Improvements to Hickory Tree Road were recommended in the 2019 Balch Springs Mobility Plan and 2036 Comprehensive Plan.
Project Background (cont.)
Hickory Tree Road Planning Study
Funding partners include NCTCOG, County, TxDOT, and City of Balch Springs
• Anticipated FY 22-25: Engineering, Right of Way, Utilities, & Construction
$13.5M Total: $8.2M Federal / $5.3M Local (County) / 260K Regional Transportation Development Credits
April 2021: RTC approved COVID Round 4 funding award for Phase 1 Hickory Tree Road construction: Elam Road to Lake June Road
Elam Road to Bruton Road
staff to develop context-sensitive corridor plan facilitating economic growth
Page 3
Download HTML
Corridor length: 2.03 miles
Project Limits: Hickory Tree Road, from Bruton Rd to Elam Road
Planning Project Limits
Hickory Tree Road Planning Study
Facilitate economic opportunity along the study corridor
Connect key amenities and services along the study corridor
Schools, Parks, Municipal Buildings, Commercial Areas
Increase comfort
Increase safety for bicyclists and pedestrians
Enhance bicycle/pedestrian experience along the study corridor
it and meet the needs of the community
3
Page 4
Download HTML
Opportunities exist to strengthen pedestrian connections for students to surrounding neighborhoods
Dismissals cause heavy congestion on Hickory Tree Road at the schools
NCTCOG, City of Balch Springs, City of Mesquite (McWhorter Only)
McWhorter Elementary and Floyd Elementary
Dismissal Observations: 5/2021
Evidence of walking was strong even with limited infrastructure, driver safety was a concern
NCTCOG & City of Balch Springs
Walk Audit: 12/3/2020
Site Visits
Hickory Tree Road Planning Study
Pre-recorded presentation, questionnaire about preliminary recommendations and planning project work to date
Virtual Open House: September 2021-November 2021
Residents, Business Owners, Technical Stakeholders
Virtual Stakeholder Meetings: June 2021
Respondents reported low rates of walking or biking, but high desire with safer conditions. Congestion, driveway exits were points of concern.
Travel modes, safety concerns, future visions for corridor
4
Page 5
Download HTML
Bicycle/pedestrian safety and improvements
Queuing for pick up/drop-off at schools
Congestion management
Major Considerations:
Future traffic volumes
Improve safety for bicycle/pedestrian
Improve congestion
Why:
Three-lane roadway with center turn lane and pedestrian refuge islands at key crossing locations
NCTCOG's Cross-Section Recommendation
Hickory Tree Road Planning Study
- Maintain access to driveways for homes and businesses, reduce queueing behind drivers waiting for left turns
Access Management
• Hickory Tree Road is a parallel route to I-635 and used to avoid difficult nearby intersections
Pass-Through Traffic
• Strong desire to walk and bike but limited infrastructure
Bicycle and Pedestrian Safety
Many located in the right-of-way that would need to be relocated
5
Page 6
Download HTML
• Priority placement locations at schools, parks, etc.
7 6' Edwsk 2½'
• Pedestrian Refuge Islands
Maximizes access to businesses
Vehicles waiting to turn left no longer cause back-ups
Pedestrian Refuge Island: Image Courtesy of Dan Burden
• Allows for left and right driveway exits
Center Turn Lane:
Note: exact placement of spot-based recommendations will be explored during the design phase of the project.
Recommendations
Center Turn Lane: Imagery Courtesy of Google
Recommended Cross-Section:
3-Lane Cross-Section with
Added Ped Refuges:
70' ROW
Hickory Tree Road Planning Study
Current Cross-Section:
2-Lanes with limited
Bike/Ped Amenities:
60' ROW
12' Multi-Use Path for
bikes and pedestrians +
buffer space from
roadway
Maintain travel lane
widths and add
pedestrian refuge
island/center turn lane
6' Sidewalk for
pedestrians and
buffer space from
roadway
6
Page 7
Download HTML
Any other areas with safety concerns
Parks
Schools
Possible locations include:
Once pedestrian crosses, road returns to normal conditions
Beacon activates to temporarily halt traffic to allow pedestrians to safely cross
Pedestrian Hybrid Beacon
Recommendations (cont.)
Additional lighting
Vehicle stop lines
Crosswalk warning signs
High visibility crosswalk paint
Concepts for all mid-block crosswalks:
Improve visibility of crosswalks in all weather and lighting conditions
Crossing Safety Enhancements
Crossing Safety Enhancements: Photo Courtesy of Dan Sundstrom
Shared-use path: >10', shared by bikes and pedestrians
Sidewalks: 5-6', meant for pedestrians
Shared-use Path: Photo Courtesy of Fort Worth
7
Page 8
Download HTML
Erin Curry
Transportation Planner
ECurry@nctcog.org
Shawn Conrad
Principal Transportation
Planner
SConrad@nctcog.org
Chris Dyser
Community Development
Department Director
CDyser@cityofbalchsprings.com
Karla Windsor, AICP
Senior Program Manager
KWeaver@nctcog.org
CONTACT US
16
William Freeman
Public Works Director
WFreeman@cityofbalchsprings.com
<table><tr><td><img src="imgs/img_in_image_box_0_43_789_166.jpg" alt="Image"" /></td></tr></table>
8