Alt US 19 (N. Pinellas Ave) Sidewalk from Oscar Hill Rd to Dixie Hwy 441441-2-52-01
| Project Details | |
| Work Type | Sidewalk |
|---|---|
| Phase | Completed |
| Limits | from Oscar Hill Rd to Dixie Hwy |
| Project Start | August 2020 |
| Length | .3 miles |
| City | Tarpon Springs |
| County | Pinellas |
| Road | Alt US 19 Pinellas Avenue |
| Construction Cost | $1,622,282 |
| Estimated Completion | Spring 2021 |
| Contractor | David Nelson Construction Co. |
Contact Information
Project Information
Sarah Gansz 727-575-8300
Sarah.Gansz@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
FINAL ACCEPTED ON MARCH 4, 2021
This project will add sidewalks along both sides of Alt. US 19 (Pinellas Avenue) between Oscar Hill Road and Dixie Highway in Tarpon Springs.
In addition, a new mid-block pedestrian crossing with a rectangular rapid flashing beacon will be installed between Anclote Road and Fulton Street.
The $1.6 project is expected to finish in the spring of 2021.