← 504.pdf_v_d04072021.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

SR 580 (Busch Blvd) Pedestrian Safety Improvements 441098-1-52-01

Project Details
Work TypePedestrian Safety Improvements
PhaseCompleted
Limitsat the intersections of 12th St., Pawnee Ave., Overlook Dr. and Brooks St.
Project StartJune 2020
CityTampa
CountyHillsborough
RoadBusch Boulevard SR 580
Construction Cost$1,323,800
Estimated CompletionEarly 2021
ContractorHighway Safety Devices, Inc.

About

FINAL ACCEPTED ON NOVEMBER 30, 2021.

This project added new high-intensity pedestrian-activated signalized crosswalks on SR 580 (Busch Blvd) at the intersections of Brooks St., Pawnee Avenue, and Overlook Drive in Tampa.

Additionally, the existing rapid flashing beacon pedestrian crossing was replaced with a high-intensity pedestrian-activated signalized crosswalk on SR 580 (Busch Blvd) at the intersection with 12th St. in Tampa.

441098-1 and 441098-2 have been combined into a single construction contract. All updates and lane closure information will be posted on this webpage.

Contact Information

Project Information

Andrew Williams 813-612-3200

Andrew.Williams@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us