← 1234.pdf_v_d07272026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

US 98 (SR 55) Resurfacing from W Fort Island Trail to south of NE 1st Terrace 447927-1-52-01

Project Details

Work TypeResurfacing
PhaseDesign
LimitsUS 98 (SR 55) from W Fort Island Trail to south of NE 1st Terrace
Length0.82 miles
CityCrystal River
CountyCitrus
RoadSR 55 US 98

Contact Information

Design Manager

Jason Jordan

813-975-6169

Jason.Jordan@dot.state.fl.us

Media Contact

Kayla Mejia 813-975-6060

Kayla Mejia dot state fl us

Kayla.Mejia@dot.state.fl.us

About

The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of US 98 in Citrus County.

Other improvements include ADA upgrades, sidewalk repair, and safety improvements.

Construction is currently anticipated to begin late 2029.