Tampa Bay Florida Department of Transportation
US 98 (SR 50A/E Jefferson Street) Resurfacing from west of Cortez Boulevard to Ponce De Leon Boulevard 451056-1-52-01
Project Details
Work TypeMilling and Resurfacing
PhaseDesign
LimitsUS 98 (SR 50A/E) Jefferson Street) from west of Cortez Blvd to Ponce De Leon Blvd
Length2.4 miles
CityBrooksville
CountyHernando
RoadJefferson Street SR 50A US 98
Contact Information
Design Manager
Helena Ly 813-975-3690
Helena.Ly@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
The purpose of this project is to rehabilitate the existing pavement through milling and resurfacing along this section of US 98 in Hernando County.
In addition to resurfacing, the project also includes repairing existing sidewalks, ADA facility upgrades, minor drainage improvements, lighting improvements, upgrading signing and pavement markings, and signalization improvements.
Construction is currently anticipated to begin in Summer 2027.