← 439.pdf_v_d07082024.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
SR 687 (4th Street) Bridge Replacement 430500-1-52-01
Project Details
Work TypeBridge Replacement (2)
PhaseCompleted
Limitsfrom I-275 to 119th Ave
Project StartJanuary 10, 2022
CitySt. Petersburg
CountyPinellas
Road4th Street I-275 SR 687
Construction Cost$9 million
Estimated CompletionSpring 2024
ContractorSuperior Construction Company Southeast, LLC
Contact Information
Project Information
Maddie Pfingsten 727-575-8334 roadwork@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
About
As of November 15, 2023, all construction activities associated with this project have been completed.
This project is replacing the 4th Street bridges between I-275 and 119th Ave in Pinellas County.
The new bridges will include two twelve-foot travel lanes a six-foot inside shoulder and a ten-foot outside shoulder.
One of the bridges will also include a twelve-foot multi-use path separated by a barrier wall.
Construction is anticipated to finish spring 2024.