← 954.pdf_v_d02242025.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
I-75/I-275 Collector-Distributor Roadway from SR 56 to south of County Line Road 430573-2, 430573-3
| Project Details | |
| Work Type | New Road Construction |
|---|---|
| Phase | Design |
| Limits | From south of County Line Road to SR 56 |
| Length | 3.9 miles |
| City | Wesley Chapel |
| County | Hillsborough Pasco |
| Road | I-275 I-75 SR 56 |
Contact Information
Design Manager
- Dinyar Sharifabad
- 975-6172
- Dinyar.Sharifabad@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will construct a 3-lane southbound Collector-Distributor (CD) road system from the SR 56 southbound on-ramp to the I-75 / I-275 apex to complement the northbound CD road system in Wesley Chapel.
This includes:
- A new 2-lane southbound on-ramp from the CD roadway to southbound I-75, which will require widening the bridge over Cypress Creek.
- A new bridge over Cypress Creek for the southbound CD roadway
- A new fork of I-75 / I-275 southbound
- A new bridge for southbound I-275 over the CD road ramp to southbound I-75
- New concrete barrier wall separation between the southbound I-75 mainline lanes and the proposed southbound CD roadway.
- A proposed ramp from the southbound CD roadway to southbound I-75.
The project is currently in the design phase and has been combined with FPN 430573-3.
Construction is not currently funded.