← SARASOTA-COUNTY-DTWP-FY-26-30.pdf_sa_U_ved_2ahUKEwj6qKizjeyXAxXPAIAAHXinLWAQFnoECAUQAQ_usg_AOvVaw1w2QCvLf9UKviSHI316T7U_fexp_122108196,122108195.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

SARASOTA COUNTY

201277-5 - I-75 (SR 93) AT BEE RIDGE ROAD

Type of Work: INTERCHANGE - ADD LANES

PhaseFund Code20262027202820292030
Preliminary EngineeringLF$280,000
Right of WayBNIR$4,899,996
EnvironmentalACNP$200,000
Total for Project 201277-5$4,899,996$280,000$200,000

201277-8 - I-75 (SR 93) AT CLARK RD (SR 72) INTERCHANGE

Type of Work: LANDSCAPING

PhaseFund Code20262027202820292030
ConstructionDDR$1,695,146
DIH$10,300
Total for Project 201277-8$1,705,446
PhaseFund Code20262027202820292030
PD & EACNP$2,501,000
Total for Project 201277-9$2,501,000

Phase Fund Code 2026 2027 2028 2029 2030

Operations DDR $545,139 $83,413

DITS $181,333 $755,350

Total for Project 412676-1 $726,472 $755,350 $83,413

PhaseFund Code20262027202820292030
OperationsDDR$23,468$24,554$25,707
Total for Project 413657-1$23,468$24,554$25,707
PhaseFund Code20262027202820292030
OperationsDDR$72,143$75,480$79,019
Total for Project 413658-1$72,143$75,480$79,019

201277-9 - I-75 AT SR 681 INTERCHANGE IMPROVEMENTS

Type of Work: PD&E/EMO STUDY

412676-1 - SARASOTA COUNTY TSMCA

Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM

413657-1 - TOWN OF LONGBOAT KEY TSMCA

Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM

413658-1 - CITY OF NORTH PORT TSMCA

Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM

SARASOTA COUNTY

413659-1 - CITY OF SARASOTA TSMCA

Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM

PhaseFund Code20262027202820292030
OperationsDDR$281,868$33,900
DITS$294,836
Total for Project 413659-1$281,868$294,836$33,900
PhaseFund Code20262027202820292030
OperationsDDR$63,734$66,248$68,905
Total for Project 413660-1$63,734$66,248$68,905
PhaseFund Code20262027202820292030
EnvironmentalDDR$30,252
Design BuildDIH$5,310
Total for Project 420613-2$30,252$5,310

413660-1 - CITY OF VENICE TSMCA

Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM

420613-2 - I-75 (SR 93) AT FRUITVILLE ROAD/CR 780

Type of Work: INTERCHANGE - ADD LANES

436680-2 - SR 789 (RINGLING) FROM BIRD KEY DRIVE TO SARASOTA HARBOR WEST

Type of Work: BRIDGE REPLACEMENT

PhaseFund Code20262027202820292030
ConstructionACBR$66,866,262
Total for Project 436680-2$66,866,262
PhaseFund Code20262027202820292030
Preliminary EngineeringACSU$2,301,000
Total for Project 444634-2$2,301,000
PhaseFund Code20262027202820292030
RepaymentDDR$12,972,437$7,667,050
Total for Project 445059-1$12,972,437$7,667,050

444634-2 - SR 72 FROM EAST OF I-75 TO EAST OF IBIS

Type of Work: ADD LANES & RECONSTRUCT

445059-1 - RIVER RD FROM US 41 TO I-75

Type of Work: ADD LANES & RECONSTRUCT

SARASOTA COUNTY

445409-2 - SR 45 (US 41) SB OVER SOUTH CREEK BRIDGE REPLACEMENT BRIDGE # 170014
Type of Work: BRIDGE REPLACEMENT
PhaseFund Code20262027202820292030
Preliminary EngineeringACBR$780,000
Total for Project 445409-2$780,000
PhaseFund Code20262027202820292030
ConstructionCIGP$500,000
LF$500,000
Total for Project 446680-2$1,000,000

