← 1250.pdf_v_d09282026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

SR 693 (66th Street) Resurfacing from Tyrone Boulevard to Park Boulevard 451239-1-52-01

Project Details
Work TypeMilling and Resurfacing
PhaseDesign
LimitsSR 693 (66th Street) from North Tyrone Boulevard to Park Boulevard North
Length3.2 miles
CitySt. Petersburg
CountyPinellas
Road66th Street SR 693

Contact Information

Design Manager

Indike Ratnayake 813-975-3678

Liyanage.Ratnayake@dot.state.fl.

Media Contact

Kayla Mejia 813-975-6060

Kayla.Mejia@dot.state.fl.us

About

The purpose of this project is to preserve and extend the life of the existing pavement through milling and resurfacing along this section of SR 693 (66th Street) in Pinellas County.

In addition to resurfacing, this project also includes installing midblock crossings at 41st Avenue N, 58th Avenue N, and 68th Avenue N.

Construction is currently anticipated to begin in spring of 2029.