Project Details
| Work Type | Resurfacing |
|---|---|
| Phase | Design |
| Limits | US 98 (SR 55) from W Fort Island Trail to south of NE 1st Terrace |
| Length | 0.82 miles |
| City | Crystal River |
| County | Citrus |
| Road | SR 55 US 98 |
Contact Information
Design Manager
Jason Jordan
813-975-6169
Jason.Jordan@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla Mejia dot state fl us
Kayla.Mejia@dot.state.fl.us
The purpose of this project is to preserve and extend the life of the existing pavement through resurfacing along this section of US 98 in Citrus County.
Other improvements include ADA upgrades, sidewalk repair, and safety improvements.
Construction is currently anticipated to begin late 2029.