← 649.pdf_v_d06282024.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
Good Neighbor Trail in Downtown Brooksville along SR 50A, US 41 and Main St. 437264-2-52-01
Project Details
| Work Type | Multi-use Trail |
|---|---|
| Phase | Completed |
| Limits | meanders from west of SR 50 /SR 50A through downtown Brooksville to Main St./ Russell St. intersection |
| Project Start | September 12, 2022 |
| Length | 2.2 miles |
| City | Brooksville |
| County | Hernando |
| Road | Cortez Boulevard SR 50 SR 50A US 41 |
| Construction Cost | $20 million |
| Estimated Completion | Spring 2024 |
| Contractor | SEMA Construction, Inc. |
About
All work is completed and the project was accepted from the contractor as final on June 21, 2024.
This project built a 12 foot-wide paved multi-use trail in Brooksville.
This segment of the Good Neighbor Trail was constructed from west of the intersection of SR 50 and SR 50A along SR 50A/Jefferson Street to and through Tom Varn Park, then along US 41/Broad Street to Main Street, and along Main Street to Russell Street.
Contact Information
Project Information
John McShaffrey 813-975-6930 roadwork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us