FACILITIES
PROJECTS: The Facilities Department is currently working on multiple projects and scheduled maintenance items.
o ATCT: ATCT personnel are not on-site except for controllers (usually 2). Monitoring facility for issues. The Chiller is operating. Parts on order.
o Graphics: Continuing to assist all departments and tenants with various signage projects and CAD requests. Procuring sign for rotating beacon. Create SRQ 99's banner.
o Loading Bridge: Monitoring for issues.
o Public Works: Mowing entire property. Various landscape maintenance and improvement projects in and around terminal. Maintaining Whitfield/Uplands twice a month. Honeywell trimming and mowing.
Airfield: Mowing continuing. Lighting inspections continuing. Ramp marking painting. Side lines on Alpha painting/cleaning. Installing new side panels. Install new water line across from the overflow lot, this line feeds the blue water dump site.
o Conveyor Coverage varies with flight schedule and involves minimal overtime.
o Industrial Trades: Airside NOC-Smart Row: Ordering materials so walls and doors can begin. Honeywell: Replacing fire panel is complete. Operations/Aircom: Installation of new floor is complete. T-Hangars: Performing PM's on Dolphin Hangars. Sanitary Line: Replace the sanitary lines under B-2 restrooms. Performing PM's on all AOA gates. Main Terminal Generator: Exhaust was repaired and a heat cover was installed. Replacing roof drains curb side.
Vehicle Fleet: New Facilities Sweeper Truck having issues. Wide area mower is back at Everglades. Various mower repairs. Several Fire Truck repairs.
o Parking: Replacing all Analog cameras with new cameras.
o Janitorial: Monitoring progress. Continue to meet with management to discuss checkpoint cleaning. Worked with Owens to incorporate TSA checkpoint cleaning.
TOTAL WORK ORDERS: 459
VEHICLE MAINTENANCE/EQUIPMENT REPAIR - 21 PMs, 37 work orders
SIGN/CADD -8 PMs, 18 work orders
AIRSIDE (Airfield) - 27 PMs, 11 work orders
LANDSIDE (Landscape, Equip Oper, Public Works) - 77 PMs, 14 work orders
INDUSTRIAL TRADES – 124 PMs, 119 work orders