| Project Details | |
| Work Type | IntersectionImprovement |
|---|---|
| Phase | Design |
| Limits | At the intersection of CR 52/Meridian Avenue/21st Street/Suwanee Way/St. Joe Road |
| Length | 0.162 miles |
| City | Dade City |
| County | Pasco |
| Road | CR 52Meridian Avenue |
Contact Information
Design Manager Charlie Xie, P.E. 813-975-6287 Charlie.Xie@dot.state.fl.us
Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
This project will replace the existing T-intersection at CR 52/Meridian Avenue/21st Street with a four-legged signalized intersection at CR 52/Meridian Avenue/21st Street/Suwanee Way/St. Joe Road in Pasco County. The project is currently being designed. Construction is anticipated to begin in 2027.