Alt US 19 (N. Pinellas Ave) Sidewalk from Oscar Hill Rd to Dixie Hwy 441441-2-52-01
| Project Details |
| Work Type | Sidewalk |
|---|
| Phase | Completed |
|---|
| Limits | from Oscar Hill
Rd to Dixie Hwy |
|---|
| Project Start | August 2020 |
|---|
| Length | .3 miles |
|---|
| City | Tarpon Springs |
|---|
| County | Pinellas |
|---|
| Road | Alt US 19
Pinellas Avenue |
|---|
| Construction Cost | $1,622,282 |
|---|
| Estimated Completion | Spring 2021 |
|---|
| Contractor | David Nelson
Construction Co. |
|---|
Contact Information
Project Information
Sarah Gansz 727-575-8300
Sarah.Gansz@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
This project will add sidewalks along both sides of Alt. US 19 (Pinellas Avenue) between Oscar Hill Road and Dixie Highway in Tarpon Springs.
In addition, a new mid-block pedestrian crossing with a rectangular rapid flashing beacon will be installed between Anclote Road and Fulton Street.
The $1.6 project is expected to finish in the spring of 2021.