Tampa Bay
Florida Department of Transportation
SR 582 (Fowler Avenue) Repaving from US 41 (Nebraska Avenue) to 50th Street
445652-1-52-01
| Project Details | |
| Work Type | Repaving |
|---|---|
| Phase | Construction |
| Limits | Bruce B Downs Blvd to 50th Street |
| Project Start | Late 2026 |
| City | Temple Terrace |
| County | Hillsborough |
| Road | Fowler Avenue |
| Construction Cost | $10.3 million |
| Estimated Completion | Fall 2027 |
| Contractor | Preferred Materials, Inc |
This project is repaving SR 582 (Fowler Avenue) from US 41 (Nebraska Avenue) to 50th Street in Temple Terrace (Tampa), Hillsborough County.
Other improvements include:
Contact Information
Project Information
Maricelle Venegas 813-975-6204
Maricelle.Venegas@dot.state.fl.us
About
installing two midblock pedestrian crossings with signals at 14th Street and 17th Street
adding wide bike lane enhancements
constructing a new wide sidewalk
adding a 14-ft. wide paved emergency access connection from the FDOT District 7 Headquarters (McKinley Drive to 46th Street)
Construction activities are expected to begin late 2026.
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 445652-1-52-01)
Last Updated: 10/23/2026