Phase Fund Code 2026 2027 2028 2029 2030

Construction GFBR $2,459,117

LF $734,648

SA $21,240

Total for Project 447255-1 $3,215,005

Phase Fund Code 2026 2027 2028 2029 2030

Construction ACSS $792,242

SU $1,087,304

Environmental TALT $150,000

Total for Project 447882-1 $2,029,546

PhaseFund Code20262027202820292030
ConstructionACSS$1,801,448
SU$1,500,430
Total for Project 447887-1$3,301,878

446680-2 - PINEBROOK RD FROM S OF E VENCIE AVE TO N OF RIDGEWOOD AVE

Type of Work: MISCELLANEOUS CONSTRUCTION

447255-1 - INKWOOD DR OVER LITTLE FIELD WATERWAY BRIDGE #175030

Type of Work: BRIDGE REPLACEMENT

447882-1 - SR 776 FROM CHARLOTTE COUNTY LINE TO TANGERINE WOODS BLVD

Type of Work: MEDIAN MODIFICATION

447887-1 - SR 72 FROM SWIFT RD TO SAWYER RD

Type of Work: MEDIAN MODIFICATION

SARASOTA COUNTY

448070-1 - CIRCUS DRAWBRIDGE REHABILITATION BRIDGE #S 170167 & 170168

Type of Work: BRIDGE-REPAIR/REHABILITATION

PhaseFund Code20262027202820292030
Preliminary EngineeringBRRP$489,025
ConstructionBRRP$4,048,613
DIH$1,096
Total for Project 448070-1$489,025$4,049,709

Phase Fund Code 2026 2027 2028 2029 2030

Construction ACNR $2,707,946

ACPR $10,108,632

SA $1,338,573

SU $300,431

Total for Project 449122-1 $14,455,582

Phase Fund Code 2026 2027 2028 2029 2030

Right of Way DIH $156,000

DS $1,444,000

Total for Project 449122-2 $1,600,000

PhaseFund Code20262027202820292030
Preliminary EngineeringACNP$2,001,000
ConstructionACNP$35,813,413
Total for Project 449188-1$2,001,000$35,813,413
PhaseFund Code20262027202820292030
Preliminary EngineeringCD24$4,000,000
Total for Project 450843-2$4,000,000

449122-1 - SR 72 FROM US 41 (SR 45) TO E OF DEREK AVE Type of Work: RESURFACING

449122-2 - SR 72 FROM E OF DEREK AVE TO E OF HONORE AVE

Type of Work: FLEXIBLE PAVEMENT RECONSTRUCT.

449188-1 - I-75 (SR 93) FROM SR 681 TO SR 780

Type of Work: RESURFACING

450843-2 - FRUITVILLE RD FROM LORRAINE RD TO BOURNESIDE RD

Type of Work: ADD LANES & RECONSTRUCT

SARASOTA COUNTY

451010-1 - SR 45 (US 41) FROM N OF 14TH STREET TO S OF DR MLK JR WAY Type of Work: PAVEMENT ONLY RESURFACE (FLEX)

PhaseFund Code20262027202820292030
ConstructionDIH$5,480
DS$1,535,168
Total for Project 451010-1$1,540,648
PhaseFund Code20262027202820292030
ConstructionACSS$10,300
Total for Project 451011-2$10,300

Phase Fund Code 2026 2027 2028 2029 2030

PhaseFund Code20262027202820292030
ConstructionACSS$488,096
SU$498,396
Total for Project 451011-4$986,492
PhaseFund Code20262027202820292030
ConstructionDDR$5,155,601
DIH$5,150
Total for Project 451013-1$5,150$5,155,601
PhaseFund Code20262027202820292030
ConstructionDDR$18,691,101
DIH$51,500
Total for Project 451014-1$18,742,601

