Tampa Bay Florida Department of Transportation
SR 50 (Cortez Boulevard) Resurfacing from Wisconsin Road to Cobb Road 451046-1-52-01
Project Details
Work TypeResurfacing
PhaseDesign
LimitsSR 50 (Cortez Boulevard) from Wisconsin Road to Cobb Road
Length3.78
CityBrooksville
CountyHernando
RoadCortez Boulevard SR 50
Contact Information
Design Manager
Carlos Perez
813-975-6929
CarlosH.Perez@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of State Road (SR) 50 in Hernando County.
Construction is anticipated to begin in Fall 2027.