REPAIR - 21 PMs, 37 work orders
SIGN/CADD -8 PMs, 18 work orders
AIRSIDE (Airfield) - 27 PMs, 11 work orders
LANDSIDE (Landscape, Equip Oper, Public Works) - 77 PMs, 14 work orders
INDUSTRIAL TRADES โ 124 PMs, 119 work orders
Page 74
Download HTML
AGENDA ITEM NO. 8H
SARASOTA MANATEE AIRPORT AUTHORITY
INTERNAL AUDIT/RECORDS RETENTION DEPARTMENT AND INVESTMENT COMPLIANCE REPORT
NOVEMBER 17, 2020 REGULAR MEETING
The following is a recap of Internal Audit Department projects and activities during October 2020:
Pandemic Response: Efforts continued toward understanding how other US airports are responding to the pandemic from a risk and financial management perspective and assisting with the response at SRQ.
Monthly Investment Activity Compliance Report: On 10/27/20, the issuer, FNMA, called away a 5-year note that had been held in the Authority's investment portfolio since original issuance on 10/27/16. The note had been purchased at a slight discount and carried a coupon of 1.50%. The funds received on the call date were deposited to the Authority's transaction account at Suntrust/Truist where these excess funds currently earn a rate of 1.90%. The rate of 1.90% is fixed until 9/30/21 and the funds can be withdrawn at any time without penalty. This activity is compliant with the Authority's Investment Policy. There were no other additions, sales, maturities or calls in the investment portfolio during October.
External Audit: Following the end of the Authority's fiscal year on September 30, preparation began for the annual independent audit scheduled to commence early December.
Disadvantaged Business Enterprise Compliance: Established parameters for new MBE program that will be applied on non-federally funded contracts to expand participation by local minority, women, and veteran-owned firms.
Miscellaneous Compliance Matters: Coordinated efforts toward Authority compliance with newly enacted Florida statute 332.0075 regarding commercial service airports.
Parking: Parking operations are reviewed and tested monthly by Internal Audit. At month-end, there were four vehicles in the airport parking lots that were being monitored for possible abandonment.
Records Requests: The Records Department received and processed 9 external/public record requests and 3 internal records requests during October.
Management of Paper Records: The Records Department received and processed 45 central file records and processed one box of inactive records to the records storage area during October. An additional 5 boxes were received, scanned, and processed electronically to the Authority's Enterprise Content Management System. The associated paper records were shredded. A total of 6 bags of obsolete, superseded, and duplicate records equaling 9.0 cubic feet were shredded per Authority directives and in accordance with Florida statutes.
Continuing Education: The department participated in numerous web-based educational sessions during the month on a variety of records management, civil rights compliance, audit, and IT security subjects.
<table><tr><td><nl></td></tr></table>
1
Page 75
Download HTML
AGENDA ITEM NO. 81
SARASOTA MANATEE AIRPORT AUTHORITY
INFORMATION TECHNOLOGY DEPARTMENT
NOVEMBER 2020
System upgrades and implementation:
Evaluation to determine redundancy and environmental needs for Network Operation Centers- Planning implementation of new server cabinets with new AC and fire suppression technologies- Airside complete. Evaluate 3rd floor NOC.
Hardware refresh of computer systems- 150+ systems upgraded. Ongoing
Security Awareness online training- Renewed/ Ongoing
Anti-phishing solution to improve email security โ monitoring
Datacenter backup solution upgrade- Scheduled for November 2020
Maintenance Connection Upgrade- Evaluate timing for Phase 2 mobility- On hold
Video wall replacement project- Install new 98" monitor- Scheduled for November 2020
Common Use:
Coordination with Amadeus on Preventive Maintenance on systems- In progress
Evaluate upgrade to PCs and MAP printers- Upgrade all the Common Use Gate PCs-Planned for January 2021
Phone System:
Evaluation of replacement of pay phones with Courtesy phones- Complete
ShoreTel phones will continue their upgrade to new Mitel phones- Ongoing
SRQ Web Page:
Ongoing updates- Home screen updates, Updated pictures, Interactive map- Scheduled for November 2020
IT Assessment
- Ongoing: Updating policies and procedure.
Training:
Network +\ MCP Certification- In progress
CCNA Certification- In progress
MCSA\MCSE Training- in progress
CJIS Training- Complete
Project Coordination:
Implemented SharePoint to replace previous SMAA Intranet- Complete
Conversion to digital record with Internal Audit- working with Purchasing and Internal Audit to evaluate potential vendors for scanning of documents including CAD files.
FOTS cabinet upgrades- identify replacement UPS/ Cooling options- In progress
FIDS Outdoor LED project- In progress
Development of App for SRQ to provide flight information to passengers, staff-scheduled for November 2020
Messaging archive update project- Ongoing
Work with Operations supporting the Parking lot camera project- in progress
Coordinate with Operations on Radar PC- PC programmed and configured- Complete
Advertising Migration to Omniexperience platform- Complete
1