VELCOME

to the Public Hearing for I-75 from north of Golden Gate Parkway in Collier County to south of Alico Road in Lee County

Visit us at: https://www.swflroads.com/project/452544-1

PROJECT BENEFITS

Improve Traffic Flow & Reduce Delays Increase Safety for Drivers

Support Local Businesses & Economic Development

Strengthen Transportation Network Enhance Travel Time Reliability

Reduce Evacuation & Emergency Response Times

AUXILIARY LANES

WHAT ARE AUXILIARY LANES?

An auxiliary lane allows you to travel from one entrance ramp to the next exit ramp without entering the main flow of traffic.

AUXILIARY LANE BENEFITS

Smoother merging: Gives entering and exiting drivers more room to adjust their speed and merge.

Better traffic flow: Helps keep through traffic moving by separating some merging and exiting movements from the main travel lanes.

Less weaving: Reduces the need for vehicles entering and exiting the interstate to cross paths in a short distance.

Improved connectivity: Provides additional roadway capacity between interchanges and helps manage traffic in busy areas.

HOW TO SHARE YOUR COMMENTS

IN-PERSON

EMAIL

Provide written comments on the comment form or during the presentation and verbal comment

1751 improvements@atkinsrealis.com

PROJECT WEBSITE

MAIL

www.swflroads.com/project/452544-1

FDOT District 1 Corridors Program Office 465 E. Main St. Bartow, FL 33830

Comments must be postmarked or received by November 10, 2026 to be included in the formal hearing record.

PROJECT IMPROVEMENTS

ADDITIONAL IMPROVEMENTS BEING CONSIDERED FOR CONGESTION RELIEF:

New auxiliary lanes in both directions between Golden Gate Parkway and Alico Road WE WANT YOUR INPUT!

WE WANT YOUR INPUT!

PREVIOUSLY APPROVED IMPROVEMENTS:

Resurfacing I-75 from Golden Gate Parkway to Alico Road

Adding express lanes in both directions:

  • Two express lanes from Golden Gate Parkway to Corkscrew Road
  • One express lane through the Corkscrew Road interchange

New diverging diamond interchange (DDI) at Immokalee Road

PROJECT LOCATION

PROPOSED TYPICAL SECTIONS

GOLDEN GATE TO CORKSCREW

CORKSCREW TO ALICO

These designs are conceptual only and subject to change.

MOVING FLORIDA FORWARD INFRASTRUCTURE INITIATIVE

MOVING FLORIDA FORWARD Infrastructure Initiative

CONGESTION RELIEF PROJECTS

1 U.S. 98 from R. Jackson Blvd. to Hathaway Bridge

2 SW 10th St.

3 1-75 at Pine Ridge Rd. Interchange

4 I-75 from Golden Gate Pkwy. to Corkscrew Rd. 14 I-275 from 38th Ave. N to 4th St. N

5 S.R. 29 from C.R. 846 E to New Market Rd.

6 S.R. 29 from New Market Rd to S.R. 82

16 1-4 from U.S. 27 to ChampionsGate

7 I-10 from Eastbound weigh station to Nine Mile Rd. 16 I-4 from U.S. 27 to ChampionsGate

8 S.R. 263 from S.R. 61 to C.R. 2203

S.R. 70 from Bourneside Blvd. to Waterbury Rd. 1-75 Auxiliary Lanes from S.R. 44 to S.R. 326

10 I-75 Auxiliary Lanes from S.R. 44 to S.R. 326 20 I-95 at U.S. 1 Interchange in Volusia Co.

MOVING FLORIDA FORWARD INFRASTRUCTURE INITIATIVE

  • The 2023 Florida Legislature approved the Moving Florida Forward Infrastructure Initiative to address critical state roadway needs.
  • FDOT selected key projects, including previously approved but unfunded ones with community support.
  • $4 billion from the state surplus is dedicated to accelerate construction and improve safety, congestion, and resiliency.
  • The initiative responds to rapid population growth, projected at 1,000 new residents per day for 30 years.
  • Investments focus on major interstates and arterial roads to support the movement of people and goods.
  • Combined with FDOT's ongoing work program, Florida's five-year transportation budget now totals $66.1 billion.
  • In Southwest Florida, this includes the I-75 at Pine Ridge Road Interchange Improvements in Naples, and I-75 from Golden Gate Parkway to Alico Road.