| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | Alt US 19 (SR 595) from south of the Pinellas County Line to US 19 |
| Length | 0.87 miles |
| City | Holiday Tarpon Springs |
| County | Pasco Pinellas |
| Road | Alt US 19 SR 595 |
The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of Alternate US 19 (SR 595) in Pinellas and Pasco counties.
Construction is currently anticipated to begin in winter of 2027.
Contact Information
Design Manager
Michael MacKinnon
813-975-6431
Michael.Mackinnon@dot.state.fl.u
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us