← 1185.pdf_v_d04092026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
US 92 (Baker Street) Resurfacing from east of Park Road to County Line Road 450338-1-52-01
Project Details
Work TypeResurfacing
PhaseDesign
LimitsUS 92 (Baker Street) from east of Park Road to County Line Road
Length2.95 miles
CityPlant City
CountyHillsborough
RoadBaker Street SR 600 US 92
Contact Information
Design Manager
Digvijay Patil
813-975-6176
Digvijay.Patil@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of the project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of US 92 (Baker Street) in Plant City.
Construction is currently anticipated to begin in Spring 2028.