I-275 NB Exit Ramp onto Scott Street Improvements from Ashley Drive to Franklin Street 451462-2-52-01

Project Details
Work TypeIntersectionImprovements
PhaseDesign
LimitsI-275 NB ExitRamp onto Scott Street fromAshley Drive toFranklin Street
Length0.18 miles
CityTampa
CountyHillsborough
RoadI-275

Contact Information

Contact Information

Design Manager

Helena Ly 813-975-3690

Helena.Ly@dot.state.fl.us

Media Contact

Kayla Mejia

813-975-6060

Kayla.Mejia@dot.state.fl.us

About

This project will improve the I-275 Northbound (NB) Exit Ramp onto Scott Street from Ashley Drive to Franklin Street in Tampa.

Multiple improvements will be included within the project limits.

  • Adding two right turn lanes along the I-275 NB Exit Ramp to Scott Street for traffic turning onto southbound Tampa Street
  • Installing a barrier wall along the right turn lanes
  • Installing a signal at Tampa Street for the added right turn lanes
  • Adding Intelligent Transportation Systems (ITS) devices for the new signal
  • Modifying signing and pavement markings
  • Modifying lighting at the intersection of Scott Street and Tampa Street

Construction is anticipated to begin Fall 2027.