← 1250.pdf_v_d09282026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
SR 693 (66th Street) Resurfacing from Tyrone Boulevard to Park Boulevard 451239-1-52-01
Project Details
Work TypeMilling and Resurfacing
PhaseDesign
LimitsSR 693 (66th Street) from North Tyrone Boulevard to Park Boulevard North
Length3.2 miles
CitySt. Petersburg
CountyPinellas
Road66th Street SR 693
Contact Information
Design Manager
Indike Ratnayake 813-975-3678
Liyanage.Ratnayake@dot.state.fl.
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of SR 693 (66th Street) in Pinellas County.
In addition to resurfacing, this project also includes installing midblock crossings at 41st Avenue N, 58th Avenue N, and 68th Avenue N.
Construction is currently anticipated to begin in spring of 2029.