Good Neighbor Trail in Downtown Brooksville along SR 50A, US 41 and Main St. 437264-2-52-01
Project Details
| Work Type | Multi-use Trail |
|---|
| Phase | Completed |
|---|
| Limits | meanders from west of SR 50 /SR 50A through downtown
Brooksville to Main St./ Russell
St. intersection |
|---|
| Project Start | September 12, 2022 |
|---|
| Length | 2.2 miles |
|---|
| City | Brooksville |
|---|
| County | Hernando |
|---|
| Road | Cortez
Boulevard
SR 50
SR 50A
US 41 |
|---|
| Construction Cost | $20 million |
|---|
| Estimated Completion | Spring 2024 |
|---|
| Contractor | SEMA
Construction, Inc. |
|---|
All work is completed and the project was accepted from the contractor as final on June 21, 2024.
This project built a 12 foot-wide paved multi-use trail in Brooksville.
This segment of the Good Neighbor Trail was constructed from west of the intersection of SR 50 and SR 50A along SR 50A/Jefferson Street to and through Tom Varn Park, then along US 41/Broad Street to Main Street, and along Main Street to Russell Street.