← 972.pdf_v_d04032026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
I-75/Gibsonton Drive Diverging Diamond Interchange (DDI) 437650-2-52-01
Project Details
Work TypeInterchange Modification - Add Lanes
PhaseDesign
LimitsFrom south of Gibsonton Drive to north of Riverview Drive
Length4.3 Miles
CityGibsonton Riverview
CountyHillsborough
RoadI-75
Contact Information
Design Manager
Charlie Xie
813-975-6287
Charlie.Xie@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will modify the existing diamond interchange of I-75 and Gibsonton Drive into a Diverging Diamond Interchange (DDI).
As part of this modification:
Add a deceleration lane along northbound I-75 and widen the existing northbound exit to Gibsonton Drive to 2-lanes
Provide separate on-ramps for eastbound and westbound Gibsonton Drive to northbound I-75. The on-ramp from westbound Gibsonton Drive will be converted to a 2-lane on-ramp and be built on a separate bridge structure over the Alafia River with an acceleration lane extending along northbound I-75 to north of Riverview Drive
Convert the existing southbound I-75 exit to Gibsonton to two lanes
Widen Gibsonton Drive from west of New East Bay Road to east of Fern Hill Drive
**This project is currently not funded for construction**