451011-2 - SR 45 (US 41) FROM N OF MYRTLE ST TO S OF GENERAL SPAATZ BLVD

Type of Work: SAFETY PROJECT

451011-3 - SR 45 (US 41) FROM N OF MYRTLE ST TO S OF GENERAL SPAATZ BLVD Type of Work: PAVEMENT ONLY RESURFACE (FLEX)

Construction DDR $306,083

DIH $5,150

DS $3,956,669

Total for Project 451011-3 $4,267,902

451011-4 - SR 45 (US 41) FROM N OF MYRTLE ST TO S OF GENERAL SPAATZ BLVD

Type of Work: SAFETY PROJECT

451013-1 - SR 789 FROM LONGBOAT CLUB RD TO MANATEE CO LINE

Type of Work: PAVEMENT ONLY RESURFACE (FLEX)

451014-1 - SR 776 FROM CHARLOTTE CO LINE TO S OF US 41

Type of Work: PAVEMENT ONLY RESURFACE (FLEX)

SARASOTA COUNTY

451017-1 - SR 683 (US 301) FROM US 41 TO S OF 10TH ST Type of Work: RESURFACING

Phase Fund Code 2026 2027 2028 2029 2030

Construction ACNR $7,453,535

DIH $5,150

SA $854,201

SU $453,453

Total for Project 451017-1 $8,766,339

PhaseFund Code20262027202820292030
ConstructionBRRP$4,181,425
DIH$10,300
Total for Project 451280-1$4,191,725

Phase Fund Code 2026 2027 2028 2029 2030

Construction LF $120,000

SU $26,161

TALU $449,839

Total for Project 451389-1 $596,000

PhaseFund Code20262027202820292030
Design BuildACNP$40,053,629
Total for Project 451734-1$40,053,629
PhaseFund Code20262027202820292030
Preliminary EngineeringBRRP$474,762
ConstructionBRRP$4,433,679
Total for Project 452172-1$474,762$4,433,679

451280-1 - SR 758 OVER SARASOTA BAY BRIDGE NO 170061 Type of Work: BRIDGE-REPAIR/REHABILITATION

451389-1 - BEACH RD FROM AVENIDA DEL MARE TO MIDNIGHT PASS RD

Type of Work: PUBLIC TRANSPORTATION SHELTER

451734-1 - I-75 (SR 93) FROM SR 777 TO SR 681

Type of Work: RESURFACING

452172-1 - SARASOTA COUNTY SUBMARINE CABLE REPLACEMENT

Type of Work: BRIDGE-REPAIR/REHABILITATION

SARASOTA COUNTY

452784-1 - SR 45 (US 41/US 41B) FROM S OF SR 758 (BEE RIDGE RD) TO S OF SR 683 Type of Work: RESURFACING

Phase Fund Code 2026 2027 2028 2029 2030

Preliminary Engineering DIH $1,000

Construction ACNR $11,266,925

DS $1,301,000

ACSS $570,591

DIH $5,480

DS $1,674,765

Total for Project 452784-1 $1,302,000 $13,517,761

Phase Fund Code 2026 2027 2028 2029 2030

453226-1 - SR 777 RIVER RD FROM US 41 (SR 45) TO OBSERVATION BLVD Type of Work: LANDSCAPING

Construction DDR $1,365,763

DIH $1,030

DS $240,611

Total for Project 453226-1 $1,030 $1,606,374

453537-1 - US41/S TAMIAMI TRAIL FROM SIESTA DR TO SR683/US301 ATSPM/CV UPGRADE Type of Work: ATMS - ARTERIAL TRAFFIC MGMT

