| Project Details | |
| Work Type | New Road Construction |
|---|---|
| Phase | Design |
| Limits | From south of County Line Road to SR 56 |
| Length | 3.9 miles |
| City | Wesley Chapel |
| County | Hillsborough Pasco |
| Road | I-275 I-75 SR 56 |
Contact Information
Design Manager
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
This project will construct a 3-lane southbound Collector-Distributor (CD) road system from the SR 56 southbound on-ramp to the I-75 / I-275 apex to complement the northbound CD road system in Wesley Chapel.
This includes:
The project is currently in the design phase and has been combined with FPN 430573-3.
Construction is not currently funded.