← 1091.pdf_v_d10082026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
SR 60 (Adamo Drive) from west of N 34th Street to east of N 34th Street 448934-1-52-01
Project Details
Project Details
Work TypeRigid Pavement Reconstruction
PhaseDesign
LimitsFrom west of N 34th Street to east of N 34th Street
Length.323 miles
CityTampa
CountyHillsborough
RoadAdamo Drive SR 60
Contact Information
Design Manager
Alex Carlson
813-975-3668
Alex.Carlson@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to replace the asphalt pavement with concrete pavement along SR 60 (Adamo Drive) from west of N 34th Street to east of N 34th Street in Tampa.
This project is currently in the design phase.
Construction activities are expected to begin during summer of 2027.