← 87_v_07222026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

Southwest Florida Florida Department of Transportation

Bradenton-Palmetto Connector Project Development and Environment (PD&E) Study 444843-1

Project Details
Work TypeNew Road
PhasePD&E
CityBradentonPalmetto
CountyManatee

Contact Information

Planning Project Manager Michelle Rutishauser Michelle.Rutishauser@dot.state.fl.us

About

The Bradenton-Palmetto Connector proposes to provide additional capacity and improve mobility over the Manatee River, specifically between the Cities of Bradenton and Palmetto. A total three (3) corridors were evaluated during the Project Development and Environment (PD&E) Study. A proposed Preferred Alternative will be presented at the Public Hearing.

Specific right-of-way needs will be determined during the subsequent design phase, with any potential acquisition occurring during the project's right-of-way phase.