SR 60 (Adamo Drive) from west of N 34th Street to east of N 34th Street 448934-1-52-01
Project Details
| Project Details |
| Work Type | Rigid Pavement Reconstruction |
|---|
| Phase | Design |
|---|
| Limits | From west of N 34th Street to east of N 34th Street |
|---|
| Length | .323 miles |
|---|
| City | Tampa |
|---|
| County | Hillsborough |
|---|
| Road | Adamo Drive SR 60 |
|---|
Contact Information
Design Manager
Alex Carlson
813-975-3668
Alex.Carlson@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
The purpose of this project is to replace the asphalt pavement with concrete pavement along SR 60 (Adamo Drive) from west of N 34th Street to east of N 34th Street in Tampa.
This project is currently in the design phase.
Construction activities are expected to begin during summer of 2027.