← 1195.pdf_v_d08062026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 50 (Cortez Boulevard) Resurfacing from Wisconsin Road to Cobb Road 451046-1-52-01
| Project Details | |
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | SR 50 (Cortez Boulevard) from Wisconsin Road to Cobb Road |
| Length | 3.78 |
| City | Brooksville |
| County | Hernando |
| Road | Cortez Boulevard SR 50 |
Contact Information
Design Manager
Carlos Perez
813-975-6929
CarlosH.Perez@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of State Road (SR) 50 in Hernando County.
Construction is anticipated to begin in Fall 2027.