← 607.pdf_v_d08142026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

CR 52/Meridian Avenue/21st Street/Suwanee Way/St. Joe Road Intersection Improvements 439832-5-52-01

Project Details
Work TypeIntersectionImprovement
PhaseDesign
LimitsAt the intersection of CR 52/Meridian Avenue/21st Street/Suwanee Way/St. Joe Road
Length0.162 miles
CityDade City
CountyPasco
RoadCR 52Meridian Avenue

Contact Information

Design Manager Charlie Xie, P.E. 813-975-6287 Charlie.Xie@dot.state.fl.us

Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us

About

This project will replace the existing T-intersection at CR 52/Meridian Avenue/21st Street with a four-legged signalized intersection at CR 52/Meridian Avenue/21st Street/Suwanee Way/St. Joe Road in Pasco County. The project is currently being designed. Construction is anticipated to begin in 2027.