Morris Bridge Road Repaving from Davis Road to Fletcher Avenue 439532-1-52-01

Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom Davis Road to Fletcher Avenue
Project StartMarch 2021
Length2.2 miles
CityTemple Terrace
CountyHillsborough
Construction Cost$4.5 million
Estimated CompletionLate 2022
ContractorRanger Construction Industries, Inc.

Contact Information

Project Information Andrew Williams 813-612-3200 Andrew.Williams@dot.state.fl.us

Media Contact

Kayla Mejia

813-975-6060

Kayla.Mejia@dot.state.fl.us

About

As of Monday, October 31, 2022, all construction activities associated with this project have been completed.

This project repaved Morris Bridge Road between Davis Road and Fletcher Avenue in Temple Terrace.

Other improvements:

  • added a six-foot sidewalk along the west side of the road between Davis Road and Fowler Avenue
  • widened the roadway between Fowler Avenue and Fletcher Avenue to provide five-foot paved shoulders on both sides of the road
  • added an eight-foot-wide shared-use path between Fisherman's Point and 127th Avenue
  • eliminated the gaps in the existing sidewalk between 127th Avenue and Fletcher Avenue

Project numbers 439532-1 and 439532-2 were combined into a single construction contract. All updates for both project numbers will be posted on this page.