← 386.pdf_v_d04092026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
Henry Canal Drainage Improvements from Church Avenue to Himes Avenue 422929-8-52-01
| Project Details | |
| Work Type | DrainageImprovement |
|---|---|
| Phase | Design |
| Limits | from ChurchAvenue toHimes Avenue |
| City | Tampa |
| County | Hillsborough |
Contact Information
Design Manager Digvijay Patil 813-975-6176 Digvijay.Patil@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The project will re-grade and stabilize the canal slopes along the Henry Canal between Church and Himes avenues. Activities in this contract will resolve the slope stability and erosion issues along the drainage canal.
The project is currently in design.