← 766.pdf_v_d03202024.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
SR 590 Repaving from Leonard Drive to Delaware Street 441656-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
LimitsLeonard Dr to Delaware St
Project StartFall 2023
Length1.5 miles
CitySafety Harbor
CountyPinellas
RoadSR 590
Construction Cost$2.4 million
Estimated CompletionSpring 2024
ContractorHubbard Construction Company
About
As of March 14, 2024, all construction activities associated with this project have been completed.
This project consists of repaving SR 590 between Leonard Drive and Delaware Street in Safety Harbor.
In addition, curb ramps and sidewalks will be modified to meet the Americans with Disabilities Act (ADA) standards.
Construction activities are expected in spring 2024.
Contact Information
Project Information
Maddie Pfingsten 727-575-8334 roadwork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us