PhaseFund Code20262027202820292030
ConstructionSU$2,285,839
Total for Project 453537-1$2,285,839
PhaseFund Code20262027202820292030
ConstructionSU$3,699,594
Total for Project 453538-1$3,699,594
PhaseFund Code20262027202820292030
ConstructionSU$4,783,162
Total for Project 453539-1$4,783,162
PhaseFund Code20262027202820292030
ConstructionCD23$1,000,000
Total for Project 454945-1$1,000,000

453538-1 - US 41 (SR 45) GULF GATE DR TO BEE RIDGE RD ATSPM/CV UPGRADE Type of Work: ATMS - ARTERIAL TRAFFIC MGMT

453539-1 - SR 780/FRUITVILLE RD FROM US 301 TO HONORE AVENUE ATSPM CV UPGRADE

Type of Work: ATMS - ARTERIAL TRAFFIC MGMT

454945-1 - WINCHESTER BLVD FROM CHARLOTTE COUNTY LINE TO S RIVER RD Type of Work: ADD LANES & RECONSTRUCT

SARASOTA COUNTY

455147-1 - MANASOTA KEY BASCULE BRIDGE - REHABILITATION AND STORM HARDENING
Type of Work: BRIDGE-REPAIR/REHABILITATION
PhaseFund Code20262027202820292030
ConstructionPROD$6,030,000
Total for Project 455147-1$6,030,000
PhaseFund Code20262027202820292030
Preliminary EngineeringACSS$510,000
Total for Project 455186-1$510,000
PhaseFund Code20262027202820292030
Preliminary EngineeringACNP$3,010,000
Total for Project 455381-1$3,010,000
PhaseFund Code20262027202820292030
ConstructionFC5$329,242
Total for Project 456038-1$329,242
PhaseFund Code20262027202820292030
ConstructionFC5$61,072
Total for Project 456039-1$61,072

455186-1 - SR45(US41) FROM SR776 TO NORTH OF CENTER RD

Type of Work: SAFETY PROJECT

455381-1 - I-75 AT SR 681 INTERCHANGE IMPROVEMENTS

Type of Work: INTERCHANGE - ADD LANES

456038-1 - SR 681 FROM SOUTH OF ISLA PALMA LANE TO SOUTH OF I-75

Type of Work: PAVEMENT ONLY RESURFACE (FLEX)

456039-1 - I-75(SR93) FROM NORTH OF BEE RIDGE ROAD TO SOUTH OF FRUITVILLE ROAD Type of Work: PAVEMENT ONLY RESURFACE (FLEX)

SARASOTA COUNTY

Maintenance

412584-1 - SARASOTA COUNTY HIGHWAY LIGHTING

Type of Work: ROUTINE MAINTENANCE

PhaseFund Code20262027202820292030
Bridge/Roadway/Contract MaintenanceD$665,548$685,521
Total for Project 412584-1$665,548$685,521
PhaseFund Code20262027202820292030
Bridge/Roadway/Contract MaintenanceD$121,640$125,290
Total for Project 413565-1$121,640$125,290
PhaseFund Code20262027202820292030
Bridge/Roadway/Contract MaintenanceD$351,404$361,949
Total for Project 413566-1$351,404$361,949
PhaseFund Code20262027202820292030
Bridge/Roadway/Contract MaintenanceD$118,352$121,904
Total for Project 413567-1$118,352$121,904
PhaseFund Code20262027202820292030
Bridge/Roadway/Contract MaintenanceD$57,715$59,447
Total for Project 413807-1$57,715$59,447
PhaseFund Code20262027202820292030
Bridge/Roadway/Contract MaintenanceD$2,698,974$2,698,974$2,698,974$1,349,487
Total for Project 448729-1$2,698,974$2,698,974$2,698,974$1,349,487

