← 1160.pdf_v_d08032026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 98 (SR 50A/E Jefferson Street) Resurfacing from west of Cortez Boulevard to Ponce De Leon Boulevard 451056-1-52-01
| Project Details | |
| Work Type | Milling and Resurfacing |
|---|---|
| Phase | Design |
| Limits | US 98 (SR 50A/E) Jefferson Street) from west of Cortez Blvd to Ponce De Leon Blvd |
| Length | 2.4 miles |
| City | Brooksville |
| County | Hernando |
| Road | Jefferson Street SR 50A US 98 |
Contact Information
Design Manager
Helena Ly 813-975-3690
Helena.Ly@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to rehabilitate the existing pavement through milling and resurfacing along this section of US 98 in Hernando County.
In addition to resurfacing, the project also includes repairing existing sidewalks, ADA facility upgrades, minor drainage improvements, lighting improvements, upgrading signing and pavement markings, and signalization improvements.
Construction is currently anticipated to begin in Summer 2027.