← 1223.pdf_v_d08132026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
Alt US 19 (SR 595) Resurfacing from south of the Pinellas County Line to US 19 449166-1-52-01
Project Details
Work TypeResurfacing
PhaseDesign
LimitsAlt US 19 (SR 595) from south of the Pinellas County Line to US 19
Length0.87 miles
CityHoliday Tarpon Springs
CountyPasco Pinellas
RoadAlt US 19 SR 595
About
The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of Alternate US 19 (SR 595) in Pinellas and Pasco counties.
Construction is currently anticipated to begin in winter of 2027.
Contact Information
Design Manager
Michael MacKinnon
813-975-6431
Michael.Mackinnon@dot.state.fl.u
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us