413565-1 - NORTH PORT HIGHWAY LIGHTING

Type of Work: ROUTINE MAINTENANCE

413566-1 - SARASOTA CITY HIGHWAY LIGHTING

Type of Work: ROUTINE MAINTENANCE

413567-1 - VENICE HIGHWAY LIGHTING

Type of Work: ROUTINE MAINTENANCE

413807-1 - LONGBOAT KEY HIGHWAY LIGHTING

Type of Work: ROUTINE MAINTENANCE

448729-1 - SARASOTA ASSET MAINTENANCE

Type of Work: ROUTINE MAINTENANCE

SARASOTA COUNTY

Miscellaneous

455928-1 - BENEVA RD TO BOBBY JONES GOLF CLUB / CIRCUS BLVD Type of Work: BIKE PATH/TRAIL

PhaseFund Code20262027202820292030
Preliminary EngineeringTLWR$550,000
Total for Project 455928-1$550,000

SARASOTA COUNTY

438750-1 - VENICE MUNICIPAL AIRPORT
Type of Work: AVIATION PRESERVATION PROJECT
PhaseFund Code20262027202820292030
CapitalDPTO$500,000
LF$125,000
Total for Project 438750-1$625,000
PhaseFund Code20262027202820292030
CapitalDPTO$675,000
LF$675,000
Total for Project 444676-1$1,350,000

Phase Fund Code 2026 2027 2028 2029 2030

Capital DPTO $700,000

FAA $12,600,000

LF $700,000

Total for Project 444679-1 $14,000,000

Phase Fund Code 2026 2027 2028 2029 2030

Capital DDR $1,000,000

PhaseFund Code20262027202820292030
CapitalDPTO$2,166,000
LF$541,500
Total for Project 450206-1$2,707,500

444676-1 - SARASOTA-BRADENTON INT'L ARPT EMERGENCY OPERATIONS CENTER Type of Work: AVIATION REVENUE/OPERATIONAL

444679-1 - SARASOTA-BRADENTON INT'L ARPT RUNWAY 14-32 REHAB W/ PAVED SHOULDERS Type of Work: AVIATION PRESERVATION PROJECT

446357-1 - SARASOTA-BRADENTON INT'L ARPT BAGGAGE HANDLING SYSTEM

Type of Work: AVIATION PRESERVATION PROJECT

DPTO $2,000,000

LF $2,000,000 $1,000,000

Total for Project 446357-1 $4,000,000 $2,000,000

450206-1 - VENICE MUNICIPAL AIRPORT REHABILITATE TAXILANES

Type of Work: AVIATION PRESERVATION PROJECT

SARASOTA COUNTY

450301-1 - SARASOTA-BRADENTON AIRPORT LAND ACQUISITION PROJECT Type of Work: AVIATION ENVIRONMENTAL PROJECT

Phase Fund Code 2026 2027 2028 2029 2030

Capital DDR $2,323,368

DPTO $2,076,632

LF $4,400,000

Total for Project 450301-1 $8,800,000

PhaseFund Code20262027202820292030
CapitalDPTO$3,700,003
LF$3,700,000
Total for Project 450535-1$7,400,003

450535-1 - SARASOTA BRADENTON INTL AIRPORT GENERAL AVIATION FIS

Type of Work: AVIATION SAFETY PROJECT

450852-1 - SARASOTA BRADENTON INTL AIRPORT TERMINAL EXPANSION BAGGAGE IMPROVEMENT Type of Work: AVIATION CAPACITY PROJECT

PhaseFund Code20262027202820292030
CapitalDDR$2,300,000
LF$2,300,000
Total for Project 450852-1$4,600,000

Phase Fund Code 2026 2027 2028 2029 2030

Capital DDR $80,000

451402-1 - VENICE MUNICIPAL AIRPORT MAINTENANCE FACILITY Type of Work: AVIATION REVENUE/OPERATIONAL

DPTO $640,000

LF $20,000 $160,000

Total for Project 451402-1 $100,000 $800,000

PhaseFund Code20262027202820292030
CapitalDPTO$1,000,000$2,500,000$2,500,000
LF$1,000,000$2,500,000$2,500,000
Total for Project 453790-1$2,000,000$5,000,000$5,000,000

