← 1091.pdf_v_d10082026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 60 (Adamo Drive) from west of N 34th Street to east of N 34th Street 448934-1-52-01
Project Details
| Project Details | |
| Work Type | Rigid Pavement Reconstruction |
|---|---|
| Phase | Design |
| Limits | From west of N 34th Street to east of N 34th Street |
| Length | .323 miles |
| City | Tampa |
| County | Hillsborough |
| Road | Adamo Drive SR 60 |
Contact Information
Design Manager
Alex Carlson
813-975-3668
Alex.Carlson@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to replace the asphalt pavement with concrete pavement along SR 60 (Adamo Drive) from west of N 34th Street to east of N 34th Street in Tampa.
This project is currently in the design phase.
Construction activities are expected to begin during summer of 2027.