← 1088.pdf_v_d07072026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
I-275 Repaving from north of Maximo Point Bridges to south of 54th Avenue S 449153-1-52-01
| Project Details | |
| Work Type | Milling and resurfacing |
|---|---|
| Phase | Design |
| Limits | from north of Maximo Point Bridges to south of 54th Avenue S |
| Length | 3.8 miles |
| City | St. Petersburg |
| County | Pinellas |
| Road | I-275 |
Contact Information
Design Manager
Dinyar Sharifabad
813-975-6172
Dinyar.Sharifabad@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will repave I-275 from north of Maximo Point Bridges to south of 54th Avenue S in Pinellas County.
Construction is anticipated to begin in summer 2027.