← B22401-L7to12-TIA-011425.pdf

Rebuilt HTML — PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay · view JSON

Kevin P. McDonough (1953-1994) John H. Rea, P.E. Jay S. Troutman, Jr., P.E. Scott T. Kennel
519 854-1
McDonough & Rea Associates, Inc.
Traffic and Transportation Consulting
January 14, 2025
Jackson Township Planning Board 95 West Veterans Highway Jackson, New Jersey 08527
Re: Atlantic Construction Site Lots 7-12 in Block 22401 Jackson Township, Ocean County MRA File No. 21-155
Dear Board Members:
McDonough & Rea Associates (MRA) has been asked to provide the Planning Board with a Traffic Impact Analysis for plans prepared by YP Engineering (YPE) for development of a construction yard and office space on the noted property. The property is located on the west side of Whitesville Road (CR 527) north of Faraday Avenue as shown on Figure 1, a Site Location Map, in the Appendix. Plans prepared by YPE show separate driveways proposed for the construction yard and the office space, thereby separating construction yard traffic from office traffic.
SCOPE OF STUDY
In order to prepare a thorough Traffic Impact Analysis for this project, MRA conducted the following tasks:
Made field visits to the site to establish existing roadway and traffic conditions in the area.
Conducted peak hour traffic counts at the intersection of Whitesville Road/White Road during the critical morning and afternoon peak hours.
Prepared estimates of traffic to be generated by the construction yard and office building based upon Institute of Transportation Engineers (ITE) data and communication with the Applicant with respect to operations at the construction yard.
Prepared estimates of future traffic volume demand for a design year of 2035, in accordance with Ocean County Planning Board protocol.
Please reply to:
McDonough & Rea Associates, Inc.
Traffic and Transportation Consulting 1431 Lakewood Road, Suite C, Manesquan, NJ 08736 • (732) 528-7076 • Fax (732) 528-6673 105 Elm Street, Lower Level, Westfield, NJ 07090 • (908) 789-7180 • Fax (908) 789-7181
Jackson Township Planning Board
-2-
January 14, 2025
Conducted level of service capacity analyses for the site driveways to Whitesville Road for the 2031 design year.
Reviewed the Site Plan with respect to availability and accessibility of the parking supply and conformance to proper traffic engineering principles.
The following report sets forth the database accumulated and the conclusions reached with respect to the Atlantic Construction site.
EXISTING CONDITIONS/TRAFFIC VOLUMES
Whitesville Road is a Ocean County roadway (CR 527) generally running in a north/south direction in the vicinity of this site. It provides for 1 travel lane in each direction along with shoulders on both sides of the road.
Traffic volume data was collected by conducting manual turning movement counts at the intersection of Whitesville Road/White Road in November 2023. The traffic counts were conducted from 7:00 AM to 10:00 AM and 3:00 PM to 6:00 PM with the peak hours recorded from 8:45 AM to 9:45 AM and 4:15 PM to 5:15 PM. Table I illustrates base AM peak street hour and PM peak street hour traffic volumes passing the subject property.
TABLEI
2023 EXISTING BASE TRAFFIC VOLUMES
DIRECTIONAMPSHPM PSH
Northbound711586
Southbound753691
TRIP GENERATION/DISTRIBUTION
Estimates of traffic to be generated by the construction yard and the 15,000 SF of office space were made after consulting with the Applicant with respect to the anticipated operation of the construction yard and by reviewing data published by the ITE in the 11^{th} Edition of the Trip Generation Manual.
With respect to the operation of the construction yard, the Applicant has provided the following information:
McDonough & Rea Associates, Inc.
Traffic and Transportation Consulting 1431 Lakewood Road, Suite C, Manasquan, NJ 08736 • (732) 528-7076 • Fax (732) 528-6673 105 Elm Street, Lower Level, Westfield, NJ 07090 • (908) 789-7180 • Fax (908) 789-7181
Jackson Township Planning Board
-3
January 14, 2025
On a typical day, approximately 15 employees arrive at the site between 7:00 AM and 7:30 AM and return at 4:00 PM to 4:30 PM.
Some employees arrive at the site to pick up a company vehicle and then go to a job site and some take company vehicles home and go directly to the job site.
➢ Approximately 2 pieces of construction equipment are moved onto and off the site daily.
Based on the foregoing, MRA assumed a worst-case scenario; one in which 15 employees arrive at the site and 15 employees depart from the site during both the AM peak street hour and PM peak street hour, even though some of the employees may take a construction vehicle home and may not enter or exit the site during these time frames.
