← 1228.pdf_v_d10232026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

SR 582 (Fowler Avenue) Repaving from US 41 (Nebraska Avenue) to 50th Street 445652-1-52-01

Project Details
Work TypeRepaving
PhaseConstruction
LimitsBruce B Downs Blvd to 50th Street
Project StartLate 2026
CityTemple Terrace
CountyHillsborough
RoadFowler Avenue
Construction Cost$10.3 million
Estimated CompletionFall 2027
ContractorPreferred Materials, Inc

This project is repaving SR 582 (Fowler Avenue) from US 41 (Nebraska Avenue) to 50th Street in Temple Terrace (Tampa), Hillsborough County.

Other improvements include:

Contact Information

Project Information

Maricelle Venegas 813-975-6204

Maricelle.Venegas@dot.state.fl.us

About

  • installing two midblock pedestrian crossings with signals at 14th Street and 17th Street
  • adding wide bike lane enhancements
  • constructing a new wide sidewalk
  • adding a 14-ft. wide paved emergency access connection from the FDOT District 7 Headquarters (McKinley Drive to 46th Street)

Construction activities are expected to begin late 2026.

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us

For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 445652-1-52-01) Last Updated: 10/23/2026