Tampa Bay Florida Department of Transportation
SR 682 (Pinellas Bayway) Toll Plaza Removal and Roadway Improvements 254677-6-42
Project Details
Work TypeMaintenance
PhaseConstruction
Limitswest of Dolphin Cay Lane S/Landings Drive
Project StartJuly 13, 2026
CitySt. Petersburg
CountyPinellas
RoadSR 682
Construction Cost$1.2 million
Estimated CompletionFall 2026
ContractorCone & Graham, Inc.
Contact Information
Project Information Maddie Griffin 727-575-8334 Maddie.Griffin@dot.state.fl.us
Media Contact Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
About
This project involves converting the existing toll plaza located on SR 682 (Pinellas Bayway) just west of Dolphin Cay Lane S/Landings Drive to an all electronic tolling configuration.
These improvements will enhance traffic flow, reduce congestion, and improve safety by eliminating the need for vehicles to slow or stop at toll collection points.
This project is underway and expected to be complete by the fall of 2026.