← 504.pdf_v_d04072021.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
SR 580 (Busch Blvd) Pedestrian Safety Improvements 441098-1-52-01
Project Details
Work TypePedestrian Safety Improvements
PhaseCompleted
Limitsat the intersections of 12th St., Pawnee Ave., Overlook Dr. and Brooks St.
Project StartJune 2020
CityTampa
CountyHillsborough
RoadBusch Boulevard SR 580
Construction Cost$1,323,800
Estimated CompletionEarly 2021
ContractorHighway Safety Devices, Inc.
About
FINAL ACCEPTED ON NOVEMBER 30, 2021.
This project added new high-intensity pedestrian-activated signalized crosswalks on SR 580 (Busch Blvd) at the intersections of Brooks St., Pawnee Avenue, and Overlook Drive in Tampa.
Additionally, the existing rapid flashing beacon pedestrian crossing was replaced with a high-intensity pedestrian-activated signalized crosswalk on SR 580 (Busch Blvd) at the intersection with 12th St. in Tampa.
441098-1 and 441098-2 have been combined into a single construction contract. All updates and lane closure information will be posted on this webpage.
Contact Information
Project Information
Andrew Williams 813-612-3200
Andrew.Williams@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us