With respect to the 15,000 SF of office space, the 11th Edition of the ITE Trip Generation Manual was utilized for trip generation purpose. Table II illustrates the anticipated traffic generation for the office space and construction yard based upon these parameters.
TABLE II
TRIP GENERATION
AM PSHPM PSH
USEINOUTTOTALINOUTTOTAL
15,000 SF Office Space2232532124
Construction Yard151530151530
Total371855183654
Site generated traffic was distributed north and south along Whitesville Road 50 percent to and from the north and 50 percent to and from the south based on the relatively equal traffic volumes traveling along the corridor during peak hours.
ANALYSIS OF FUTURE TRAFFIC
A design year of 2035 was assumed in accordance with Ocean County Planning Board protocol. Design year 2035 traffic volumes were prepared after consulting the New Jersey Department of Transportation's (NJDOT) background traffic growth rate data for the area. Existing base 2023 traffic volumes were expanded by 2.0 percent per year for 3 years and then 0.5 percent per year for 9 years to establish 2035 no-build traffic volumes. Site generated and distributed traffic was then surcharged onto no-build volumes and are shown on Table III.
McDonough & Rea Associates, Inc.
Traffic and Transportation Consulting 1431 Lakewood Road, Suite C, Manasquan, NJ 08736 • (732) 528-7076 • Fax (732) 528-6673 105 Elm Street, Lower Level, Westfield, NJ 07090 • (908) 789-7180 • Fax (908) 789-7181
Jackson Township Planning Board
-4-
January 14, 2025
TABLE III DESIGN YEAR 2035 BUILD TRAFFIC VOLUMES WHITESVILLE ROAD AND SITE ACCESS
ROADWAYAPPROACHMOVEMENTAM PSHPM PSH
Whitesville RoadNorthboundLeft189
Thru786648
SouthboundThru830770
Right199
Site AccessEastboundLeft918
Right918
Traffic engineers calculate levels of service of unsignalized intersections which relate to the quality of traffic flow. Level of service is a measure of average control delay. Average control delay is the time lost due to deceleration and the amount of time from when a vehicle is stopped for a traffic control device (or at the end of the queue) to when the vehicle departs the intersection. Delay is a relative quantity of driver discomfort, frustration, fuel consumption, and loss in travel time.
Levels of service range from "A" to "F" with "A" being the highest or best attainable level of service. Level of service "E" with average control delays of not more than 50 seconds per vehicle at an unsignalized intersection indicates near to or at capacity conditions and is generally considered the limit of acceptable level of service and delay.
Full definitions of levels of service for unsignalized intersections as well as level of service summaries are included in the Appendix. The intersections studied by this report were analyzed according to the procedures set forth in the Highway Capacity Manual 2022, using the McTrans Highway Capacity Software (HCS 2024).
As previously indicated, separate driveways will be provided for the construction yard and the office space. The following represents our analysis:
Site Access to Whitesville Road
At the site access to Whitesville Road, findings were that exiting traffic to Whitesville Road will do so at level of service “D” during the AM peak street hour and level of service “D” during the PM peak street hour. The northbound left turn ingress movement is projected to operate at level of service “B” or better for the peak hours analyzed. Therefore, the driveway will operate within acceptable traffic engineering parameters.
McDonough & Rea Associates, Inc.
Traffic and Transportation Consulting 1431 Lakewood Road, Suite C, Manasquan, NJ 08736 • (732) 528-7076 • Fax (732) 528-6673 105 Elm Street, Lower Level, Westfield, NJ 07090 • (908) 789-7180 • Fax (908) 789-7181
Jackson Township Planning Board
-5
January 14, 2025
SITE PLAN AND PARKING
A single driveway is provided for the construction yard and the office building. With respect to the construction yard, areas are provided on site for equipment parking, construction vehicle parking and storage of materials. A 30-foot-wide asphalt driveway serves as access to both buildings and to the gravel storage areas for vehicles, equipment and materials.
With respect to the office space, 116 parking spaces are provided with 4 EV parking spaces and full access is provided around the building. The parking meets and exceeds Jackson Township ordinance requirements.
CONCLUSIONS
It is concluded, based on the analysis set forth in this report, that plans to construct a driveway to a construction yard and to construct a 15,000 SF office building on the noted property can be approved and operate compatibility with future traffic conditions. Exiting traffic from the 2 uses to Whitesville Road will do so at acceptable levels of service for the 2035 design year.
The Site Plan, prepared by YPE, shows adequate areas for parking and storage of vehicles, equipment and materials for the construction yard and adequate parking for the office building.
