← 1223.pdf_v_d08132026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

Alt US 19 (SR 595) Resurfacing from south of the Pinellas County Line to US 19 449166-1-52-01

Project Details
Work TypeResurfacing
PhaseDesign
LimitsAlt US 19 (SR 595) from south of the Pinellas County Line to US 19
Length0.87 miles
CityHoliday Tarpon Springs
CountyPasco Pinellas
RoadAlt US 19 SR 595

About

The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of Alternate US 19 (SR 595) in Pinellas and Pasco counties.

Construction is currently anticipated to begin in winter of 2027.

Contact Information

Design Manager

Michael MacKinnon

813-975-6431

Michael.Mackinnon@dot.state.fl.u

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us