← 954.pdf_v_d02242025.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

I-75/I-275 Collector-Distributor Roadway from SR 56 to south of County Line Road 430573-2, 430573-3

Project Details
Work TypeNew Road Construction
PhaseDesign
LimitsFrom south of County Line Road to SR 56
Length3.9 miles
CityWesley Chapel
CountyHillsborough Pasco
RoadI-275 I-75 SR 56

Contact Information

Design Manager

  • Dinyar Sharifabad
  • 975-6172
  • Dinyar.Sharifabad@dot.state.fl.us

Media Contact

Kayla Mejia

813-975-6060

Kayla.Mejia@dot.state.fl.us

About

This project will construct a 3-lane southbound Collector-Distributor (CD) road system from the SR 56 southbound on-ramp to the I-75 / I-275 apex to complement the northbound CD road system in Wesley Chapel.

This includes:

  • A new 2-lane southbound on-ramp from the CD roadway to southbound I-75, which will require widening the bridge over Cypress Creek.
  • A new bridge over Cypress Creek for the southbound CD roadway
  • A new fork of I-75 / I-275 southbound
  • A new bridge for southbound I-275 over the CD road ramp to southbound I-75
  • New concrete barrier wall separation between the southbound I-75 mainline lanes and the proposed southbound CD roadway.
  • A proposed ramp from the southbound CD roadway to southbound I-75.

The project is currently in the design phase and has been combined with FPN 430573-3.

Construction is not currently funded.