← 410.pdf_v_d12022020.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
Pinellas County Bridge Repair Various Locations 437517-1-52-01
| Project Details | |
| Work Type | Bridge Repair |
|---|---|
| Phase | Completed |
| Limits | multiple locations in Pinellas County |
| Project Start | June 2019 |
| City | Dunedin Seminole St. Pete Beach St. Petersburg |
| County | Pinellas |
| Road | Alt US 19 Bay Pines Boulevard Pasadena Avenue Pinellas Bayway SR 682 SR 693 |
| Construction Cost | $2.1 |
| Estimated Completion | Summer 2020 |
| Contractor | Engineer Control Systems, Corp. |
About
PROJECT COMPLETED ON AUGUST 21,2020
This project is making concrete repairs to multiple bridges throughout Pinellas County.
The various locations include:
- Alt US 19 (Bay Pines Boulevard) over Long Bayou
- Alt US 19 (Bayshore Boulevard) over Curlew Creek
- Alt US 19 (Bayshore Boulevard) over Cedar Creek
- SR 693 (South Pasadena Avenue) over Boca Ciega Bay (3) locations
All construction activities are taking place underneath each bridge and are expected to finish in summer of 2020.
Contact Information
Project Information
David Gillett, P.E.
727-575-8300
David.Gillett@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us