I-275 Repaving from north of Maximo Point Bridges to south of 54th Avenue S 449153-1-52-01
| Project Details |
| Work Type | Milling and resurfacing |
|---|
| Phase | Design |
|---|
| Limits | from north of Maximo Point Bridges to south of 54th Avenue S |
|---|
| Length | 3.8 miles |
|---|
| City | St. Petersburg |
|---|
| County | Pinellas |
|---|
| Road | I-275 |
|---|
Contact Information
Design Manager
Dinyar Sharifabad
813-975-6172
Dinyar.Sharifabad@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
This project will repave I-275 from north of Maximo Point Bridges to south of 54th Avenue S in Pinellas County.
Construction is anticipated to begin in summer 2027.