← 649.pdf_v_d06282024.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
Good Neighbor Trail in Downtown Brooksville along SR 50A, US 41 and Main St. 437264-2-52-01
Project Details
Work TypeMulti-use Trail
PhaseCompleted
Limitsmeanders from west of SR 50 /SR 50A through downtown Brooksville to Main St./ Russell St. intersection
Project StartSeptember 12, 2022
Length2.2 miles
CityBrooksville
CountyHernando
RoadCortez Boulevard SR 50 SR 50A US 41
Construction Cost$20 million
Estimated CompletionSpring 2024
ContractorSEMA Construction, Inc.
About
All work is completed and the project was accepted from the contractor as final on June 21, 2024.
This project built a 12 foot-wide paved multi-use trail in Brooksville.
This segment of the Good Neighbor Trail was constructed from west of the intersection of SR 50 and SR 50A along SR 50A/Jefferson Street to and through Tom Varn Park, then along US 41/Broad Street to Main Street, and along Main Street to Russell Street.
Contact Information
Project Information
John McShaffrey 813-975-6930 roadwork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us