| Project Details |
| Work Type | Resurfacing |
|---|
| Phase | Design |
|---|
| Limits | US 92 (Baker Street) from east of Park Road to County Line Road |
|---|
| Length | 2.95 miles |
|---|
| City | Plant City |
|---|
| County | Hillsborough |
|---|
| Road | Baker Street SR 600 US 92 |
|---|
Contact Information
Design Manager
Digvijay Patil
813-975-6176
Digvijay.Patil@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
The purpose of the project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of US 92 (Baker Street) in Plant City.
Construction is currently anticipated to begin in Spring 2028.