| HCS Two-Way Stop-Control Report |
| General Information | Site Information |
| Analyst | STK | Intersection | CR 527 & SITE ACCESS |
|---|
| Agency/G&I | MRA | Intersection | |
|---|
| Date Performed | 1/13/25 | East/West Street | SITE ACCESS |
|---|
| Analysis Year | 2035 | North/South Street | CR 527 |
|---|
| Time Analyzed | PM | Peak Hour Factor | 0.95 |
|---|
| Intersection Orientation | North South | Analysis Time Period (hrs) | 0.25 |
|---|
| Project Description | 21-155PFB-1 BUILD |
|---|
| Lanes |
 |
| Vehicle Volumes and Adjustments |
| Approach | Eastbound | Westbound | Northbound | Southbound |
|---|
| Movement | U | L | T | R | U | L | T | R | U | L | T | R | U | L | T |
|---|
| Priority | | 10 | 11 | 12 | | 7 | 8 | 9 | 1U | 1 | 2 | 3 | 4U | 4 | 5 |
|---|
| Number of Lanes | | 0 | 1 | 0 | | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 1 |
|---|
| Configuration | | | LR | | | | | | | LT | | | | | |
|---|
| Volume (veh/h) | | 18 | | 18 | | | | | | 9 | 648 | | | | 770 |
|---|
| Percent Heavy Vehides (%) | | 10 | | 10 | | | | | | 10 | | | | | |
|---|
| Proportion Time Blocked | | | | | | | | | | | | | | | |
|---|
| Percent Grade (%) | | 0 | | | | | | | | | | | |
|---|
| Right Turn Channelized | | | | | | | | | | | | |
|---|
| Median Type | Storage | Undivided |
| Critical and Follow-up Headways |
| Base Critical Headway (sec) | | 7.1 | | 6.2 | | | | | | 4.1 | | | | | |
|---|
| Critical Headway (sec) | | 6.50 | | 6.50 | | | | | | 4.20 | | | | | |
|---|
| Base Follow-Up Headway (sec) | | 3.5 | | 3.3 | | | | | | 2.2 | | | | | |
|---|
| Follow-Up Headway (sec) | | 3.59 | | 3.99 | | | | | | 2.29 | | | | | |
|---|
| Delay, Queue Length, and Level of Service |
| Flow Rate, v (veh/h) | | | 38 | | | | | | | 9 | | | | | |
|---|
| Capacity, z (veh/h) | | | 184 | | | | | | | 774 | | | | | |
|---|
| v/c Ratio | | | 0.21 | | | | | | | 0.01 | | | | | |
|---|
| 95% Queue Length, Q95 (veh) | | | 0.7 | | | | | | | 0.0 | | | | | |
|---|
| 95% Queue Length, Q95 (ft) | | | 18.9 | | | | | | | 0.0 | | | | | |
|---|
| Control Delay (s/veh) | | | 29.5 | | | | | | | 9.7 | 0.2 | | | | |
|---|
| Level of Service (LOS) | | | D | | | | | | | A | A | | | | |
|---|
| Approach Delay (s/veh) | | 29.5 | | | | | | 0.3 | | | |
|---|
| Approach LOS | D | | | | | A | | | | |
|---|