453790-1 - SARASOTA BRADENTON INTL AIRPORT TERMINAL PARKING GARAGE

Type of Work: AVIATION REVENUE/OPERATIONAL

SARASOTA COUNTY

456015-1 - SARASOTA BRADENTON INTL AIRPORT EXPAND BAGGAGE CLAIM AREA Type of Work: AVIATION CAPACITY PROJECT

PhaseFund Code20262027202820292030
CapitalLF$900,000
SIWR$900,000
Total for Project 456015-1$1,800,000

SARASOTA COUNTY

410144-1 - SARASOTA COUNTY STATE TRANSIT BLOCK GRANT OPERATING ASSISTANCE Type of Work: OPERATING FOR FIXED ROUTE

Phase Fund Code 2026 2027 2028 2029 2030

Operations DDR $2,012,583 $2,069,089 $2,131,162 $2,195,097 $2,260,950

LF $2,012,583 $2,069,089 $2,131,162 $2,195,097 $2,260,950

Total for Project 410144-1 $4,025,166 $4,138,178 $4,262,324 $4,390,194 $4,521,900

PhaseFund Code20262027202820292030
CapitalFTA$5,592,185$5,515,737$10,654,845$9,757,391
LF$1,398,046$1,378,934$2,663,711$2,439,348
Total for Project 410152-1$6,990,231$6,894,671$13,318,556$12,196,739
PhaseFund Code20262027202820292030
CapitalFTA$818,089$741,286$887,312$912,452
LF$204,522$185,322$221,828$228,113
Total for Project 434528-1$1,022,611$926,608$1,109,140$1,140,565

Phase Fund Code 2026 2027 2028 2029 2030

Operations FTA $465,037 $748,860 $2,204,194 $2,012,713 $2,766,805

LF $465,037 $748,860 $2,204,194 $2,012,713 $2,766,805

Total for Project 434610-1 $930,074 $1,497,720 $4,408,388 $4,025,426 $5,533,610

PhaseFund Code20262027202820292030
CapitalFTA$641,513$174,860$22,264$260,062$307,422
LF$160,378$43,715$5,566$65,016$76,856
Total for Project 434610-2$801,891$218,575$27,830$325,078$384,278

410152-1 - SARASOTA COUNTY/SAR-BRADENTON UZA/FTA SECTION 5307 CAPITAL ASSIST Type of Work: CAPITAL FOR FIXED ROUTE

434528-1 - SARASOTA CO/SAR-BRADENTON UZA FTA SECTION 5339 CAPITAL ASSISTANCE Type of Work: CAPITAL FOR FIXED ROUTE

434610-1 - SARASOTA CTY-SMALL URBAN N PORT-PUNTA GORDA FTA SECT 5307 OPER ASSIST Type of Work: OPERATING FOR FIXED ROUTE

434610-2 - SARASOTA CTY/SMALL URBAN N PORT-PUNTA GORDA/FTA SEC 5307 CAP ASSIST Type of Work: CAPITAL FOR FIXED ROUTE

SARASOTA COUNTY

440266-1 - SARASOTA COUNTY-SAR-BRADENTON UZA/FTA SECT 5307 OPERATING ASSISTANCE Type of Work: OPERATING FOR FIXED ROUTE

Phase Fund Code 2026 2027 2028 2029 2030

Operations FTA $710,696 $700,900 $1,429,464 $1,106,246

LF $710,696 $700,900 $1,429,464 $1,106,246

Total for Project 440266-1 $1,421,392 $1,401,800 $2,858,928 $2,212,492

Phase Fund Code 2026 2027 2028 2029 2030

Operations DPTO $371,057 $259,740

LF $371,057 $259,740

Total for Project 448714-1 $742,114 $519,480

Phase Fund Code 2026 2027 2028 2029 2030

Operations DDR $969,562 $455,211 $455,211 $969,562

DPTO $969,562 $514,351 $514,351

LF $969,562 $969,562 $969,562 $969,562

Total for Project 453564-1 $969,562 $1,939,124 $1,939,124 $1,939,124 $1,939,124

PhaseFund Code20262027202820292030
OperationsDDR$820,462
LF$820,462
Total for Project 455239-1$1,640,924

