← 1210.pdf_v_d07172026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 682 (Pinellas Bayway) Toll Plaza Removal and Roadway Improvements 254677-6-42
| Project Details | |
| Work Type | Maintenance |
|---|---|
| Phase | Construction |
| Limits | west of Dolphin Cay Lane S/Landings Drive |
| Project Start | July 13, 2026 |
| City | St. Petersburg |
| County | Pinellas |
| Road | SR 682 |
| Construction Cost | $1.2 million |
| Estimated Completion | Fall 2026 |
| Contractor | Cone & Graham, Inc. |
Contact Information
Project Information
Maddie Griffin
727-575-8334
Maddie.Griffin@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project involves converting the existing toll plaza located on SR 682 (Pinellas Bayway) just west of Dolphin Cay Lane S/Landings Drive to an all electronic tolling configuration.
These improvements will enhance traffic flow, reduce congestion, and improve safety by eliminating the need for vehicles to slow or stop at toll collection points.
This project is underway and expected to be complete by the fall of 2026.