A representative from MRA will be in attendance at an upcoming Jackson Township Planning Board meeting to provide expert testimony and answer any questions Board members, Board experts or the public may have. Very truly yours,
Very truly yours,
John H. Rea, PE
principal
Enclosures
cc: Shlomo Horowitz Yosef Portnoy, PE Esther Bakst
Scott T. Kennel Sr. Associate
Date last inventoried: November 2012
SRI = 00000527
Page Created: June, 2020
ROUTE 527 (South to North)
Mile Posts:8.000-11.000
Whitesville Road (CR 527) White Road Whitesville Road (CR 527)
Southbound Westbound Northbound
Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total Int. Total
Peak Hour From 07:00 AM to 09:30 AM - Peak 1 of 1
Intersection Volume 08:45 AM 43 571 614 182 29 211 582 129 711
Percent 7.0 93.0 86.3 13.7 81.9 18.1
09:00 Volume Peak Factor 15 173 188 60 6 66 145 45 190 444
High Int. Volume Peak Factor 09:00 AM 15 173 09:00 AM 60 6 66 145 45 190
WHITESVILLE BUSINESS PARK WHITESVILLE ROAD & WHITE ROAD JACKSON TOWNSHIP, OCEAN COUNTY MRA JOB 21-123 WEDNESDAY AM COUNT
Whitesville Road (CR 527)White RoadWhitesville Road (CR 527)
SouthboundWestboundNorthbound
Start TimeLeftThruApp. TotalLeftRightApp. TotalThruRightApp. TotalInt. Total
07:00 AM279815271185123211
07:15 AM391944371243127228
07:30 AM68894143171309139250
07:45 AM698104224261198127257
Total1735637345125749125516946
08:00 AM3909312102212913142257
08:15 AM7657214112512310133230
08:30 AM8114122941312518143278
08:45 AM171531702883614129170376
Total35422457633396518705881141
09:00 AM151731886066614545190444
09:15 AM91321414855314420164358
09:30 AM211311546105615235187358
Grand Total781196127426266328145019516453247
Approx %6.193.979.920.188.111.9
Total %2.436.839.28.12.010.144.76.050.7
Groups Printed-CARS - TRUCKS - SCHOOL BUS
McDonough & Rea Associates 1431 Lakewood Road Suite C Manasquan NJ 08736 (732) 528-7076
File Name : 21123 whitesville & white am1
Page No :1
Start Date : 11/1/2023
Site Code : 00023272
Start Time Whitesville Road (CR 527) White Road Whitesville Road (CR 527) Int. Total
Southbound Westbound Northbound
Left Thru App. Total Left Right App. Total Thru Right App. Total
Peak Hour From 03:30 PM to 05:45 PM - Peak 1 of 1
Intersection 04:15 PM
Volume 16 603 619 88 40 128 522 64 586 1333
Percent 2.6 97.4 157 68.8 31.3 29 89.1 10.9
05:00 Volume 2 155 157 18 11 149 12 161 347
Peak Factor 0.960
High Int. 04:45 PM 04:15 PM 05:00 PM
Volume 8 165 173 31 14 45 149 12 161
Peak Factor 0.895 0.711 0.910
WHITESVILLE BUSINESS PARK WHITESVILLE ROAD & WHITE ROAD JACKSON TOWNSHIP, OCEAN COUNTY MRA JOB 21-123 WEDNESDAY PM COUNT
Whitesville Road (CR 527) White Road Whitesville Road (CR 527)
Southbound Westbound Northbound
Start Time Left Thru App. Total Left Right App. Total Thru Right App. Total Int. Total
03:30 PM 12 102 114 12 7 19 108 27 135 268
03:45 PM 11 114 125 43 3 46 95 22 117 288
Total 23 216 239 55 10 65 203 49 252 556
04:00 PM 5 128 133 30 5 35 123 23 146 314
04:15 PM 2 118 120 31 14 45 131 25 156 321
04:30 PM 4 165 169 12 7 19 126 13 139 327
04:45 PM 8 165 173 27 8 35 116 14 130 338
Total 19 576 595 100 34 134 496 75 571 1300
05:00 PM 2 155 157 18 11 29 149 12 161 347
05:15 PM 1 127 128 9 2 11 114 10 124 263
05:30 PM 8 128 136 10 8 18 109 4 113 267
05:45 PM 10 124 134 15 8 23 118 11 129 286
Total 21 534 555 52 29 81 490 37 527 1163
Grand Total 63 1326 1389 207 73 280 1189 161 1350 3019
Apprch % 4.5 95.5 73.9 26.1 88.1 11.9
Total % 2.1 43.9 46.0 6.9 2.4 9.3 39.4 5.3 44.7
Groups Printed-CARS - TRUCKS - SCHOOL BUS
McDonough & Rea Associates 1431 Lakewood Road Suite C Manasquan NJ 08736 (732) 528-7076