448714-1 - CITY OF SARASOTA - OPERATING - CORRIDOR PILOT PROJECT

Type of Work: URBAN CORRIDOR IMPROVEMENTS

453564-1 - SARASOTA COUNTY OPERATING ASSISTANCE CORRIDOR US41

Type of Work: URBAN CORRIDOR IMPROVEMENTS

455239-1 - SARASOTA COUNTY OPERATING SERVICE DEVELOPMENT ROUTE 77 EXPANSION Type of Work: OPERATING FOR FIXED ROUTE

SARASOTA COUNTY

SARASOTA COUNTY Transportation Planning

Transportation Planning

439315-5 - SARASOTA/MANATEE MPO FY 2024/2025-2025/2026 UPWP

Type of Work: TRANSPORTATION PLANNING

Phase Fund Code 2026 2027 2028 2029 2030

Planning PL $1,551,820

SU $1,000,000

Total for Project 439315-5 $2,551,820

Phase Fund Code 2026 2027 2028 2029 2030

Planning PL $1,551,820 $1,551,820

SU $1,000,000 $1,000,000

Total for Project 439315-6 $2,551,820 $2,551,820

PhaseFund Code20262027202820292030
PlanningPL$1,551,820$1,551,820
SU$1,000,000$1,000,000
Total for Project 439315-7$2,551,820$2,551,820

439315-6 - SARASOTA/MANATEE MPO FY 2026/2027-2027/2028 UPWP

Type of Work: TRANSPORTATION PLANNING

439315-7 - SARASOTA/MANATEE MPO FY 2028/2029-2029/2030 UPWP

Type of Work: TRANSPORTATION PLANNING

Fund Codes

Federal ACBR - ADVANCE CONSTRUCTION (BRT) ACNP - ADVANCE CONSTRUCTION NHPP ACNR - AC NAT HWY PERFORM RESURFACING

ACPR - AC - PROTECT GRANT PGM ACSS - ADVANCE CONSTRUCTION (SS,HSP) ACSU - ADVANCE CONSTRUCTION (SU)

FAA - FEDERAL AVIATION ADMIN FTA - FEDERAL TRANSIT ADMINISTRATION GFBR - GEN FUND BRIDGE REPAIR/REPLACE

PL - METRO PLAN (85% FA; 15% OTHER) TALT - TRANSPORTATION ALTS- ANY AREA SA - STP, ANY AREA TALU - TRANSPORTATION ALTS- >200K SU - STP, URBAN AREAS > 200K

Federal Earmark CD23 - CONGRESS GF EARMARKS HIP 2023 CD24 - CONGRESS GF EARMARKS HIP 2024 PROD - PROTECT DISC. GRANT PROGRAM

Local LF - LOCAL FUNDS

R/W and Bridge Bonds BNIR - INTRASTATE R/W & BRIDGE BONDS

State BRRP - STATE BRIDGE REPAIR & REHAB CIGP - COUNTY INCENTIVE GRANT PROGRAM D - UNRESTRICTED STATE PRIMARY

DDR - DISTRICT DEDICATED REVENUE DIH - STATE IN-HOUSE PRODUCT SUPPORT DITS - STATEWIDE ITS - STATE 100%.

DPTO - STATE - PTO DS - STATE PRIMARY HIGHWAYS & PTO FC5 - OPEN GRADE FRICTION COURSE FC5

SIWR - 2015 SB2514A-STRATEGIC INT SYS TLWR - 2015 SB2514A-TRAIL NETWORK