Southwest Florida Florida Department of Transportation
| Project Details | |
| Work Type | New Road |
|---|---|
| Phase | PD&E |
| City | BradentonPalmetto |
| County | Manatee |
Contact Information
Planning Project Manager Michelle Rutishauser Michelle.Rutishauser@dot.state.fl.us
The Bradenton-Palmetto Connector proposes to provide additional capacity and improve mobility over the Manatee River, specifically between the Cities of Bradenton and Palmetto. A total three (3) corridors were evaluated during the Project Development and Environment (PD&E) Study. A proposed Preferred Alternative will be presented at the Public Hearing.
Specific right-of-way needs will be determined during the subsequent design phase, with any potential acquisition occurring during the project's right-of-way phase.