← 1206.pdf_v_d04222026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Page 1
Download HTML
I-275 NB Exit Ramp onto Scott Street Improvements from Ashley Drive to Franklin Street 451462-2-52-01
| Project Details | |
| Work Type | IntersectionImprovements |
|---|---|
| Phase | Design |
| Limits | I-275 NB ExitRamp onto Scott Street fromAshley Drive toFranklin Street |
| Length | 0.18 miles |
| City | Tampa |
| County | Hillsborough |
| Road | I-275 |
Contact Information
Contact Information
Design Manager
Helena Ly 813-975-3690
Helena.Ly@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will improve the I-275 Northbound (NB) Exit Ramp onto Scott Street from Ashley Drive to Franklin Street in Tampa.
Multiple improvements will be included within the project limits.
- Adding two right turn lanes along the I-275 NB Exit Ramp to Scott Street for traffic turning onto southbound Tampa Street
- Installing a barrier wall along the right turn lanes
- Installing a signal at Tampa Street for the added right turn lanes
- Adding Intelligent Transportation Systems (ITS) devices for the new signal
- Modifying signing and pavement markings
- Modifying lighting at the intersection of Scott Street and Tampa Street
Construction is anticipated to begin Fall 2027.