Henry Canal Drainage Improvements from Church Avenue to Himes Avenue 422929-8-52-01

Project Details
Work TypeDrainageImprovement
PhaseDesign
Limitsfrom ChurchAvenue toHimes Avenue
CityTampa
CountyHillsborough

Contact Information

Design Manager Digvijay Patil 813-975-6176 Digvijay.Patil@dot.state.fl.us

Media Contact

Kayla Mejia

813-975-6060

Kayla.Mejia@dot.state.fl.us

About

The project will re-grade and stabilize the canal slopes along the Henry Canal between Church and Himes avenues. Activities in this contract will resolve the slope stability and erosion issues along the drainage canal.

The project is currently in design.