SR 580 (Busch Blvd) Pedestrian Safety Improvements 441098-1-52-01
| Project Details | |
| Work Type | Pedestrian Safety Improvements |
|---|---|
| Phase | Completed |
| Limits | at the intersections of 12th St., Pawnee Ave., Overlook Dr. and Brooks St. |
| Project Start | June 2020 |
| City | Tampa |
| County | Hillsborough |
| Road | Busch Boulevard SR 580 |
| Construction Cost | $1,323,800 |
| Estimated Completion | Early 2021 |
| Contractor | Highway Safety Devices, Inc. |
About
FINAL ACCEPTED ON NOVEMBER 30, 2021.
This project added new high-intensity pedestrian-activated signalized crosswalks on SR 580 (Busch Blvd) at the intersections of Brooks St., Pawnee Avenue, and Overlook Drive in Tampa.
Additionally, the existing rapid flashing beacon pedestrian crossing was replaced with a high-intensity pedestrian-activated signalized crosswalk on SR 580 (Busch Blvd) at the intersection with 12th St. in Tampa.
441098-1 and 441098-2 have been combined into a single construction contract. All updates and lane closure information will be posted on this webpage.