• Priority placement locations at schools, parks, etc.
7 6' Edwsk 2½'
Maximizes access to businesses
Vehicles waiting to turn left no longer cause back-ups
• Allows for left and right driveway exits
Note: exact placement of spot-based recommendations will be explored during the design phase of the project.
Recommended Cross-Section:
3-Lane Cross-Section with
Added Ped Refuges:
70' ROW
Hickory Tree Road Planning Study
Current Cross-Section:
2-Lanes with limited
Bike/Ped Amenities:
60' ROW
12' Multi-Use Path for
bikes and pedestrians +
buffer space from
roadway
Maintain travel lane
widths and add
pedestrian refuge
island/center turn lane
6' Sidewalk for
pedestrians and
buffer space from
roadway
6