← 410.pdf_v_d12022020.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
Pinellas County Bridge Repair Various Locations 437517-1-52-01
Project Details
Work TypeBridge Repair
PhaseCompleted
Limitsmultiple locations in Pinellas County
Project StartJune 2019
CityDunedin Seminole St. Pete Beach St. Petersburg
CountyPinellas
RoadAlt US 19 Bay Pines Boulevard Pasadena Avenue Pinellas Bayway SR 682 SR 693
Construction Cost$2.1
Estimated CompletionSummer 2020
ContractorEngineer Control Systems, Corp.
About
PROJECT COMPLETED ON AUGUST 21,2020
This project is making concrete repairs to multiple bridges throughout Pinellas County.
The various locations include:
Alt US 19 (Bay Pines Boulevard) over Long Bayou
Alt US 19 (Bayshore Boulevard) over Curlew Creek
Alt US 19 (Bayshore Boulevard) over Cedar Creek
SR 693 (South Pasadena Avenue) over Boca Ciega Bay (3) locations
All construction activities are taking place underneath each bridge and are expected to finish in summer of 2020.
Contact Information
Project Information
David Gillett, P.E.
727-575-8300
David.Gillett@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us