File Name : 21123 whitesville & white pm1
Page No :1
Start Date : 11/1/2023
Site Code : 00021123
LEVEL OF SERVICE CRITERIA FOR TWO-WAY STOP-CONTROLLED INTERSECTIONS1
Level of ServiceAverage Control Delay
A≤ 10.0 Seconds Per Vehicle
B> 10.0 and ≤ 15.0 Seconds Per Vehicle
C> 15.0 and ≤ 25.0 Seconds Per Vehicle
D> 25.0 and ≤ 35.0 Seconds Per Vehicle
E> 35.0 and ≤ 50.0 Seconds Per Vehicle
F> 50.0 Seconds Per Vehicle
1 Transportation Research Board, Highway Capacity Manual 2022, National Research Council, Washington, DC, 2022.
HCS Two-Way Stop-Control Report
General InformationSite Information
AnalystSTKIntersectionCR 527 & SITE ACCESS
Agency/SOSMBAJunctionSize
Date Performed1/13/25East/West StreetSITE ACCESS
Analysis Year2005North/South StreetSize
Time AnalyzedAMPeak Hour Factor0.95
Interpreted OrientationNorth/SouthAnalysis Time Period (h)0.95
Project Description21-155AFB-1 BUILD
Lanes
Image
Vehicle Volumes and Adjustments
ApproachEastboundWestboundNorthboundSouthbound
MoveriesUUUUR
Priority1011127891U1234U45
Number of Lanes00000000000
ConfigurationLRLTTR
Volume (veh/D)991B7B83019
Percent Heavy Vehicles (%)333
Proportion Time Blocked
Percent Grade (%)0
Right turn Channelized
Median Type | StorageUndivided
Critical and Follow-up Headways
Base Critical Headway (sec)7.16.24.1
Critical Headway (sec)16.46.32.1
Base Follow-Up Headway (sec)3.53.32.2
Follow-Up Headway (sec)3.533.332.2
Delay, Queue Length, and Level of Service
Flow Rate, v (veh/h)1919
Capacity (veh/h)121.55
v/c Ratio0.130.03
95% Queue Length, Qs (veh/h)0.40.1
95% Queue Length, Q95 (ft)10.22.6
Control Delay (s/ve)3.29.90.2
Level of Service (LOS)DAA
Approach Delay (s/ve)
Approach LOSD0.7
Copyright © 2025 University of Florida. All Rights Reserved. HCSTM TWSC Version 2024Generated: 1/13/2025 5:24:07 PM
HCS™ TWSC Version 2024 21-155AFB-1.xtw
HCS Two-Way Stop-Control Report
General InformationSite Information
AnalystSTKIntersectionCR 527 & SITE ACCESS
Agency/G&IMRAIntersection
Date Performed1/13/25East/West StreetSITE ACCESS
Analysis Year2035North/South StreetCR 527
Time AnalyzedPMPeak Hour Factor0.95
Intersection OrientationNorth SouthAnalysis Time Period (hrs)0.25
Project Description21-155PFB-1 BUILD
Lanes
Image
Vehicle Volumes and Adjustments
ApproachEastboundWestboundNorthboundSouthbound
MovementULTRULTRULTRULT
Priority1011127891U1234U45
Number of Lanes0100000010001
ConfigurationLRLT
Volume (veh/h)18189648770
Percent Heavy Vehides (%)101010
Proportion Time Blocked
Percent Grade (%)0
Right Turn Channelized
Median Type | StorageUndivided
Critical and Follow-up Headways
Base Critical Headway (sec)7.16.24.1
Critical Headway (sec)6.506.504.20
Base Follow-Up Headway (sec)3.53.32.2
Follow-Up Headway (sec)3.593.992.29
Delay, Queue Length, and Level of Service
Flow Rate, v (veh/h)389
Capacity, z (veh/h)184774
v/c Ratio0.210.01
95% Queue Length, Q95 (veh)0.70.0
95% Queue Length, Q95 (ft)18.90.0
Control Delay (s/veh)29.59.70.2
Level of Service (LOS)DAA
Approach Delay (s/veh)29.50.3
Approach LOSDA
Generated: 1/13/2025 5:26:22 PM
Copyright © 2025 University of Florida. All Rights Reserved.
HCS™ TWSC Version 2024 21-155PFB-1.xtw